Notice of Actions Taken at September 16, 2010, Meeting, 63254-63255 [2010-25792]
Download as PDF
63254
Federal Register / Vol. 75, No. 198 / Thursday, October 14, 2010 / Notices
SAFEGUARDS:
All individuals with access to the
records covered by this system of
records receive cyber security awareness
training which covers the procedures for
handling classified and Sensitive-butUnclassified information, including
personally identifiable information.
Annual refresher training is mandatory.
Individuals with access undergo a
background security investigation. All
paper records are maintained in secured
filing cabinets or in restricted areas,
access to which is limited to authorized
personnel only. Access to electronic
records is password-protected and
under the supervision of the
information owner. Access privileges
reflect separation of duties and least
privilege, and are only extended to
those Department personnel who have a
need for the records in the performance
of their duties. Individuals who are
authorized to examine detailed
information about the network and
system usage of specific users are
assigned privileged system accounts for
that purpose. When it is determined that
an individual no longer requires access,
his or her account is disabled.
See National Archives and Records
Administration General Records
Schedule 20.1 (Files/Records Relating to
the Creation, Use, and Maintenance of
Computer Systems, Applications, or
Electronic Records) and 24.6 (User
Identification, Profiles, Authorizations,
and Password Files). Records are
deleted when no longer needed for
administrative, legal, audit, or other
operational purposes.
SYSTEM MANAGER AND ADDRESS:
Chief Information Officer, Department
of State, 2201 C Street, NW.,
Washington, DC 20520.
jlentini on DSKJ8SOYB1PROD with NOTICES
NOTIFICATION PROCEDURES:
Individuals who have reason to
believe that this system of records may
contain information pertaining to them
may write the Director, Office of
Information Programs and Services,
Department of State, SA–2, 515 22nd
Street, NW., Washington, DC 20522–
8001. At a minimum, the individual
should include the name of this system
of records; their name, current mailing
address, zip code, and signature; and a
brief description of the circumstances
that caused the individual to believe
that the system of records contains
records pertaining to them, including
the specific geographic locations,
overseas missions, or individual offices
in which the individual believes he or
she may have accessed or is believed to
16:30 Oct 13, 2010
RECORD ACCESS AND AMENDMENT PROCEDURES:
Individuals who wish to gain access
to or amend records pertaining to them
should write to the Director, Office of
Information Programs and Services,
Department of State, SA–2, 515 22nd
Street, NW., Washington, DC 20522–
8001.
RECORD SOURCE CATEGORIES:
Individuals about whom the record is
maintained; information systems,
applications, and services within a
Department network that record usage
by individuals assigned a user account
on that network.
EXEMPTIONS CLAIMED FOR THE SYSTEM:
None.
[FR Doc. 2010–25884 Filed 10–13–10; 8:45 am]
BILLING CODE 4710–00–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Notice of Actions Taken at September
16, 2010, Meeting
Susquehanna River Basin
Commission.
ACTION: Notice of Commission Actions.
AGENCY:
RETENTION AND DISPOSAL:
VerDate Mar<15>2010
have accessed the Department’s
computer systems.
Jkt 223001
At its regular business
meeting on September 16, 2010, in
Corning, New York, the Commission
held a public hearing as part of its
regular business meeting. At the public
hearing, the Commission: (1) Approved
settlements involving three water
resources projects; (2) approved and
tabled certain water resources projects,
including approval of one project
involving diversions into the basin; and
(3) rescinded approval for two water
resources projects.
DATES: September 16, 2010.
ADDRESSES: Susquehanna River Basin
Commission, 1721 N. Front Street,
Harrisburg, PA 17102–2391.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436; e-mail: rcairo@srbc.net;
or Stephanie L. Richardson, Secretary to
the Commission, telephone: (717) 238–
0423, ext. 304; fax: (717) 238–2436;
e-mail: srichardson@srbc.net. Regular
mail inquiries may be sent to the above
address.
SUPPLEMENTARY INFORMATION: In
addition to the public hearing and its
related action items identified below,
the following items were also presented
or acted on at the business meeting: (1)
An update on the SRBC Remote Water
SUMMARY:
PO 00000
Frm 00114
Fmt 4703
Sfmt 4703
Quality Monitoring Network; (2) a
report on the present hydrologic
conditions of the basin; (3) approval of
a final rulemaking amending 18 CFR
parts 806 and 808; (4) ratification/
approval of grants/contracts; and (5)
amendment of Resolution No. 2010–03
adopting a FY–2012 budget
commencing July 1, 2011. The
Commission heard counsel’s report on
legal matters affecting the Commission.
The Commission also convened a public
hearing and took the following actions:
Public Hearing—Compliance Matters
The Commission approved a
settlement in lieu of civil penalties for
the following projects:
1. Talisman Energy USA Inc. Pad ID:
Castle 01 047 (ABR–20100128),
Armenia Township; Harvest Holdings
01 036 (ABR–20100225), Canton
Township; and Putnam 01 076 (ABR–
20100233), Armenia Township;
Bradford County, Pa.—$8,280
2. Cabot Oil & Gas Corporation.
Withdrawal ID: Susquehanna River-3
(Docket No. 20080905), Great Bend
Borough, Susquehanna County, Pa.—
$5,000
3. Seneca Resources Corporation. Pad
ID: M. Pino H (ABR–20090933), DCNR
100 1V (ABR–20090436), Wilcox F
(ABR–20090505), T. Wivell (ABR–
20090814), Wivell I (ABR–20100607),
DCNR 595 E (ABR–20100307), DCNR
595 D (ABR–20090827); Withdrawal ID:
Arnot 5—Signor (Docket No.
20090908).—$35,000
Public Hearing—Projects Approved
1. Project Sponsor and Facility:
Anadarko E&P Company LP (Beech
Creek), Snow Shoe Township, Centre
County, Pa. Surface water withdrawal of
up to 0.249 mgd.
2. Project Sponsor and Facility:
Anadarko E&P Company LP (Pine
Creek—2), McHenry Township,
Lycoming County, Pa. Surface water
withdrawal of up to 0.499 mgd.
3. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Monroe Manor Water System, Monroe
Township, Snyder County, Pa.
Groundwater withdrawal of up to 0.180
mgd from Well 4.
4. Project Sponsor and Facility: Buck
Ridge Stone, LLC (Salt Lick Creek), New
Milford Township, Susquehanna
County, Pa. Surface water withdrawal of
up to 0.083 mgd.
5. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River), Mehoopany
Township, Wyoming County, Pa.
Modification to project features of the
withdrawal approval (Docket No.
20080923).
E:\FR\FM\14OCN1.SGM
14OCN1
Federal Register / Vol. 75, No. 198 / Thursday, October 14, 2010 / Notices
6. Project Sponsor and Facility: Citrus
Energy (Susquehanna River),
Washington Township, Wyoming
County, Pa. Surface water withdrawal of
up to 1.994 mgd.
7. Project Sponsor and Facility: Geary
Enterprises (Buttermilk Creek), Falls
Township, Wyoming County, Pa.
Surface water withdrawal of up to 0.099
mgd.
8. Project Sponsor: New Morgan
Landfill Company, Inc. Project Facility:
Conestoga Landfill, New Morgan
Borough, Berks County, Pa.
Groundwater withdrawal of up to 0.003
mgd from the Shop Well and surface
water withdrawal of up to 0.249 mgd
from the Quarry Pond.
9. Project Sponsor and Facility: Novus
Operating, LLC (Cowanesque River),
Westfield Township, Tioga County, Pa.
Surface water withdrawal of up to 0.750
mgd.
10. Project Sponsor and Facility:
Smith Transport Warehouse (Bald Eagle
Creek), Snyder Township, Blair County,
Pa. Surface water withdrawal of up to
0.160 mgd.
11. Project Sponsor and Facility:
Sugar Hollow Trout Park and Hatchery,
Eaton Township, Wyoming County, Pa.
Groundwater withdrawal of up to 0.864
mgd combined total from Wells 1, 2,
and 3 (Hatchery Well Field).
12. Project Sponsor and Facility:
Talisman Energy USA Inc. (Seeley
Creek), Wells Township, Bradford
County, Pa. Surface water withdrawal of
up to 0.750 mgd.
13. Project Sponsor and Facility:
Talisman Energy USA Inc. (Wyalusing
Creek), Stevens Township, Bradford
County, Pa. Surface water withdrawal of
up to 2.000 mgd.
14. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Snake Creek), Liberty Township,
Susquehanna County, Pa. Modification
to project features of the withdrawal
approval (Docket No. 20090302).
jlentini on DSKJ8SOYB1PROD with NOTICES
1. Project Sponsor and Facility:
Anadarko E&P Company LP (Wolf Run),
Snow Shoe Township, Centre County,
Pa. Application for surface water
withdrawal of up to 0.499 mgd.
2. Project Sponsor and Facility: Chief
Oil & Gas LLC (Martins Creek), Hop
Bottom Borough, Susquehanna County,
Pa. Application for surface water
withdrawal of up to 0.360 mgd.
3. Project Sponsor and Facility:
Mansfield Borough Municipal
Authority, Richmond Township, Tioga
County, Pa. Application for
groundwater withdrawal of up to 0.079
mgd from Well 3.
16:30 Oct 13, 2010
Jkt 223001
Public Hearing—Diversion Project
Approved
1. Project Sponsor: Gettysburg
Municipal Authority. Project Facility:
Hunterstown Wastewater Treatment
Plant, Straban Township, Adams
County, Pa. Application for an existing
into-basin diversion of up to 0.123 mgd
from the Potomac River Basin.
Public Hearing—Rescission of Project
Approvals
1. Project Sponsor: McNeil PPC.
Project Facility: Johnson & Johnson
(Docket No. 20050906), Lititz Borough,
Lancaster County, Pa.
2. Project Sponsor: Northampton Fuel
Supply Company, Inc. Project Facility:
Loomis Bank Operation (Docket No.
20040904), Hanover Township, Luzerne
County, Pa.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: September 30, 2010.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2010–25792 Filed 10–13–10; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Air Traffic Procedures Advisory
Committee Meeting
Federal Aviation
Administration (FAA), DOT.
SUMMARY: The FAA is issuing this notice
to advise the public that a meeting of
the Federal Aviation Administration Air
Traffic Procedures Advisory Committee
(ATPAC) will be held to review present
air traffic control procedures and
practices for standardization, revision,
clarification, and upgrading of
terminology and procedures.
DATES: The meeting will be held
Tuesday, October 26, and Wednesday
October 27, 2010 from 8:30 a.m. to
5 p.m.
ADDRESSES: The meeting will be held at
Gaylord National Resort, and
AGENCY:
Public Hearing—Projects Tabled
VerDate Mar<15>2010
4. Project Sponsor and Facility: Novus
Operating, LLC (Tioga River), Covington
Township, Tioga County, Pa.
Application for surface water
withdrawal of up to 1.750 mgd.
5. Project Sponsor and Facility:
Walker Township Water Association,
Walker Township, Centre County, Pa.
Modification to increase the total
groundwater system withdrawal limit
(30-day average) from 0.523 mgd to
0.962 mgd (Docket No. 20070905).
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
63255
Convention Center, 201 Waterfront St.,
National Harbor, MD 20745.
FOR FURTHER INFORMATION CONTACT: Mr.
Richard Jehlen, ATPAC Executive
Director, 800 Independence Avenue,
SW., Washington, DC 20591. Telephone
(202) 493–4527.
SUPPLEMENTARY INFORMATION: Pursuant
to Section 10(a)(2) of the Federal
Advisory Committee Act (Pub. L. 92–
463; 5 U.S.C. App.2), notice is hereby
given of a meeting of the ATPAC to be
held Tuesday, October 26, and
Wednesday, October 27, 2010, from
8:30 a.m. to 5 p.m.
The agenda for this meeting will cover
a continuation of the ATPAC’s review of
present air traffic control procedures
and practices for standardization,
revision, clarification, and upgrading of
terminology and procedures. It will also
include:
1. Approval of Minutes;
2. Submission and Discussion of
Areas of Concern;
3. Discussion of Potential Safety
Items;
4. Report from Executive Director;
5. Items of Interest; and
6. Discussion and agreement of
location and dates for subsequent
meetings.
Attendance is open to the interested
public but limited to space available.
With the approval of the Chairperson,
members of the public may present oral
statements at the meeting. Persons
desiring to attend and persons desiring
to present oral statements should notify
Mr. Richard Jehlen no later than October
19, 2010. Any member of the public
may present a written statement to the
ATPAC at any time at the address given
above.
Issued in Washington, DC, on October 6,
2010.
Richard Jehlen,
Executive Director, Air Traffic Procedures
Advisory Committee.
[FR Doc. 2010–25838 Filed 10–13–10; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
[Docket No. FMCSA–2010–0187]
Qualification of Drivers; Exemption
Applications; Vision
Federal Motor Carrier Safety
Administration (FMCSA), DOT.
ACTION: Notice of final disposition.
AGENCY:
FMCSA announces its
decision to exempt 21 individuals from
SUMMARY:
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 75, Number 198 (Thursday, October 14, 2010)]
[Notices]
[Pages 63254-63255]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25792]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Notice of Actions Taken at September 16, 2010, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice of Commission Actions.
-----------------------------------------------------------------------
SUMMARY: At its regular business meeting on September 16, 2010, in
Corning, New York, the Commission held a public hearing as part of its
regular business meeting. At the public hearing, the Commission: (1)
Approved settlements involving three water resources projects; (2)
approved and tabled certain water resources projects, including
approval of one project involving diversions into the basin; and (3)
rescinded approval for two water resources projects.
DATES: September 16, 2010.
ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front Street,
Harrisburg, PA 17102-2391.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; e-mail:
rcairo@srbc.net; or Stephanie L. Richardson, Secretary to the
Commission, telephone: (717) 238-0423, ext. 304; fax: (717) 238-2436;
e-mail: srichardson@srbc.net. Regular mail inquiries may be sent to the
above address.
SUPPLEMENTARY INFORMATION: In addition to the public hearing and its
related action items identified below, the following items were also
presented or acted on at the business meeting: (1) An update on the
SRBC Remote Water Quality Monitoring Network; (2) a report on the
present hydrologic conditions of the basin; (3) approval of a final
rulemaking amending 18 CFR parts 806 and 808; (4) ratification/approval
of grants/contracts; and (5) amendment of Resolution No. 2010-03
adopting a FY-2012 budget commencing July 1, 2011. The Commission heard
counsel's report on legal matters affecting the Commission. The
Commission also convened a public hearing and took the following
actions:
Public Hearing--Compliance Matters
The Commission approved a settlement in lieu of civil penalties for
the following projects:
1. Talisman Energy USA Inc. Pad ID: Castle 01 047 (ABR-20100128),
Armenia Township; Harvest Holdings 01 036 (ABR-20100225), Canton
Township; and Putnam 01 076 (ABR-20100233), Armenia Township; Bradford
County, Pa.--$8,280
2. Cabot Oil & Gas Corporation. Withdrawal ID: Susquehanna River-3
(Docket No. 20080905), Great Bend Borough, Susquehanna County, Pa.--
$5,000
3. Seneca Resources Corporation. Pad ID: M. Pino H (ABR-20090933),
DCNR 100 1V (ABR-20090436), Wilcox F (ABR-20090505), T. Wivell (ABR-
20090814), Wivell I (ABR-20100607), DCNR 595 E (ABR-20100307), DCNR 595
D (ABR-20090827); Withdrawal ID: Arnot 5--Signor (Docket No.
20090908).--$35,000
Public Hearing--Projects Approved
1. Project Sponsor and Facility: Anadarko E&P Company LP (Beech
Creek), Snow Shoe Township, Centre County, Pa. Surface water withdrawal
of up to 0.249 mgd.
2. Project Sponsor and Facility: Anadarko E&P Company LP (Pine
Creek--2), McHenry Township, Lycoming County, Pa. Surface water
withdrawal of up to 0.499 mgd.
3. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility:
Monroe Manor Water System, Monroe Township, Snyder County, Pa.
Groundwater withdrawal of up to 0.180 mgd from Well 4.
4. Project Sponsor and Facility: Buck Ridge Stone, LLC (Salt Lick
Creek), New Milford Township, Susquehanna County, Pa. Surface water
withdrawal of up to 0.083 mgd.
5. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River), Mehoopany Township, Wyoming County, Pa.
Modification to project features of the withdrawal approval (Docket No.
20080923).
[[Page 63255]]
6. Project Sponsor and Facility: Citrus Energy (Susquehanna River),
Washington Township, Wyoming County, Pa. Surface water withdrawal of up
to 1.994 mgd.
7. Project Sponsor and Facility: Geary Enterprises (Buttermilk
Creek), Falls Township, Wyoming County, Pa. Surface water withdrawal of
up to 0.099 mgd.
8. Project Sponsor: New Morgan Landfill Company, Inc. Project
Facility: Conestoga Landfill, New Morgan Borough, Berks County, Pa.
Groundwater withdrawal of up to 0.003 mgd from the Shop Well and
surface water withdrawal of up to 0.249 mgd from the Quarry Pond.
9. Project Sponsor and Facility: Novus Operating, LLC (Cowanesque
River), Westfield Township, Tioga County, Pa. Surface water withdrawal
of up to 0.750 mgd.
10. Project Sponsor and Facility: Smith Transport Warehouse (Bald
Eagle Creek), Snyder Township, Blair County, Pa. Surface water
withdrawal of up to 0.160 mgd.
11. Project Sponsor and Facility: Sugar Hollow Trout Park and
Hatchery, Eaton Township, Wyoming County, Pa. Groundwater withdrawal of
up to 0.864 mgd combined total from Wells 1, 2, and 3 (Hatchery Well
Field).
12. Project Sponsor and Facility: Talisman Energy USA Inc. (Seeley
Creek), Wells Township, Bradford County, Pa. Surface water withdrawal
of up to 0.750 mgd.
13. Project Sponsor and Facility: Talisman Energy USA Inc.
(Wyalusing Creek), Stevens Township, Bradford County, Pa. Surface water
withdrawal of up to 2.000 mgd.
14. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Snake Creek), Liberty Township, Susquehanna County, Pa.
Modification to project features of the withdrawal approval (Docket No.
20090302).
Public Hearing--Projects Tabled
1. Project Sponsor and Facility: Anadarko E&P Company LP (Wolf
Run), Snow Shoe Township, Centre County, Pa. Application for surface
water withdrawal of up to 0.499 mgd.
2. Project Sponsor and Facility: Chief Oil & Gas LLC (Martins
Creek), Hop Bottom Borough, Susquehanna County, Pa. Application for
surface water withdrawal of up to 0.360 mgd.
3. Project Sponsor and Facility: Mansfield Borough Municipal
Authority, Richmond Township, Tioga County, Pa. Application for
groundwater withdrawal of up to 0.079 mgd from Well 3.
4. Project Sponsor and Facility: Novus Operating, LLC (Tioga
River), Covington Township, Tioga County, Pa. Application for surface
water withdrawal of up to 1.750 mgd.
5. Project Sponsor and Facility: Walker Township Water Association,
Walker Township, Centre County, Pa. Modification to increase the total
groundwater system withdrawal limit (30-day average) from 0.523 mgd to
0.962 mgd (Docket No. 20070905).
Public Hearing--Diversion Project Approved
1. Project Sponsor: Gettysburg Municipal Authority. Project
Facility: Hunterstown Wastewater Treatment Plant, Straban Township,
Adams County, Pa. Application for an existing into-basin diversion of
up to 0.123 mgd from the Potomac River Basin.
Public Hearing--Rescission of Project Approvals
1. Project Sponsor: McNeil PPC. Project Facility: Johnson & Johnson
(Docket No. 20050906), Lititz Borough, Lancaster County, Pa.
2. Project Sponsor: Northampton Fuel Supply Company, Inc. Project
Facility: Loomis Bank Operation (Docket No. 20040904), Hanover
Township, Luzerne County, Pa.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: September 30, 2010.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2010-25792 Filed 10-13-10; 8:45 am]
BILLING CODE 7040-01-P