Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 62516-62517 [2010-25516]

Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES 62516 Federal Register / Vol. 75, No. 196 / Tuesday, October 12, 2010 / Notices There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests VerDate Mar<15>2010 17:43 Oct 08, 2010 Jkt 223001 and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: October 25, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–25513 Filed 10–8–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12626–002] Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions October 4, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original major license. b. Project No.: 12626–002. c. Date filed: March 31, 2009. d. Applicant: Northern Illinois Hydropower, LLC. e. Name of Project: Dresden Island Project. f. Location: U.S. Army Corps of Engineers’ Dresden Island Lock and Dam on the Illinois River, in the Town of Morris, Grundy County, Illinois. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Damon Zdunich, Northern Illinois Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320–1610. i. FERC Contact: Janet Hutzel, (202) 502–8675 or janet.hutzel@ferc.gov. j. Deadline for filing comments, recommendations, terms and PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 conditions, and prescriptions is 60 days from the issuance of this notice: Reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. Project Description: The Dresden Island Project would utilize the Corps of Engineers’ existing Dresden Island Lock and Dam and would consist of: (1) A new 75-foot by 125-foot concrete powerhouse, located between headgate sections 10 through 16, containing three generating units with a total installed capacity of 10.2 MW; (2) a new 50-foot by 50-foot switchyard adjacent to powerhouse building; (3) a new 0.8mile-long transmission line; and (4) appurtenant facilities. The project would have an average annual generation of about 60,000 megawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. E:\FR\FM\12OCN1.SGM 12OCN1 Federal Register / Vol. 75, No. 196 / Tuesday, October 12, 2010 / Notices All filings must (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. srobinson on DSKHWCL6B1PROD with NOTICES Kimberly D. Bose, Secretary. [FR Doc. 2010–25516 Filed 10–8–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 17:43 Oct 08, 2010 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13802–000] California Water Service Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions October 1, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit exemption. b. Project No.: 13802–000. c. Date filed: June 29, 2010. d. Applicant: California Water Service Company. e. Name of Project: Palos Verdes Energy Recovery Project. f. Location: The proposed Palos Verdes Energy Recovery Project would be located at 5837 Crest Road West, City of Rancho Palos Verdes in Los Angeles County, California. The land on which all the project structures are located is owned by the applicant. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Erin McCauley, P.E., Manager of Design, California Water Service Company, 1720 North First Street, San Jose, CA 95112–4598, Telephone (408) 367–8279. i. FERC Contact: Jake Tung, telephone (202) 502–8757, and e-mail address hong.tung@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size and location of the proposed project in a closed system, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments filed in response to comments submitted by any resource agency, Indian tribe, or person, must be filed with the Commission within 45 days from the issuance date of this notice. Comments, protests, and interventions may be filed electronically PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 62517 via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii). Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. The Commission strongly encourages electronic filings. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Project: The proposed Palos Verdes Energy Recovery Project would consist of: (1) A proposed concrete pad located above the existing vault with no physical changes to the existing cement infrastructure; (2) one reverse-pump turbine generator unit with a rated capacity of 325 kW; (3) the turbine generator unit to be installed within the pipeline using custom piping, T-flanges and electronic valves; and (4) appurtenant facilities. The project construction is tentatively scheduled to begin in December 2010 and to be commissioned in January 2011. The project would produce an estimated annual generation of 2,000,000 kilowatt-hours that would be sold to Southern California Edison. m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street, NE., Washington, DC 20426. The filing may also be viewed on the Web at https://www.ferc.gov/docsfiling/efiling.asp. Enter the docket number (P–13802) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676. For TTY, call (202) 502–8659. A copy is also available for review and reproduction at the address in item h above. n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. E:\FR\FM\12OCN1.SGM 12OCN1

Agencies

[Federal Register Volume 75, Number 196 (Tuesday, October 12, 2010)]
[Notices]
[Pages 62516-62517]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25516]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12626-002]


Northern Illinois Hydropower, LLC; Notice of Application Ready 
for Environmental Analysis and Soliciting Comments, Recommendations, 
Terms and Conditions, and Prescriptions

October 4, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original major license.
    b. Project No.: 12626-002.
    c. Date filed: March 31, 2009.
    d. Applicant: Northern Illinois Hydropower, LLC.
    e. Name of Project: Dresden Island Project.
    f. Location: U.S. Army Corps of Engineers' Dresden Island Lock and 
Dam on the Illinois River, in the Town of Morris, Grundy County, 
Illinois.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Damon Zdunich, Northern Illinois Hydropower, 
LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610.
    i. FERC Contact: Janet Hutzel, (202) 502-8675 or 
janet.hutzel@ferc.gov.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions is 60 days from the issuance of this 
notice: Reply comments are due 105 days from the issuance date of this 
notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. Project Description: The Dresden Island Project would utilize 
the Corps of Engineers' existing Dresden Island Lock and Dam and would 
consist of: (1) A new 75-foot by 125-foot concrete powerhouse, located 
between headgate sections 10 through 16, containing three generating 
units with a total installed capacity of 10.2 MW; (2) a new 50-foot by 
50-foot switchyard adjacent to powerhouse building; (3) a new 0.8-mile-
long transmission line; and (4) appurtenant facilities. The project 
would have an average annual generation of about 60,000 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.

[[Page 62517]]

    All filings must (1) Bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-25516 Filed 10-8-10; 8:45 am]