Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Interventions, 65312 [2010-26690]
Download as PDF
65312
Federal Register / Vol. 75, No. 204 / Friday, October 22, 2010 / Notices
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–26689 Filed 10–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13831–000]
Vortex Hydro Energy, LLC; Notice of
Competing Preliminary Permit
Application Accepted for Filing and
Soliciting Comments and Interventions
emcdonald on DSK2BSOYB1PROD with NOTICES
October 15, 2010.
On August 9, 2010, Vortex Hydro
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the St. Clair
Hydrokinetic Project, located on the St.
Clair River, in St. Clair County,
Michigan. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) Two medium scale VIVACE
converters with each unit consisting of
approximately nine cylinders that is
gravity held at the bottom of the river
bed; (2) an underwater inverter that
would convert the electric signal to 3
Phase 480 Volts; and (3) a proposed
underwater cable that would transmit to
the nearby Dunn Paper Plant. The
proposed St. Clair Hydrokinetic Project
would have an estimated average annual
generation of 0.788 gigawatt-hours.
Applicant Contact: Gus Simiao, CEO,
Vortex Hydro Energy, LLC, 2512
Carpenter Road, Suite 201–A1, Ann
Arbor, MI 48108; phone: (734) 971–
4020.
FERC Contact: Bryan Roden-Reynolds
at (202) 502–6618, or via e-mail at
bryan.roden-reynolds@ferc.gov.
Competing Applications: This
application competes with Project No.
13694–000 filed March 30, 2010.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
VerDate Mar<15>2010
17:43 Oct 21, 2010
Jkt 223001
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘eComment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call toll
free at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13617) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–26690 Filed 10–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
October 13, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–85–001.
Applicants: Mystic Development,
LLC, Fore River Development, LLC,
Boston Generating, LLC, Mystic I, LLC,
Constellation Mystic Power, LLC.
Description: Response to Deficiency
Letter and Request for Shortened
Comment Period and Expedited Review
of Fore River Development, LLC, et. al.
Filed Date: 10/08/2010.
Accession Number: 20101008–5184.
Comment Date: 5 p.m. Eastern Time
on Monday, November 8, 2010.
Docket Numbers: EC11–4–000.
Applicants: Conectiv Energy Supply,
Inc.
Description: Application for approval
under Section 203 of the Federal Power
Act and request for expedited treatment
and shortened comment period.
Filed Date: 10/07/2010.
Accession Number: 20101008–0201.
Comment Date: 5 p.m. Eastern Time
on Thursday, October 28, 2010.
Docket Numbers: EC11–5–000.
Applicants: Morgan Stanley.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Description: Request for
Reauthorization and Extension of
Existing Blanket Authorization to
Acquire Securities under Section
203(a)(2) of the FPA and Request for
Expedited Action of Morgan Stanley.
Filed Date: 10/08/2010.
Accession Number: 20101008–5171.
Comment Date: 5 p.m. Eastern Time
on Friday, October 29, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER95–1528–022.
Applicants: Wisconsin Public Service
Corporation.
Description: Notice of Non-Material
Change in Status for Market-Based Rate
Authority of Wisconsin Public Service
Corporation.
Filed Date: 10/07/2010.
Accession Number: 20101007–5168.
Comment Date: 5 p.m. Eastern Time
on Thursday, October 28, 2010.
Docket Numbers: ER97–324–020;
ER97–3834–026.
Applicants: DTE Energy Trading, Inc.,
The Detroit Edison Company
Description: Application of The
Detroit Edison Company and DTE
Energy Trading, Inc. for Continued
Waiver of Affiliate Restrictions related
to The Detroit Edison Company’s
Summer 2011 Auction for Capacity.
Filed Date: 10/12/2010.
Accession Number: 20101012–5365.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 2, 2010.
Docket Numbers: ER10–1520–001;
ER10–1521–001; ER10–1522–001.
Applicants: Occidental Power
Services, Inc., Occidental Power
Marketing, LP, Occidental Chemical
Corporation.
Description: Errata to Notice of
Change in Status of Occidental Power
Services, Inc., et. al.
Filed Date: 10/12/2010.
Accession Number: 20101012–5272.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 2, 2010.
Docket Numbers: ER10–2078–000;
ER10–2078–001.
Applicants: White Oak Energy LLC.
Description: Supplement to MarketBased Rate Application of White Oak
Energy LLC.
Filed Date: 10/08/2010.
Accession Number: 20101008–5169.
Comment Date: 5 p.m. Eastern Time
on Friday, October 22, 2010.
Docket Numbers: ER11–59–000.
Applicants: Entergy Texas, Inc.,
Entergy Arkansas, Inc., Entergy Gulf
States Louisiana, LLC, Entergy
Louisiana, LLC, Entergy Mississippi,
Inc., Entergy New Orleans, Inc.
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 75, Number 204 (Friday, October 22, 2010)]
[Notices]
[Page 65312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-26690]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13831-000]
Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit
Application Accepted for Filing and Soliciting Comments and
Interventions
October 15, 2010.
On August 9, 2010, Vortex Hydro Energy, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act, proposing to study the feasibility of the St. Clair Hydrokinetic
Project, located on the St. Clair River, in St. Clair County, Michigan.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of: (1) Two medium scale VIVACE
converters with each unit consisting of approximately nine cylinders
that is gravity held at the bottom of the river bed; (2) an underwater
inverter that would convert the electric signal to 3 Phase 480 Volts;
and (3) a proposed underwater cable that would transmit to the nearby
Dunn Paper Plant. The proposed St. Clair Hydrokinetic Project would
have an estimated average annual generation of 0.788 gigawatt-hours.
Applicant Contact: Gus Simiao, CEO, Vortex Hydro Energy, LLC, 2512
Carpenter Road, Suite 201-A1, Ann Arbor, MI 48108; phone: (734) 971-
4020.
FERC Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail
at bryan.roden-reynolds@ferc.gov.
Competing Applications: This application competes with Project No.
13694-000 filed March 30, 2010.
Deadline for filing comments and motions to intervene: 60 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' link. For a simpler
method of submitting text only comments, click on ``eComment.'' For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call toll free at (866) 208-3676; or, for
TTY, contact (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and eight copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13617) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-26690 Filed 10-21-10; 8:45 am]
BILLING CODE 6717-01-P