Tallulah Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Tallulah Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review, 65475-65477 [2010-26823]
Download as PDF
Federal Register / Vol. 75, No. 205 / Monday, October 25, 2010 / Notices
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Monday, October 25, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–26822 Filed 10–22–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
emcdonald on DSK2BSOYB1PROD with NOTICES
[Docket No. CP10–494–000]
Tallulah Gas Storage, LLC; Notice of
Intent To Prepare an Environmental
Assessment for the Proposed Tallulah
Gas Storage Project, Request for
Comments on Environmental Issues,
and Notice of Onsite Environmental
Review
October 18, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Tallulah Gas Storage Project,
VerDate Mar<15>2010
16:05 Oct 22, 2010
Jkt 223001
involving construction and operation of
facilities by Tallulah Gas Storage, LLC
(TGS) in Madison Parish, Louisiana.
This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on November
17, 2010. Further details on how to
submit written comments are provided
in the Public Participation section of
this notice.
On November 3, 2010, the Office of
Energy Projects staff will conduct on
onsite environmental review of the
project area to gather data for its
environmental analysis of the proposed
project. Staff will examine the specific
pipeline route, leaching plant location,
caverns, well locations, and alternative
locations filed by TGS. Viewing of this
area is anticipated to be from public
access points and TGS’ right-of-way.
All interested parties are invited to
attend but must provide their own
transportation. Those attending should
meet at the following location and time:
• On November 3, 2010 at 1 p.m.
Central Time in the parking area of the
TA Travel Center at 224 Highway 65 in
Tallulah, Louisiana at Exit 171 of
Interstate-20. Meet by the company
truck with the ‘‘Tallulah Gas Storage’’
sign.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
storage company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the company could initiate
condemnation proceedings where
compensation would be determined in
accordance with State or Federal law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
65475
notice TGS provided to landowners.
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site (https://
www.ferc.gov).
Summary of the Proposed Project
TGS proposes to construct a new
natural gas storage facility within a
geologic salt dome in Madison Parish,
Louisiana. The Tallulah Gas Storage
Project would include three salt dome
storage caverns, each with a capacity of
11.4 billion cubic feet (Bcf), for a total
facility capacity of 34.2 Bcf. According
to TGS, its project would provide
storage services through
interconnections with four nearby
interstate natural gas transmission
pipelines.
The Tallulah Gas Storage Project
would consist of the following facilities:
• Three storage caverns;
• Dual 3.29-mile-long, 24-inchdiameter bidirectional natural gas
pipelines;
• One 28,410-horsepower compressor
station;
• A leaching plant;
• 14 salt water disposal wells, 3 raw
water supply wells, and 1 observation
well;
• Other appurtenant water and brine
disposal pipelines; and
• 4.5 miles of nonjurisdictional
electric distribution lines and additional
electric facilities.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 147 acres of land
for the storage facility, the pipeline
rights-of-way, and additional temporary
workspaces. Following construction,
about 74 acres would be maintained for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and allowed to revert to
former uses.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\25OCN1.SGM
25OCN1
emcdonald on DSK2BSOYB1PROD with NOTICES
65476
Federal Register / Vol. 75, No. 205 / Monday, October 25, 2010 / Notices
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA, we will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental
staff of the Commission’s Office of Energy Projects.
VerDate Mar<15>2010
16:05 Oct 22, 2010
Jkt 223001
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
Louisiana State Historic Preservation
Office (SHPO), and to solicit its views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.3 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project is further developed. On
natural gas facility projects, the APE at
a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send them so that they
will be received in Washington, DC on
or before November 17, 2010.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP10–494–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. An eComment
is an easy method for interested persons
to submit brief, text-only comments on
a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
3 The Advisory Council on Historic Preservation’s
regulations are at Title 36 of the Code of Federal
Regulations, Part 800. Historic properties are
defined in those regulations as any prehistoric or
historic district, site, building, structure, or object
included in or eligible for inclusion in the National
Register for Historic Places.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Documents and Filings. With eFiling
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
E:\FR\FM\25OCN1.SGM
25OCN1
Federal Register / Vol. 75, No. 205 / Monday, October 25, 2010 / Notices
DEPARTMENT OF ENERGY
Additional information about the
project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC, or on the FERC Web
site at https://www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and enter
the docket number, excluding the last
three digits in the Docket Number field
(i.e., CP10–494). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Any public meetings or additional site
visits will be posted on the
Commission’s calendar located at https://
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Finally, to request additional
information on the project or to provide
comments directly to the project
sponsor, you can contact TGS through
its parent company Icon NGS by calling
toll free at 1–877–318–3938 or by e-mail
at info@icon-ngs.com. Also, TGS has
established an Internet Web site at
https://www.tallulahgas.com with
additional information about the
project. In addition, TGS has made
information about the project available
to the local community by placing the
public portion of the its FERC
application in the Madison Parish
Library located at 403 North Mulberry
in Tallulah, Louisiana.
emcdonald on DSK2BSOYB1PROD with NOTICES
Additional Information
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–26823 Filed 10–22–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:05 Oct 22, 2010
Jkt 223001
[Docket Nos. CP10–457–000; CP10–458–
000]
National Fuel Gas Supply Corporation;
Notice of Availability of the
Environmental Assessment for the
Proposed Line N Projects
October 18, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Line N Projects proposed by National
Fuel Gas Supply Corporation (National
Fuel) in the above referenced docket.
National Fuel requests authorization to
abandon, construct, operate, and
maintain the Line N Relocation and
Interconnect (R&I) Project and the Line
N Compressor Installation Expansion
(CIE) Project (together, the Line N
Projects or Projects), located in Greene
and Washington Counties, Pennsylvania
(PA). National Fuel has stated that the
purpose of the proposed Project is
twofold (1) to relocate the existing Line
N, which is currently affected by mining
operations in the area and (2) increase
capacity of the system.
The EA assesses the potential
environmental effects of the
construction and operation of the Line
N Projects in accordance with the
requirements of the National
Environmental Policy Act. The FERC
staff concludes that approval of the
proposed project, with appropriate
mitigating measures, would not
constitute a major Federal action
significantly affecting the quality of the
human environment.
The proposed Line N Projects
includes the following facilities:
• Construction of 20.1 miles of
20-inch-diameter natural gas pipeline;
• Construction of the new Holbrook
M&R Station;
• Construction of the new 4,740
horsepower Buffalo Compressor Station;
and
• Abandon service, and idle
approximately 15.6 miles of existing 20inch-diameter natural gas pipeline.
The EA has been placed in the public
files of the FERC and is available for
public viewing on the FERC’s Web site
at https://www.ferc.gov using the
eLibrary link. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
65477
Copies of the EA have been mailed to
Federal, State, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that your
comments are properly recorded and
considered prior to a Commission
decision on the proposal, it is important
that the FERC receives your comments
in Washington, DC on or before
November 18, 2010.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket number (CP10–457 or CP10–458)
with your submission. The Commission
encourages electronic filing of
comments and has dedicated eFiling
expert staff available to assist you at
(202) 502–8258 or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. An eComment
is an easy method for interested persons
to submit brief, text-only comments on
a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. With eFiling
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Although your comments will be
considered by the Commission, simply
filing comments will not serve to make
the commenter a party to the
proceeding. Any person seeking to
become a party to the proceeding must
E:\FR\FM\25OCN1.SGM
25OCN1
Agencies
[Federal Register Volume 75, Number 205 (Monday, October 25, 2010)]
[Notices]
[Pages 65475-65477]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-26823]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-494-000]
Tallulah Gas Storage, LLC; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Tallulah Gas Storage Project,
Request for Comments on Environmental Issues, and Notice of Onsite
Environmental Review
October 18, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Tallulah Gas Storage Project,
involving construction and operation of facilities by Tallulah Gas
Storage, LLC (TGS) in Madison Parish, Louisiana. This EA will be used
by the Commission in its decision-making process to determine whether
the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on November 17, 2010. Further details on
how to submit written comments are provided in the Public Participation
section of this notice.
On November 3, 2010, the Office of Energy Projects staff will
conduct on onsite environmental review of the project area to gather
data for its environmental analysis of the proposed project. Staff will
examine the specific pipeline route, leaching plant location, caverns,
well locations, and alternative locations filed by TGS. Viewing of this
area is anticipated to be from public access points and TGS' right-of-
way.
All interested parties are invited to attend but must provide their
own transportation. Those attending should meet at the following
location and time:
On November 3, 2010 at 1 p.m. Central Time in the parking
area of the TA Travel Center at 224 Highway 65 in Tallulah, Louisiana
at Exit 171 of Interstate-20. Meet by the company truck with the
``Tallulah Gas Storage'' sign.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this project
and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted
by a storage company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the company could initiate
condemnation proceedings where compensation would be determined in
accordance with State or Federal law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice TGS provided to landowners. This fact sheet addresses a
number of typically-asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings. It is
also available for viewing on the FERC Web site (https://www.ferc.gov).
Summary of the Proposed Project
TGS proposes to construct a new natural gas storage facility within
a geologic salt dome in Madison Parish, Louisiana. The Tallulah Gas
Storage Project would include three salt dome storage caverns, each
with a capacity of 11.4 billion cubic feet (Bcf), for a total facility
capacity of 34.2 Bcf. According to TGS, its project would provide
storage services through interconnections with four nearby interstate
natural gas transmission pipelines.
The Tallulah Gas Storage Project would consist of the following
facilities:
Three storage caverns;
Dual 3.29-mile-long, 24-inch-diameter bidirectional
natural gas pipelines;
One 28,410-horsepower compressor station;
A leaching plant;
14 salt water disposal wells, 3 raw water supply wells,
and 1 observation well;
Other appurtenant water and brine disposal pipelines; and
4.5 miles of nonjurisdictional electric distribution lines
and additional electric facilities.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 147
acres of land for the storage facility, the pipeline rights-of-way, and
additional temporary workspaces. Following construction, about 74 acres
would be maintained for permanent operation of the project's
facilities; the remaining acreage would be restored and allowed to
revert to former uses.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
[[Page 65476]]
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping''. The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA, we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section below.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the Louisiana State Historic Preservation Office (SHPO), and to
solicit its views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\3\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project is
further developed. On natural gas facility projects, the APE at a
minimum encompasses all areas subject to ground disturbance (examples
include construction right-of-way, contractor/pipe storage yards,
compressor stations, and access roads). Our EA for this project will
document our findings on the impacts on historic properties and
summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\3\ The Advisory Council on Historic Preservation's regulations
are at Title 36 of the Code of Federal Regulations, Part 800.
Historic properties are defined in those regulations as any
prehistoric or historic district, site, building, structure, or
object included in or eligible for inclusion in the National
Register for Historic Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that your comments are timely and properly recorded, please send
them so that they will be received in Washington, DC on or before
November 17, 2010.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP10-494-000) with your
submission. The Commission encourages electronic filing of comments and
has expert eFiling staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an
easy method for interested persons to submit brief, text-only comments
on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling you
can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site.
[[Page 65477]]
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs at (866) 208-FERC, or on the
FERC Web site at https://www.ferc.gov using the ``eLibrary'' link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., CP10-494). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Any public meetings or additional site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Finally, to request additional information on the project or to
provide comments directly to the project sponsor, you can contact TGS
through its parent company Icon NGS by calling toll free at 1-877-318-
3938 or by e-mail at ngs.com">info@icon-ngs.com. Also, TGS has established an
Internet Web site at https://www.tallulahgas.com with additional
information about the project. In addition, TGS has made information
about the project available to the local community by placing the
public portion of the its FERC application in the Madison Parish
Library located at 403 North Mulberry in Tallulah, Louisiana.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-26823 Filed 10-22-10; 8:45 am]