Mackay Bar Corporation; Notice of Authorization for Continued Project Operation, 70226-70227 [2010-28913]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
70226
Federal Register / Vol. 75, No. 221 / Wednesday, November 17, 2010 / Notices
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
VerDate Mar<15>2010
16:21 Nov 16, 2010
Jkt 223001
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: November 30, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–28910 Filed 11–16–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13875–000]
Clean River Power 16, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
November 8, 2010.
On October 22, 2010, Clean River
Power 16, LLC filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Kitano Water Power Project, located in
Kauai County, in the state of Hawaii.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following developments:
(1) The existing Kokee Ditch Irrigation
System comprised of multiple intakes,
two reservoirs, and a series of ditches
and tunnels; (2) a new upper intake
including a trashrack and control gate;
(3) a new 26,700-foot-long, 36-inchdiameter steel penstock; (4) a proposed
40-foot-long and 75-foot-wide upper
powerhouse made with reinforced
concrete; (5) a 4 MVA 4.16/695kV threephase step-up transformer located in a
switchyard 50 feet from the
powerhouse; (6) dependent on the
results of the proposed studies, a new 2mile transmission line interconnecting
with the existing utility transmission
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
line between the Kahaka switchyard and
the Kaumakani substation; (7) The
proposed development would have an
average annual generation of 23,100
megawatt-hours.
Applicant Contact: Daniel Irvin, CEO,
Free Flow Power Corporation, 33
Commercial Street, Gloucester, MA
01930; phone: (978) 252–7631.
FERC Contact: Mary Greene, 202–
502–8865.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘eComment.’’ For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13875) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–28908 Filed 11–16–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3041–004]
Mackay Bar Corporation; Notice of
Authorization for Continued Project
Operation
November 9, 2010.
On April 28, 2008 the Mackay Bar
Corporation, licensee for the Hettinger
Hydroelectric Project, filed an
Application to Surrender its License as
E:\FR\FM\17NON1.SGM
17NON1
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 75, No. 221 / Wednesday, November 17, 2010 / Notices
well as a Conduit Exemption
Application pursuant to the Federal
Power Act (FPA) and the Commission’s
regulations thereunder. The Hettinger
Hydroelectric Project is located on an
irrigation system in Idaho County,
Idaho.
The license for Project No. 3041 was
issued for a period ending October 31,
2010. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 USC
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 3041
is issued to the Mackay Bar Corporation
for a period effective November 1, 2010
through October 31, 2011, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before October 31,
2011, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Mackay Bar Corporation, is
authorized to continue operation of the
Hettinger Hydroelectric Project, until
such time as the Commission acts on its
application for a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–28913 Filed 11–16–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:21 Nov 16, 2010
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
November 4, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–14–000.
Applicants: Front Range Power
Company, LLC.
Description: Application for
authorization for disposition of
jurisdictional facilities and request for
expedited and privileged treatment of
Exhibit I re Front Range Power
Company.
Filed Date: 10/26/2010.
Accession Number: 20101027–0201.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 16, 2010.
Docket Numbers: EC11–16–000.
Applicants: Cedar Creek II, LLC,
Cedar Creek Wind Energy, LLC.
Description: Application of Cedar
Creek Wind Energy, LLC, and Cedar
Creek II, LLC, for Transaction Approval
Per Federal Power Act.
Filed Date: 11/03/2010.
Accession Number: 20101103–5116.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 24, 2010.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG11–8–000.
Applicants: Cedar Creek II, LLC.
Description: Self-Certification of EWG
Status of Cedar Creek II, LLC.
Filed Date: 11/03/2010.
Accession Number: 20101103–5101.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 24, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER98–4336–016;
ER00–1814–012; ER99–1435–024.
Applicants: Spokane Energy LLC;
Avista Corporation; Avista Turbine
Power, Inc.
Description: Avista Corporation’s et
al., submits Tables 8.1a through 8.1f of
the Generation Market Power Analysis
revised for the correct format specified
in Order 697–A.
Filed Date: 10/29/2010.
Accession Number: 20101101–0007.
Comment Date: 5 p.m. Eastern Time
on Friday, November 19, 2010.
Docket Numbers: ER10–2664–001.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
70227
per 35.17(b): Resubmission of Revised
SGIA and SA for FlexEnergy’s Lamb
Canyon Project to be effective 11/16/
2010.
Filed Date: 11/04/2010.
Accession Number: 20101104–5017.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 18, 2010.
Docket Numbers: ER10–2815–001.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.17(b): Resubmission of Revised
City of Banning Wholesale Dist Load
IFA for 3rd 33kV Line to be effective 11/
22/2010.
Filed Date: 11/04/2010.
Accession Number: 20101104–5018.
Comment Date: 5 p.m. Eastern Time
on Friday, November 26, 2010.
Docket Numbers: ER11–25–001.
Applicants: Avista Corporation.
Description: Avista Corporation
submits the OATT Service Agreement
No. T–1084 to be effective 12/31/9998.
Filed Date: 11/04/2010.
Accession Number: 20101104–5088.
Comment Date: 5 p.m. Eastern Time
on Friday, November 26, 2010.
Docket Numbers: ER11–2025–000.
Applicants: Safe Harbor Water Power
Corporation.
Description: Safe Harbor Water Power
Corporation submits request for a
continued extension to 12/31/10 to file
its baseline electronic tariffs, pursuant
to Order 714.
Filed Date: 11/03/2010.
Accession Number: 20101103–0202.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 24, 2010.
Docket Numbers: ER11–2026–000.
Applicants: KCP&L Greater Missouri
Operations Company.
Description: KCP&L Greater Missouri
Operations Company submits tariff
filing per 35: GMO Order 739
Compliance Filing (Section 23.1) to be
effective 10/1/2010.
Filed Date: 11/03/2010.
Accession Number: 20101103–5086.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 24, 2010.
Docket Numbers: ER11–2027–000.
Applicants: PacifiCorp.
Description: PacifiCorp submits tariff
filing per 35.13(a)(2)(iii): City of Nephi
Vickers POD Construction Agreement to
be effective 11/4/2010.
Filed Date: 11/03/2010.
Accession Number: 20101103–5091.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 24, 2010.
Docket Numbers: ER11–2028–000.
Applicants: EDF Industrial Power
Services (IL), LLC.
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 75, Number 221 (Wednesday, November 17, 2010)]
[Notices]
[Pages 70226-70227]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-28913]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3041-004]
Mackay Bar Corporation; Notice of Authorization for Continued
Project Operation
November 9, 2010.
On April 28, 2008 the Mackay Bar Corporation, licensee for the
Hettinger Hydroelectric Project, filed an Application to Surrender its
License as
[[Page 70227]]
well as a Conduit Exemption Application pursuant to the Federal Power
Act (FPA) and the Commission's regulations thereunder. The Hettinger
Hydroelectric Project is located on an irrigation system in Idaho
County, Idaho.
The license for Project No. 3041 was issued for a period ending
October 31, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 USC 558(c), and
as set forth at 18 CFR 16.21(a), if the licensee of such project has
filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 3041 is issued to
the Mackay Bar Corporation for a period effective November 1, 2010
through October 31, 2011, or until the issuance of a new license for
the project or other disposition under the FPA, whichever comes first.
If issuance of a new license (or other disposition) does not take place
on or before October 31, 2011, notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Mackay Bar Corporation, is authorized to continue
operation of the Hettinger Hydroelectric Project, until such time as
the Commission acts on its application for a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-28913 Filed 11-16-10; 8:45 am]