Download as PDF mstockstill on DSKH9S0YB1PROD with NOTICES 70226 Federal Register / Vol. 75, No. 221 / Wednesday, November 17, 2010 / Notices a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. VerDate Mar<15>2010 16:21 Nov 16, 2010 Jkt 223001 This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: November 30, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–28910 Filed 11–16–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13875–000] Clean River Power 16, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications November 8, 2010. On October 22, 2010, Clean River Power 16, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Kitano Water Power Project, located in Kauai County, in the state of Hawaii. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following developments: (1) The existing Kokee Ditch Irrigation System comprised of multiple intakes, two reservoirs, and a series of ditches and tunnels; (2) a new upper intake including a trashrack and control gate; (3) a new 26,700-foot-long, 36-inchdiameter steel penstock; (4) a proposed 40-foot-long and 75-foot-wide upper powerhouse made with reinforced concrete; (5) a 4 MVA 4.16/695kV threephase step-up transformer located in a switchyard 50 feet from the powerhouse; (6) dependent on the results of the proposed studies, a new 2mile transmission line interconnecting with the existing utility transmission PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 line between the Kahaka switchyard and the Kaumakani substation; (7) The proposed development would have an average annual generation of 23,100 megawatt-hours. Applicant Contact: Daniel Irvin, CEO, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 252–7631. FERC Contact: Mary Greene, 202– 502–8865. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘eComment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13875) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–28908 Filed 11–16–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3041–004] Mackay Bar Corporation; Notice of Authorization for Continued Project Operation November 9, 2010. On April 28, 2008 the Mackay Bar Corporation, licensee for the Hettinger Hydroelectric Project, filed an Application to Surrender its License as E:\FR\FM\17NON1.SGM 17NON1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 75, No. 221 / Wednesday, November 17, 2010 / Notices well as a Conduit Exemption Application pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Hettinger Hydroelectric Project is located on an irrigation system in Idaho County, Idaho. The license for Project No. 3041 was issued for a period ending October 31, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 USC 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 3041 is issued to the Mackay Bar Corporation for a period effective November 1, 2010 through October 31, 2011, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before October 31, 2011, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Mackay Bar Corporation, is authorized to continue operation of the Hettinger Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Kimberly D. Bose, Secretary. [FR Doc. 2010–28913 Filed 11–16–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:21 Nov 16, 2010 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 November 4, 2010. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC11–14–000. Applicants: Front Range Power Company, LLC. Description: Application for authorization for disposition of jurisdictional facilities and request for expedited and privileged treatment of Exhibit I re Front Range Power Company. Filed Date: 10/26/2010. Accession Number: 20101027–0201. Comment Date: 5 p.m. Eastern Time on Tuesday, November 16, 2010. Docket Numbers: EC11–16–000. Applicants: Cedar Creek II, LLC, Cedar Creek Wind Energy, LLC. Description: Application of Cedar Creek Wind Energy, LLC, and Cedar Creek II, LLC, for Transaction Approval Per Federal Power Act. Filed Date: 11/03/2010. Accession Number: 20101103–5116. Comment Date: 5 p.m. Eastern Time on Wednesday, November 24, 2010. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG11–8–000. Applicants: Cedar Creek II, LLC. Description: Self-Certification of EWG Status of Cedar Creek II, LLC. Filed Date: 11/03/2010. Accession Number: 20101103–5101. Comment Date: 5 p.m. Eastern Time on Wednesday, November 24, 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER98–4336–016; ER00–1814–012; ER99–1435–024. Applicants: Spokane Energy LLC; Avista Corporation; Avista Turbine Power, Inc. Description: Avista Corporation’s et al., submits Tables 8.1a through 8.1f of the Generation Market Power Analysis revised for the correct format specified in Order 697–A. Filed Date: 10/29/2010. Accession Number: 20101101–0007. Comment Date: 5 p.m. Eastern Time on Friday, November 19, 2010. Docket Numbers: ER10–2664–001. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits tariff filing PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 70227 per 35.17(b): Resubmission of Revised SGIA and SA for FlexEnergy’s Lamb Canyon Project to be effective 11/16/ 2010. Filed Date: 11/04/2010. Accession Number: 20101104–5017. Comment Date: 5 p.m. Eastern Time on Thursday, November 18, 2010. Docket Numbers: ER10–2815–001. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits tariff filing per 35.17(b): Resubmission of Revised City of Banning Wholesale Dist Load IFA for 3rd 33kV Line to be effective 11/ 22/2010. Filed Date: 11/04/2010. Accession Number: 20101104–5018. Comment Date: 5 p.m. Eastern Time on Friday, November 26, 2010. Docket Numbers: ER11–25–001. Applicants: Avista Corporation. Description: Avista Corporation submits the OATT Service Agreement No. T–1084 to be effective 12/31/9998. Filed Date: 11/04/2010. Accession Number: 20101104–5088. Comment Date: 5 p.m. Eastern Time on Friday, November 26, 2010. Docket Numbers: ER11–2025–000. Applicants: Safe Harbor Water Power Corporation. Description: Safe Harbor Water Power Corporation submits request for a continued extension to 12/31/10 to file its baseline electronic tariffs, pursuant to Order 714. Filed Date: 11/03/2010. Accession Number: 20101103–0202. Comment Date: 5 p.m. Eastern Time on Wednesday, November 24, 2010. Docket Numbers: ER11–2026–000. Applicants: KCP&L Greater Missouri Operations Company. Description: KCP&L Greater Missouri Operations Company submits tariff filing per 35: GMO Order 739 Compliance Filing (Section 23.1) to be effective 10/1/2010. Filed Date: 11/03/2010. Accession Number: 20101103–5086. Comment Date: 5 p.m. Eastern Time on Wednesday, November 24, 2010. Docket Numbers: ER11–2027–000. Applicants: PacifiCorp. Description: PacifiCorp submits tariff filing per 35.13(a)(2)(iii): City of Nephi Vickers POD Construction Agreement to be effective 11/4/2010. Filed Date: 11/03/2010. Accession Number: 20101103–5091. Comment Date: 5 p.m. Eastern Time on Wednesday, November 24, 2010. Docket Numbers: ER11–2028–000. Applicants: EDF Industrial Power Services (IL), LLC. E:\FR\FM\17NON1.SGM 17NON1

Agencies

[Federal Register Volume 75, Number 221 (Wednesday, November 17, 2010)]
[Notices]
[Pages 70226-70227]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-28913]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Project No. 3041-004]


Mackay Bar Corporation; Notice of Authorization for Continued 
Project Operation

November 9, 2010.
    On April 28, 2008 the Mackay Bar Corporation, licensee for the 
Hettinger Hydroelectric Project, filed an Application to Surrender its 
License as

[[Page 70227]]

well as a Conduit Exemption Application pursuant to the Federal Power 
Act (FPA) and the Commission's regulations thereunder. The Hettinger 
Hydroelectric Project is located on an irrigation system in Idaho 
County, Idaho.
    The license for Project No. 3041 was issued for a period ending 
October 31, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 USC 558(c), and 
as set forth at 18 CFR 16.21(a), if the licensee of such project has 
filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 3041 is issued to 
the Mackay Bar Corporation for a period effective November 1, 2010 
through October 31, 2011, or until the issuance of a new license for 
the project or other disposition under the FPA, whichever comes first. 
If issuance of a new license (or other disposition) does not take place 
on or before October 31, 2011, notice is hereby given that, pursuant to 
18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that Mackay Bar Corporation, is authorized to continue 
operation of the Hettinger Hydroelectric Project, until such time as 
the Commission acts on its application for a subsequent license.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-28913 Filed 11-16-10; 8:45 am]
BILLING CODE 6717-01-P