California Water Service Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 62517-62518 [2010-25511]

Download as PDF Federal Register / Vol. 75, No. 196 / Tuesday, October 12, 2010 / Notices All filings must (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. srobinson on DSKHWCL6B1PROD with NOTICES Kimberly D. Bose, Secretary. [FR Doc. 2010–25516 Filed 10–8–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 17:43 Oct 08, 2010 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13802–000] California Water Service Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions October 1, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit exemption. b. Project No.: 13802–000. c. Date filed: June 29, 2010. d. Applicant: California Water Service Company. e. Name of Project: Palos Verdes Energy Recovery Project. f. Location: The proposed Palos Verdes Energy Recovery Project would be located at 5837 Crest Road West, City of Rancho Palos Verdes in Los Angeles County, California. The land on which all the project structures are located is owned by the applicant. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Erin McCauley, P.E., Manager of Design, California Water Service Company, 1720 North First Street, San Jose, CA 95112–4598, Telephone (408) 367–8279. i. FERC Contact: Jake Tung, telephone (202) 502–8757, and e-mail address hong.tung@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size and location of the proposed project in a closed system, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments filed in response to comments submitted by any resource agency, Indian tribe, or person, must be filed with the Commission within 45 days from the issuance date of this notice. Comments, protests, and interventions may be filed electronically PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 62517 via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii). Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. The Commission strongly encourages electronic filings. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Project: The proposed Palos Verdes Energy Recovery Project would consist of: (1) A proposed concrete pad located above the existing vault with no physical changes to the existing cement infrastructure; (2) one reverse-pump turbine generator unit with a rated capacity of 325 kW; (3) the turbine generator unit to be installed within the pipeline using custom piping, T-flanges and electronic valves; and (4) appurtenant facilities. The project construction is tentatively scheduled to begin in December 2010 and to be commissioned in January 2011. The project would produce an estimated annual generation of 2,000,000 kilowatt-hours that would be sold to Southern California Edison. m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street, NE., Washington, DC 20426. The filing may also be viewed on the Web at https://www.ferc.gov/docsfiling/efiling.asp. Enter the docket number (P–13802) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676. For TTY, call (202) 502–8659. A copy is also available for review and reproduction at the address in item h above. n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. E:\FR\FM\12OCN1.SGM 12OCN1 srobinson on DSKHWCL6B1PROD with NOTICES 62518 Federal Register / Vol. 75, No. 196 / Tuesday, October 12, 2010 / Notices o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a competing development application. A notice of intent must be served on the applicant(s) named in this public notice. p. Protests or Motions to Intervene— Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. q. All filings must (1) bear in all capital letters the title ‘‘PROTEST,’’ ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading, the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and seven copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. VerDate Mar<15>2010 17:43 Oct 08, 2010 Jkt 223001 r. Waiver of Pre-filing Consultation: In a letter dated April 1, 2010, the applicant requested the agencies’ support to waive the Commission’s consultation requirements under 18 CFR 4.38(c). On June 4, 2010, the U.S. Fish and Wildlife Service (FWS) recommended that a habitat assessment be completed to assess the potential for federally listed species to occur within the project area. In response, the applicant provided a report stating that the proposed construction will have no impact to federally listed species. No other comments were received. Therefore, we intend to accept the consultation that has occurred on this project during the pre-filing period and we intend to waive pre-filing consultation under section 4.38(c), which requires, among other things, conducting studies requested by resource agencies, and distributing and consulting on a draft exemption application. Kimberly D. Bose, Secretary. [FR Doc. 2010–25511 Filed 10–8–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12717–002] Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions October 4, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original major license. b. Project No.: 12717–002. c. Date filed: May 27, 2009. d. Applicant: Northern Illinois Hydropower, LLC. e. Name of Project: Brandon Road Hydroelectric Project. f. Location: U.S. Army Corps of Engineers’ Brandon Road Lock and Dam on the Des Plaines River, near the City of Joliet, Will County, Illinois. The project would occupy about 1.6 acres of federal land. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Damon Zdunich, Northern Illinois Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320–1610. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 i. FERC Contact: Janet Hutzel, (202) 502–8675 or janet.hutzel@ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice: Reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is now ready for environmental analysis. l. Project Description: The Brandon Road Hydroelectric Project would utilize the Corps of Engineer’s existing Brandon Road Lock and Dam and would consist of: (1) A new 90-foot by 118-foot concrete powerhouse, located between headgate sections 1 through 4, containing two generating units with a total installed capacity of 10.2 megawatts; (2) a new 50-foot by 50-foot switchyard adjacent to the west side of the proposed powerhouse; (3) a new 1mile-long, 34.5-kilovolt transmission line; and (4) appurtenant facilities. The project would have an average annual generation of about 59,000 megawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. E:\FR\FM\12OCN1.SGM 12OCN1

Agencies

[Federal Register Volume 75, Number 196 (Tuesday, October 12, 2010)]
[Notices]
[Pages 62517-62518]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25511]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13802-000]


California Water Service Company; Notice of Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, Protests, 
Recommendations, and Terms and Conditions

October 1, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Conduit exemption.
    b. Project No.: 13802-000.
    c. Date filed: June 29, 2010.
    d. Applicant: California Water Service Company.
    e. Name of Project: Palos Verdes Energy Recovery Project.
    f. Location: The proposed Palos Verdes Energy Recovery Project 
would be located at 5837 Crest Road West, City of Rancho Palos Verdes 
in Los Angeles County, California. The land on which all the project 
structures are located is owned by the applicant.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Erin McCauley, P.E., Manager of Design, 
California Water Service Company, 1720 North First Street, San Jose, CA 
95112-4598, Telephone (408) 367-8279.
    i. FERC Contact: Jake Tung, telephone (202) 502-8757, and e-mail 
address hong.tung@ferc.gov.
    j. Status of Environmental Analysis: This application is ready for 
environmental analysis at this time, and the Commission is requesting 
comments, reply comments, recommendations, terms and conditions, and 
prescriptions.
    k. Deadline for filing responsive documents: Due to the small size 
and location of the proposed project in a closed system, as well as the 
resource agency consultation letters filed with the application, the 
60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, 
motions to intervene, protests, recommendations, terms and conditions, 
and prescriptions is shortened to 30 days from the issuance date of 
this notice. All reply comments filed in response to comments submitted 
by any resource agency, Indian tribe, or person, must be filed with the 
Commission within 45 days from the issuance date of this notice.
    Comments, protests, and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii). 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. The Commission strongly encourages electronic 
filings.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    l. Description of Project: The proposed Palos Verdes Energy 
Recovery Project would consist of: (1) A proposed concrete pad located 
above the existing vault with no physical changes to the existing 
cement infrastructure; (2) one reverse-pump turbine generator unit with 
a rated capacity of 325 kW; (3) the turbine generator unit to be 
installed within the pipeline using custom piping, T-flanges and 
electronic valves; and (4) appurtenant facilities. The project 
construction is tentatively scheduled to begin in December 2010 and to 
be commissioned in January 2011. The project would produce an estimated 
annual generation of 2,000,000 kilowatt-hours that would be sold to 
Southern California Edison.
    m. This filing is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street, 
NE., Washington, DC 20426. The filing may also be viewed on the Web at 
https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number 
(P-13802) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676. For TTY, call (202) 502-
8659. A copy is also available for review and reproduction at the 
address in item h above.
    n. Development Application--Any qualified applicant desiring to 
file a competing application must submit to the Commission, on or 
before the specified deadline date for the particular application, a 
competing development application, or a notice of intent to file such 
an application. Submission of a timely notice of intent allows an 
interested person to file the competing development application no 
later than 120 days after the specified deadline date for the 
particular application. Applications for preliminary permits will not 
be accepted in response to this notice.

[[Page 62518]]

    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit a competing development application. A notice of intent must be 
served on the applicant(s) named in this public notice.
    p. Protests or Motions to Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    q. All filings must (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS;'' (2) set forth in the heading, the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. Any of these documents must be filed by providing 
the original and seven copies to: The Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An 
additional copy must be sent to Director, Division of Hydropower 
Administration and Compliance, Office of Energy Projects, Federal 
Energy Regulatory Commission, at the above address. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application. A copy of all 
other filings in reference to this application must be accompanied by 
proof of service on all persons listed in the service list prepared by 
the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.
    r. Waiver of Pre-filing Consultation: In a letter dated April 1, 
2010, the applicant requested the agencies' support to waive the 
Commission's consultation requirements under 18 CFR 4.38(c). On June 4, 
2010, the U.S. Fish and Wildlife Service (FWS) recommended that a 
habitat assessment be completed to assess the potential for federally 
listed species to occur within the project area. In response, the 
applicant provided a report stating that the proposed construction will 
have no impact to federally listed species. No other comments were 
received. Therefore, we intend to accept the consultation that has 
occurred on this project during the pre-filing period and we intend to 
waive pre-filing consultation under section 4.38(c), which requires, 
among other things, conducting studies requested by resource agencies, 
and distributing and consulting on a draft exemption application.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-25511 Filed 10-8-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.