San Diego Gas and Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange Corporation; Notice of Filing, 63167-63168 [2010-25795]

Download as PDF jlentini on DSKJ8SOYB1PROD with NOTICES Federal Register / Vol. 75, No. 198 / Thursday, October 14, 2010 / Notices b. Docket No: DI10–19–000. c. Date Filed: September 17, 2010. d. Applicant: Howard Rosenfeld. e. Name of Project: Warren Energy Independence Hydroelectric Project. f. Location: The proposed Warren Energy Independence Hydroelectric Project will be located on Sucker Brook, a.k.a. Lake Waramaug Brook, tributary to Aspetuck River and the Housatonic River, near the town of Warren, Litchfield County, Connecticut. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Paul V. Nolan, 5515 North 17th Street, Arlington, VA 22205–2722; telephone: (703) 534–5509; Fax: (703) 538–5257; e-mail: https:// www.pvnpvn@aol.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or E-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: November 08, 2010. All documents should be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. Please include the docket number (DI10–19–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Warren Energy Independence Hydroelectric Project will consist of: (1) An existing natural lake; (2) an existing 80-foot-long, 4-foot-wide, 5-foot-high masonry dam; (3) a proposed 18-inchdiameter, 535-foot-long PVC penstock; (4) an existing 22-foot-long, 22-footwide, 25-foot-high existing mill building, containing a new 10-kW turbine/generator; (5) a bank of batteries for use on site; and (6) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or VerDate Mar<15>2010 16:30 Oct 13, 2010 Jkt 223001 not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 63167 obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. 2010–25793 Filed 10–13–10; 8:45 am] BILLING CODE 6717–01–PGPO Galley End:?≤ DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL00–95–244; Docket No. EL00–98–228] San Diego Gas and Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Investigation of Practices of the California Independent System Operator and the California Power Exchange Corporation; Notice of Filing October 6, 2010. Take notice that on October 6, 2010, the California Power Exchange Corporation filed supplemental information to its May 4, 2010 refund compliance report, which was filed pursuant to the Federal Energy Regulatory Commission’s November 20, 2008 Order on Rehearing and Motions for Clarification and Accounting, 125 FERC ¶ 61,214. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, E:\FR\FM\14OCN1.SGM 14OCN1 63168 Federal Register / Vol. 75, No. 198 / Thursday, October 14, 2010 / Notices 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Wednesday, October 27, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–25795 Filed 10–13–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10–3337–000] Ridgewind Power Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization October 6, 2010. jlentini on DSKJ8SOYB1PROD with NOTICES This is a supplemental notice in the above-referenced proceeding of Ridgewind Power Partners, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. OA07–32 .................. OA08–59 .................. EL00–66 ................... EL01–88 ................... EL07–52 ................... EL08–51 ................... EL08–60 ................... EL09–43 ................... EL09–50 ................... EL09–61 ................... EL09–78 ................... EL10–55 ................... EL10–65 ................... ER05–1065 .............. ER07–682 ................ ER07–956 ................ ER08–767 ................ ER08–1056 .............. ER09–636 ................ ER09–833 ................ ER09–1214 .............. ER09–1224 .............. ER10–794 ................ VerDate Mar<15>2010 16:30 Oct 13, 2010 Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 26, 2010. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. 2010–25796 Filed 10–13–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting and the Entergy Regional State Committee Meeting October 6, 2010. The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meetings noted below. Their attendance is part of the Commission’s ongoing outreach efforts. ICT Stakeholder Policy Committee Meeting October 20, 2010 (8 a.m.–12 p.m.), Hyatt Regency Downtown Austin, 208 Barton Springs Road, Austin, TX 78704, 888–421–1442. Entergy Regional State Committee Meeting October 20, 2010 (1 p.m.–5 p.m.), October 21, 2010 (8 a.m.–12 p.m.), Hyatt Regency Downtown Austin, 208 Barton Springs Road, Austin, TX 78704, 888–421–1442. The discussions may address matters at issue in the following proceedings: Entergy Services, Inc. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Ameren Services Co. v. Entergy Services, Inc. Arkansas Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. South Mississippi Electric Power Association v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Jkt 223001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\14OCN1.SGM 14OCN1

Agencies

[Federal Register Volume 75, Number 198 (Thursday, October 14, 2010)]
[Notices]
[Pages 63167-63168]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25795]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL00-95-244; Docket No. EL00-98-228]


San Diego Gas and Electric Company v. Sellers of Energy and 
Ancillary Services Into Markets Operated by the California Independent 
System Operator Corporation and the California Power Exchange; 
Investigation of Practices of the California Independent System 
Operator and the California Power Exchange Corporation; Notice of 
Filing

October 6, 2010.
    Take notice that on October 6, 2010, the California Power Exchange 
Corporation filed supplemental information to its May 4, 2010 refund 
compliance report, which was filed pursuant to the Federal Energy 
Regulatory Commission's November 20, 2008 Order on Rehearing and 
Motions for Clarification and Accounting, 125 FERC ] 61,214.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission,

[[Page 63168]]

888 First Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on Wednesday, October 27, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-25795 Filed 10-13-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.