Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting and the Entergy Regional State Committee Meeting, 63168-63169 [2010-25797]
Download as PDF
63168
Federal Register / Vol. 75, No. 198 / Thursday, October 14, 2010 / Notices
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Wednesday, October 27, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–25795 Filed 10–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–3337–000]
Ridgewind Power Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
October 6, 2010.
jlentini on DSKJ8SOYB1PROD with NOTICES
This is a supplemental notice in the
above-referenced proceeding of
Ridgewind Power Partners, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
OA07–32 ..................
OA08–59 ..................
EL00–66 ...................
EL01–88 ...................
EL07–52 ...................
EL08–51 ...................
EL08–60 ...................
EL09–43 ...................
EL09–50 ...................
EL09–61 ...................
EL09–78 ...................
EL10–55 ...................
EL10–65 ...................
ER05–1065 ..............
ER07–682 ................
ER07–956 ................
ER08–767 ................
ER08–1056 ..............
ER09–636 ................
ER09–833 ................
ER09–1214 ..............
ER09–1224 ..............
ER10–794 ................
VerDate Mar<15>2010
16:30 Oct 13, 2010
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 26,
2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–25796 Filed 10–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of FERC Staff Attendance at the
Southwest Power Pool ICT Stakeholder
Policy Committee Meeting and the
Entergy Regional State Committee
Meeting
October 6, 2010.
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meetings noted below. Their
attendance is part of the Commission’s
ongoing outreach efforts.
ICT Stakeholder Policy Committee
Meeting
October 20, 2010 (8 a.m.–12 p.m.), Hyatt
Regency Downtown Austin, 208
Barton Springs Road, Austin, TX
78704, 888–421–1442.
Entergy Regional State Committee
Meeting
October 20, 2010 (1 p.m.–5 p.m.),
October 21, 2010 (8 a.m.–12 p.m.),
Hyatt Regency Downtown Austin, 208
Barton Springs Road, Austin, TX
78704, 888–421–1442.
The discussions may address matters
at issue in the following proceedings:
Entergy Services, Inc.
Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Ameren Services Co. v. Entergy Services, Inc.
Arkansas Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
South Mississippi Electric Power Association v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Jkt 223001
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
E:\FR\FM\14OCN1.SGM
14OCN1
Federal Register / Vol. 75, No. 198 / Thursday, October 14, 2010 / Notices
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
ER10–879 ................
ER10–984 ................
ER10–1350 ..............
ER10–1367 ..............
ER10–1763 ..............
ER10–1764 ..............
ER10–1765 ..............
ER10–1766 ..............
ER10–1767 ..............
ER10–1769 ..............
ER10–2216 ..............
ER10–2223 ..............
ER10–2224 ..............
ER10–2226 ..............
ER10–2228 ..............
ER10–2247 ..............
ER10–2267 ..............
ER10–2292 ..............
ER10–2299 ..............
ER10–2748 ..............
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Entergy
Services, Inc.
Services, Inc.
Services, Inc.
Services, Inc.
Arkansas, Inc.
Gulf States, Louisiana, Inc.
Louisiana, LLC.
Mississippi, Inc.
Texas, Inc.
New Orleans, Inc.
Arkansas, Inc.
Mississippi, Inc.
Texas, Inc.
Louisiana, LLC.
New Orleans, Inc.
Services, Inc.
Services, Inc.
Services, Inc.
Services, Inc.
Services, Inc.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–25797 Filed 10–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI10–21–000]
Dirk Wiggins; Notice of Petition for
Declaratory Order and Soliciting
Comments, Protests, and/or Motions
To Intervene
jlentini on DSKJ8SOYB1PROD with NOTICES
October 6, 2010.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Petition for
Declaratory Order.
b. Docket No.: DI10–21–000.
c. Date Filed: September 9, 2010.
d. Applicant: Dirk Wiggins.
e. Name of Project: Duane Wiggins
Hydro Project.
f. Location: The existing Duane
Higgins Hydro Project is located on
Spring Creek, near the town of Joseph,
Wallowa County, Oregon, affecting T. 03
S., R. 45 E., sec. 28, Willamette
Meridian.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Dirk Wiggins,
84646 Ponderosa Lane, Joseph, Oregon
97846; telephone: (541) 432–5263;
VerDate Mar<15>2010
16:30 Oct 13, 2010
Jkt 223001
63169
E-mail: https://
www.dirk.wiggins@gmail.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or E-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: November 8,
2010.
All documents should be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be filed with:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. Please include the
docket number (DI10–21–000) on any
comments, protests, and/or motions
filed.
k. Description of Project: The existing
Duane Wiggins Hydro Project consists
of: (1) A 13-foot-long, 3.75-foot-wide, 2foot-deep pond; (2) a 1-foot-high lumber
diversion into 2.5-foot-high, 3.75-footwide wooden box; (2) a 4.5-inchdiameter, 1,367-foot-long steel pipe
penstock; (3) a 8-foot-long, 10-foot-wide
steel powerhouse containing a 20-kW
Pelton-type turbine/generator; (4) a 40foot-long tailrace to Spring Creek; (5) a
1,000-foot-long transmission line; and
(6) appurtenant facilities. The project
will be connected to an interstate grid.
When a Petition for Declaratory Order
is filed with the Federal Energy
Regulatory Commission, the Federal
Power Act requires the Commission to
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
investigate and determine if the
interests of interstate or foreign
commerce would be affected by the
proposed project. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy or affect
public lands or reservations of the
United States; (3) would utilize surplus
water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 75, Number 198 (Thursday, October 14, 2010)]
[Notices]
[Pages 63168-63169]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25797]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of FERC Staff Attendance at the Southwest Power Pool ICT
Stakeholder Policy Committee Meeting and the Entergy Regional State
Committee Meeting
October 6, 2010.
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of its staff may attend the meetings noted below.
Their attendance is part of the Commission's ongoing outreach efforts.
ICT Stakeholder Policy Committee Meeting
October 20, 2010 (8 a.m.-12 p.m.), Hyatt Regency Downtown Austin, 208
Barton Springs Road, Austin, TX 78704, 888-421-1442.
Entergy Regional State Committee Meeting
October 20, 2010 (1 p.m.-5 p.m.), October 21, 2010 (8 a.m.-12 p.m.),
Hyatt Regency Downtown Austin, 208 Barton Springs Road, Austin, TX
78704, 888-421-1442.
The discussions may address matters at issue in the following
proceedings:
------------------------------------------------------------------------
------------------------------------------------------------------------
Docket No. OA07-32........................... Entergy Services, Inc.
Docket No. OA08-59........................... Entergy Services, Inc.
Docket No. EL00-66........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL01-88........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL07-52........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL08-51........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL08-60........................... Ameren Services Co. v.
Entergy Services, Inc.
Docket No. EL09-43........................... Arkansas Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL09-50........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL09-61........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL09-78........................... South Mississippi
Electric Power
Association v. Entergy
Services, Inc.
Docket No. EL10-55........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. EL10-65........................... Louisiana Public Service
Commission v. Entergy
Services, Inc.
Docket No. ER05-1065......................... Entergy Services, Inc.
Docket No. ER07-682.......................... Entergy Services, Inc.
Docket No. ER07-956.......................... Entergy Services, Inc.
Docket No. ER08-767.......................... Entergy Services, Inc.
Docket No. ER08-1056......................... Entergy Services, Inc.
Docket No. ER09-636.......................... Entergy Services, Inc.
Docket No. ER09-833.......................... Entergy Services, Inc.
Docket No. ER09-1214......................... Entergy Services, Inc.
Docket No. ER09-1224......................... Entergy Services, Inc.
Docket No. ER10-794.......................... Entergy Services, Inc.
[[Page 63169]]
Docket No. ER10-879.......................... Entergy Services, Inc.
Docket No. ER10-984.......................... Entergy Services, Inc.
Docket No. ER10-1350......................... Entergy Services, Inc.
Docket No. ER10-1367......................... Entergy Services, Inc.
Docket No. ER10-1763......................... Entergy Arkansas, Inc.
Docket No. ER10-1764......................... Entergy Gulf States,
Louisiana, Inc.
Docket No. ER10-1765......................... Entergy Louisiana, LLC.
Docket No. ER10-1766......................... Entergy Mississippi, Inc.
Docket No. ER10-1767......................... Entergy Texas, Inc.
Docket No. ER10-1769......................... Entergy New Orleans, Inc.
Docket No. ER10-2216......................... Entergy Arkansas, Inc.
Docket No. ER10-2223......................... Entergy Mississippi, Inc.
Docket No. ER10-2224......................... Entergy Texas, Inc.
Docket No. ER10-2226......................... Entergy Louisiana, LLC.
Docket No. ER10-2228......................... Entergy New Orleans, Inc.
Docket No. ER10-2247......................... Entergy Services, Inc.
Docket No. ER10-2267......................... Entergy Services, Inc.
Docket No. ER10-2292......................... Entergy Services, Inc.
Docket No. ER10-2299......................... Entergy Services, Inc.
Docket No. ER10-2748......................... Entergy Services, Inc.
------------------------------------------------------------------------
These meetings are open to the public.
For more information, contact Patrick Clarey, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-25797 Filed 10-13-10; 8:45 am]