DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2677–019]
City of Kaukauna, WI; Notice of
Authorization for Continued Project
Operation
October 22, 2010.
On August 29, 2007, the City of
Kaukauna, Wisconsin, licensee for the
Badger-Rapide Croche Hydroelectric
Project, filed an Application for a New
License pursuant to the Federal Power
Act (FPA) and the Commission’s
regulations thereunder. The BadgerRapide Croche Hydroelectric Project is
on the Fox River in Outagamie County,
near the City of Kaukauna, Wisconsin.
The license for Project No. 2677, as
amended, ended on August 9, 2010.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2677
is issued to the City of Kaukauna,
Wisconsin for a period effective August
10, 2010 through August 9, 2011, or
until the issuance of a new license for
the project or other disposition under
the FPA, whichever comes first. If
issuance of a new license (or other
disposition) does not take place on or
before August 9, 2011, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that City of Kaukauna, Wisconsin, is
authorized to continue operation of the
Badger-Rapide Croche Hydroelectric
Project, until such time as the
Commission acts on its application for
a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–27401 Filed 10–28–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR11–68–000; Docket No.
PR11–69–000; Docket No. PR10–112–001;
Docket No. PR10–36–001; Docket No.
PR10–19–001; Docket No. PR11–7–000]
Notice of Baseline Filings
October 22, 2010.
ONEOK Gas Transportation, L.L.C ................................................................................................................................
Mid Continent Market Center, L.L.C ...............................................................................................................................
ONEOK Field Services Company, L.L.C ........................................................................................................................
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
ONEOK Texas Gas Storage, L.L.C ................................................................................................................................
ONEOK Westex Transmission, L.L.C .............................................................................................................................
Corning Natural Gas Corporation ...................................................................................................................................
Take notice that on October 15, 2010,
and October 19, 2010, respectively the
applicants listed above submitted a
revised baseline filing of their Statement
of Operating Conditions for services
provided under Section 311 of the
Natural Gas Policy Act of 1978
(‘‘NGPA’’).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
VerDate Mar<15>2010
15:23 Oct 28, 2010
Jkt 223001
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Docket No. PR11–68–000.
Docket No. PR11–69–000.
Docket No. PR10–112–
001.
Docket No. PR10–36–001.
Docket No. PR10–19–001.
Docket No. PR11–7–000.
Not Consolidated.
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Monday, November 1, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–27404 Filed 10–28–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 2
October 25, 2010.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP10–1009–002.
Applicants: Carolina Gas
Transmission Corporation.
E:\FR\FM\29OCN1.SGM
29OCN1
Agencies
[Federal Register Volume 75, Number 209 (Friday, October 29, 2010)]
[Notices]
[Page 66748]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-27404]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR11-68-000; Docket No. PR11-69-000; Docket No. PR10-112-
001; Docket No. PR10-36-001; Docket No. PR10-19-001; Docket No. PR11-7-
000]
Notice of Baseline Filings
October 22, 2010.
ONEOK Gas Transportation, L.L.C............................ Docket No. PR11-68-000.
Mid Continent Market Center, L.L.C......................... Docket No. PR11-69-000.
ONEOK Field Services Company, L.L.C........................ Docket No. PR10-112-001.
ONEOK Texas Gas Storage, L.L.C............................. Docket No. PR10-36-001.
ONEOK Westex Transmission, L.L.C........................... Docket No. PR10-19-001.
Corning Natural Gas Corporation............................ Docket No. PR11-7-000.
Not Consolidated.
Take notice that on October 15, 2010, and October 19, 2010,
respectively the applicants listed above submitted a revised baseline
filing of their Statement of Operating Conditions for services provided
under Section 311 of the Natural Gas Policy Act of 1978 (``NGPA'').
Any person desiring to participate in this rate proceeding must
file a motion to intervene or to protest this filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the
Applicant. Anyone filing an intervention or protest on or before the
intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 7 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on Monday, November 1, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-27404 Filed 10-28-10; 8:45 am]