Eagle and Phenix Hydro Company, Inc. and UPtown Columbus, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 66745 [2010-27400]
Download as PDF
Federal Register / Vol. 75, No. 209 / Friday, October 29, 2010 / Notices
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on November 4, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–27398 Filed 10–28–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2655–045 and 8519–009]
Eagle and Phenix Hydro Company, Inc.
and UPtown Columbus, Inc.; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
October 21, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Application: Surrender of
License and Surrender of Exemption,
respectively.
b. Project Nos.: 2655–045 and 8519–
009, respectively.
c. Date Filed: August 23, 2010.
d. Applicants: Eagle and Phenix
Hydro Company, Inc. and UPtown
Columbus Inc., respectively.
e. Name of Projects: Eagle and Phenix
Mills and City Mills Hydroelectric
Projects.
f. Location: Lower Chattahoochee
River Basin on the main stem of the
Chattahoochee River in the City of
Columbus, Muscogee County, Georgia,
and Phenix City, Russell County,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Donald H.
Clarke, Esq., Law Office of GKRSE, 1500
VerDate Mar<15>2010
15:23 Oct 28, 2010
Jkt 223001
K Street, NW., Suite 330, Washington,
DC 20005, (202) 408-5400.
i. FERC Contact: Mr. Jeremy Jessup,
(202) 502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice. All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project numbers
(P–2655–045 and P–8519–009) on any
comments, motions, or
recommendations filed.
k. Description of Request: The
applicant proposes to surrender the
license and exemption for the Eagle and
Phenix Mills (P–2655) and City Mills
(P–8519) Hydroelectric Projects,
respectively. The applicant states that
the surrenders are necessary for the
initiation of the Aquatic Ecosystem
Restoration of the Chattahoochee River.
The applicant also states that the
ecosystem restoration project would
involve the partial removal of the Eagle
and Phenix Mills and City Mills Dams.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
66745
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–27400 Filed 10–28–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\29OCN1.SGM
29OCN1
Agencies
[Federal Register Volume 75, Number 209 (Friday, October 29, 2010)]
[Notices]
[Page 66745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-27400]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2655-045 and 8519-009]
Eagle and Phenix Hydro Company, Inc. and UPtown Columbus, Inc.;
Notice of Application Accepted for Filing, Soliciting Comments, Motions
To Intervene, and Protests
October 21, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Surrender of License and Surrender of
Exemption, respectively.
b. Project Nos.: 2655-045 and 8519-009, respectively.
c. Date Filed: August 23, 2010.
d. Applicants: Eagle and Phenix Hydro Company, Inc. and UPtown
Columbus Inc., respectively.
e. Name of Projects: Eagle and Phenix Mills and City Mills
Hydroelectric Projects.
f. Location: Lower Chattahoochee River Basin on the main stem of
the Chattahoochee River in the City of Columbus, Muscogee County,
Georgia, and Phenix City, Russell County, Alabama.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Donald H. Clarke, Esq., Law Office of
GKRSE, 1500 K Street, NW., Suite 330, Washington, DC 20005, (202) 408-
5400.
i. FERC Contact: Mr. Jeremy Jessup, (202) 502-6779,
Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice. All
documents may be filed electronically via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed
electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project numbers (P-2655-045 and P-8519-009) on
any comments, motions, or recommendations filed.
k. Description of Request: The applicant proposes to surrender the
license and exemption for the Eagle and Phenix Mills (P-2655) and City
Mills (P-8519) Hydroelectric Projects, respectively. The applicant
states that the surrenders are necessary for the initiation of the
Aquatic Ecosystem Restoration of the Chattahoochee River. The applicant
also states that the ecosystem restoration project would involve the
partial removal of the Eagle and Phenix Mills and City Mills Dams.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in
the docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-27400 Filed 10-28-10; 8:45 am]
BILLING CODE 6717-01-P