Download as PDF mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 75, No. 218 / Friday, November 12, 2010 / Notices Take notice that on November 3, 2010, The Midwest Independent Transmission System Operator, Inc. submitted an errata reflecting changes to its October 29, 2010 compliance filing containing proposed revisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff, Fourth Revised Volume, pursuant to the Federal Energy Regulatory Commission’s (Commission) Order issued August 30, 2010, Midwest Indep. Trans. Sys. Operator, Inc., 132 FERC ¶ 61,186 (2010) (August 30 Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 24, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–28474 Filed 11–10–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 17:23 Nov 10, 2010 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1005–011] City of Boulder, CO; Notice of Availability of Environmental Assessment November 5, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has prepared an environmental assessment (EA) for an application filed by City of Boulder, Colorado (licensee) on March 10, 2009, requesting Commission approval to exempt its currently licensed Boulder Canyon Hydroelectric Project from the licensing requirements of Part I of the Federal Power Act (FPA) and to surrender its license for the project. The project is located on the Middle Boulder Creek, in Boulder County, Colorado. The licensee requests to surrender the following licensed project features: (1) The Barker Reservoir; (2) the Barker Dam; (3) the outlet structure; (4) the concrete tunnel; (5) the valve house; (6) the concrete Barker gravity pipeline; (7) the Kossler Reservoir, including the Southwest Dam, the Northeast Dam, and the West Dam; (8) the concrete outlet structure, including the trash screens and a gate; and (9) the steel penstock. The licensee states that the exempted project would consist of the existing powerhouse containing one generating unit having an installed capacity of 10 MW and appurtenant facilities. The licensee estimates that the project would have an average annual generation of 11.6 megawatt-hours that would be sold to a local utility. The EA evaluates the environmental impacts that would result from approving the licensee’s proposal for surrender of its project license and conversion to a conduit exemption. The EA finds that granting surrender of the license and issuing the exemption for the Boulder Canyon Hydroelectric Project would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is attached to a Commission Order titled ‘‘Order Granting Exemption From Licensing (Conduit) and Accepting Surrender of License,’’ issued November 5, 2010, and is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https:// PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 69433 www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number (P–1005) excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY, (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. 2010–28475 Filed 11–10–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157–188] Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Final Environmental Assessment November 4, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC’s) regulations, 18 Code of Federal Regulations (CFR) part 380 (Order No. 486, 52 Federal Register [FR] 47897), the Office of Energy Projects has reviewed Public Utility District No. 1 of Snohomish County’s application for license for the Henry M. Jackson Hydroelectric Project (FERC Project No. 2157–188), located on the Sultan River 20 miles east of the city of Everett, Snohomish County. The project currently underlies a total of 10.9 acres of federal lands in the Mount BakerSnoqualmie National Forest administered by the U.S. Department of Agriculture, Forest Service. Staff prepared a final environmental assessment (EA), which analyzes the potential environmental effects of relicensing the project, and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll- E:\FR\FM\12NON1.SGM 12NON1

Agencies

[Federal Register Volume 75, Number 218 (Friday, November 12, 2010)]
[Notices]
[Page 69433]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-28475]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1005-011]


City of Boulder, CO; Notice of Availability of Environmental 
Assessment

November 5, 2010.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office 
of Energy Projects has prepared an environmental assessment (EA) for an 
application filed by City of Boulder, Colorado (licensee) on March 10, 
2009, requesting Commission approval to exempt its currently licensed 
Boulder Canyon Hydroelectric Project from the licensing requirements of 
Part I of the Federal Power Act (FPA) and to surrender its license for 
the project. The project is located on the Middle Boulder Creek, in 
Boulder County, Colorado. The licensee requests to surrender the 
following licensed project features: (1) The Barker Reservoir; (2) the 
Barker Dam; (3) the outlet structure; (4) the concrete tunnel; (5) the 
valve house; (6) the concrete Barker gravity pipeline; (7) the Kossler 
Reservoir, including the Southwest Dam, the Northeast Dam, and the West 
Dam; (8) the concrete outlet structure, including the trash screens and 
a gate; and (9) the steel penstock. The licensee states that the 
exempted project would consist of the existing powerhouse containing 
one generating unit having an installed capacity of 10 MW and 
appurtenant facilities. The licensee estimates that the project would 
have an average annual generation of 11.6 megawatt-hours that would be 
sold to a local utility.
    The EA evaluates the environmental impacts that would result from 
approving the licensee's proposal for surrender of its project license 
and conversion to a conduit exemption. The EA finds that granting 
surrender of the license and issuing the exemption for the Boulder 
Canyon Hydroelectric Project would not constitute a major federal 
action significantly affecting the quality of the human environment.
    A copy of the EA is attached to a Commission Order titled ``Order 
Granting Exemption From Licensing (Conduit) and Accepting Surrender of 
License,'' issued November 5, 2010, and is on file with the Commission 
and is available for public inspection. The EA may also be viewed on 
the Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number (P-1005) excluding the last three digits 
in the docket number field to access the document. For assistance, 
contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free 
at 1-866-208-3372, or for TTY, (202) 502-8659.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-28475 Filed 11-10-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.