Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 62518-62519 [2010-25517]
Download as PDF
srobinson on DSKHWCL6B1PROD with NOTICES
62518
Federal Register / Vol. 75, No. 196 / Tuesday, October 12, 2010 / Notices
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit a competing development
application. A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST,’’
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading, the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
VerDate Mar<15>2010
17:43 Oct 08, 2010
Jkt 223001
r. Waiver of Pre-filing Consultation: In
a letter dated April 1, 2010, the
applicant requested the agencies’
support to waive the Commission’s
consultation requirements under 18 CFR
4.38(c). On June 4, 2010, the U.S. Fish
and Wildlife Service (FWS)
recommended that a habitat assessment
be completed to assess the potential for
federally listed species to occur within
the project area. In response, the
applicant provided a report stating that
the proposed construction will have no
impact to federally listed species. No
other comments were received.
Therefore, we intend to accept the
consultation that has occurred on this
project during the pre-filing period and
we intend to waive pre-filing
consultation under section 4.38(c),
which requires, among other things,
conducting studies requested by
resource agencies, and distributing and
consulting on a draft exemption
application.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–25511 Filed 10–8–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12717–002]
Northern Illinois Hydropower, LLC;
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
October 4, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original major
license.
b. Project No.: 12717–002.
c. Date filed: May 27, 2009.
d. Applicant: Northern Illinois
Hydropower, LLC.
e. Name of Project: Brandon Road
Hydroelectric Project.
f. Location: U.S. Army Corps of
Engineers’ Brandon Road Lock and Dam
on the Des Plaines River, near the City
of Joliet, Will County, Illinois. The
project would occupy about 1.6 acres of
federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Damon
Zdunich, Northern Illinois Hydropower,
LLC, 801 Oakland Avenue, Joliet, IL
60435, (312) 320–1610.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
i. FERC Contact: Janet Hutzel, (202)
502–8675 or janet.hutzel@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice: Reply
comments are due 105 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. Project Description: The Brandon
Road Hydroelectric Project would
utilize the Corps of Engineer’s existing
Brandon Road Lock and Dam and would
consist of: (1) A new 90-foot by 118-foot
concrete powerhouse, located between
headgate sections 1 through 4,
containing two generating units with a
total installed capacity of 10.2
megawatts; (2) a new 50-foot by 50-foot
switchyard adjacent to the west side of
the proposed powerhouse; (3) a new 1mile-long, 34.5-kilovolt transmission
line; and (4) appurtenant facilities. The
project would have an average annual
generation of about 59,000 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
E:\FR\FM\12OCN1.SGM
12OCN1
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 75, No. 196 / Tuesday, October 12, 2010 / Notices
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) Bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–25517 Filed 10–8–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:43 Oct 08, 2010
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR10–130–000; PR10–131–000;
PR10–132–000; PR10–133–000; PR10–134–
000; PR10–135–000; PR10–136–000 (Not
Consolidated)]
Rocky Mountain Natural Gas LLC;
KeySpan Gas East Corporation; ECOP
Gas Company, LLC; MGTC, Inc; HillLake Gas Storage, LLC; Southern
California Gas Company; ETC Katy
Pipeline, Ltd.; Notice of Baseline
Filings
October 4, 2010.
Take notice that on September 30,
2010, and October 1, 2010, respectively
the applicants listed above submitted
their baseline filing of its Statement of
Operating Conditions for services
provided under section 311 of the
Natural Gas Policy Act of 1978 (NGPA).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
62519
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Friday, October 15, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–25519 Filed 10–8–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR10–123–000; PR10–124–000;
PR10–125–000; PR10–126–000;. PR10–127–
000; PR10–128–000; PR10–129–000 (Not
Consolidated)]
Northern Illinois Gas Company; Lee 8
Storage Partnership; NorthWestern
Corporation; The East Ohio Gas
Company; UGI Central Penn Gas, Inc.;
Arkansas Western Gas Company;
Boston Gas Company; Notice of
Baseline Filings
October 4, 2010.
Take notice that on September 29,
2010, and September 30, 2010,
respectively the applicants listed above
submitted their baseline filing of its
Statement of Operating Conditions for
services provided under section 311 of
the Natural Gas Policy Act of 1978
(NGPA).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
E:\FR\FM\12OCN1.SGM
12OCN1
Agencies
[Federal Register Volume 75, Number 196 (Tuesday, October 12, 2010)]
[Notices]
[Pages 62518-62519]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25517]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12717-002]
Northern Illinois Hydropower, LLC; Notice of Application Ready
for Environmental Analysis and Soliciting Comments, Recommendations,
Terms and Conditions, and Prescriptions
October 4, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original major license.
b. Project No.: 12717-002.
c. Date filed: May 27, 2009.
d. Applicant: Northern Illinois Hydropower, LLC.
e. Name of Project: Brandon Road Hydroelectric Project.
f. Location: U.S. Army Corps of Engineers' Brandon Road Lock and
Dam on the Des Plaines River, near the City of Joliet, Will County,
Illinois. The project would occupy about 1.6 acres of federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Damon Zdunich, Northern Illinois Hydropower,
LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610.
i. FERC Contact: Janet Hutzel, (202) 502-8675 or
janet.hutzel@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions is 60 days from the issuance of this
notice: Reply comments are due 105 days from the issuance date of this
notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
l. Project Description: The Brandon Road Hydroelectric Project
would utilize the Corps of Engineer's existing Brandon Road Lock and
Dam and would consist of: (1) A new 90-foot by 118-foot concrete
powerhouse, located between headgate sections 1 through 4, containing
two generating units with a total installed capacity of 10.2 megawatts;
(2) a new 50-foot by 50-foot switchyard adjacent to the west side of
the proposed powerhouse; (3) a new 1-mile-long, 34.5-kilovolt
transmission line; and (4) appurtenant facilities. The project would
have an average annual generation of about 59,000 megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document.
[[Page 62519]]
For assistance, contact FERC Online Support. A copy is also available
for inspection and reproduction at the address in item h above.
All filings must (1) Bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-25517 Filed 10-8-10; 8:45 am]
BILLING CODE 6717-01-P