Qualified Hydro 29, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 70224 [2010-28915]

Download as PDF mstockstill on DSKH9S0YB1PROD with NOTICES 70224 Federal Register / Vol. 75, No. 221 / Wednesday, November 17, 2010 / Notices to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies VerDate Mar<15>2010 16:21 Nov 16, 2010 Jkt 223001 of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: November 30, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–28911 Filed 11–16–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13846–000] Qualified Hydro 29, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications November 9, 2010. On September 29, 2010, Qualified Hydro 29, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Mississinewa Lake Dam Hydroelectric Project No. 13846, to be located at the existing Mississinewa Lake Dam on the Mississinewa River, in the City of Peru, in Miami County, Indiana. The Mississinewa Lake Dam is owned by the United States government and operated by the U.S. Army Corps of Engineers. The proposed project would consist of: (1) The existing earth filled dam which is 140 feet in height with an overall length of 8,000 feet; (2) a new reinforced concrete powerhouse, 45 feet by 65 feet, to be located downstream of the existing stilling basin; (3) a new 75 foot-long, 10.0-foot diameter penstock; (4) two vertical Kaplan turbinegenerator units with a combined capacity of 7.0 megawatts; (5) a new 8 MVA substation; (6) a new two milelong, 12.5 to 34.5-kilovolt transmission line; and (7) appurtenant facilities. The project would have an estimated annual generation of 21.0 gigawatt-hours. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Applicant Contact: Ramya Swaminathan, 33 Commercial Street, Gloucester, MA 01930, (978) 252–7112. FERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, and competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance date of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport.gov; call toll-free at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly recommends electronic filing, documents may also be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project, including a copy of the application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13846) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–28915 Filed 11–16–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12665–003] New York Tidal Energy Company; Notice Concluding Pre-Filing Process and Approving Process Plan and Schedule November 9, 2010. a. Type of Filing: Notice of Intent to File Application for License for a Hydrokinetic Pilot Project. b. Project No.: 12665–003. c. Dated Filed: June 1, 2009. E:\FR\FM\17NON1.SGM 17NON1

Agencies

[Federal Register Volume 75, Number 221 (Wednesday, November 17, 2010)]
[Notices]
[Page 70224]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-28915]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13846-000]


Qualified Hydro 29, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

November 9, 2010.
    On September 29, 2010, Qualified Hydro 29, LLC filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Mississinewa Lake Dam 
Hydroelectric Project No. 13846, to be located at the existing 
Mississinewa Lake Dam on the Mississinewa River, in the City of Peru, 
in Miami County, Indiana. The Mississinewa Lake Dam is owned by the 
United States government and operated by the U.S. Army Corps of 
Engineers.
    The proposed project would consist of: (1) The existing earth 
filled dam which is 140 feet in height with an overall length of 8,000 
feet; (2) a new reinforced concrete powerhouse, 45 feet by 65 feet, to 
be located downstream of the existing stilling basin; (3) a new 75 
foot-long, 10.0-foot diameter penstock; (4) two vertical Kaplan 
turbine-generator units with a combined capacity of 7.0 megawatts; (5) 
a new 8 MVA substation; (6) a new two mile-long, 12.5 to 34.5-kilovolt 
transmission line; and (7) appurtenant facilities. The project would 
have an estimated annual generation of 21.0 gigawatt-hours.
    Applicant Contact: Ramya Swaminathan, 33 Commercial Street, 
Gloucester, MA 01930, (978) 252-7112.
    FERC Contact: Tyrone A. Williams, (202) 502-6331.
    Deadline for filing comments, motions to intervene, and competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance date of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' 
link. For a simpler method of submitting text only comments, click on 
``Quick Comment.'' For assistance, please contact FERC Online Support 
at FERCOnlineSupport.gov; call toll-free at (866) 208-3676; or, for 
TTY, contact (202) 502-8659. Although the Commission strongly 
recommends electronic filing, documents may also be paper-filed. To 
paper-file, an original and eight copies should be mailed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. For more information on how to 
submit these types of filings please go to the Commission's Web site 
located at https://www.ferc.gov/filing-comments.asp.
    More information about this project, including a copy of the 
application can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13846) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-28915 Filed 11-16-10; 8:45 am]
BILLING CODE 6717-01-P