Environmental Impacts Statements; Notice of Availability, 62386 [2010-25470]

Download as PDF 62386 Federal Register / Vol. 75, No. 195 / Friday, October 8, 2010 / Notices rates, which resulted in an increase in labor cost. Dated: October 4, 2010. John Moses, Director, Collection Strategies Division. [FR Doc. 2010–25428 Filed 10–7–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8993–1] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 09/27/2010 through 10/01/2010. Pursuant to 40 CFR 1506.9. erowe on DSK5CLS3C1PROD with NOTICES Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100389, Final EIS, USFS, OR, D-Bug Hazard Reduction Timber Sales Project, To Lessen the Fuel and Safety Hazards Associated With the OnGoing Outbreak of Mountain Pine Beetles, Diamond Lake Ranger District, Umpqua National Forest, Douglas County, OR, Wait Period Ends: 11/08/2010, Contact: Joyce Thompson 541–957–3457. This document is available on the Internet at: https://www.fs.fed.us/r6/ umpqua/projects/projectdocs/d-bug-ts/ index.shtml. EIS No. 20100390, Draft EIS, NSF, 00, Programmatic—Marine Seismic Research Funded by the National Science Foundation or Conducted by the U.S. Geological Survey, To Fund VerDate Mar<15>2010 15:29 Oct 07, 2010 Jkt 223001 the Investigation of the Geology and Geophysics of the Seafloor by Collecting Seismic Reflection and Refraction Data, Across the World’s Ocean, Comment Period Ends: 11/22/ 2010, Contact: Holly Smith 703–292– 8593. This document is available on the Internet at https://www.nsf.gov/geo/oce/ envcomp/index.jsp. EIS No. 20100391, Final EIS, USACE, NC, Surf City and North Topsail Beach Project, To Evaluate Coastal Storm Damage Reduction, Topsail Island, Pender and Onslow Counties, NC, Wait Period Ends: 11/22/2010, Contact: Doug Piatkowski 910–251– 4908. EIS No. 20100392, Draft EIS, BR, CA, Nimbus Hatchery Fish Passage Project, To Create and Maintain a Reliable System for Collecting Adult Fish to Allow Reclamation, Rancho Cordova, Gold River, CA, Comment Period Ends: 11/30/2010, Contact: David Robinson 916–989–7179. EIS No. 20100393, Final EIS, DOE, WA, Cushman Hydroelectric Project (FERC No. 0456), Design and Construction of New 3.6–MW Powerhouse on the North Fork of the Skokomish River, Mason County, WA, Wait Period Ends: 11/08/2010, Contact: Jane Summerson 202–340–9626. EIS No. 20100394, Draft EIS, FHWA, NC, NC–109 Corridor Improvement Study, From Old Greensboro Road (NC–1798) to I–40/US 311, Davidson and Forsyth Counties, NC, Comment Period Ends: 11/22/2010, Contact: Vince Rhea 919–733–7844. EIS No. 20100395, Final EIS, USACE, LA, Convey Atchafalaya River Water to Northern Terrebonne Marshes and Multipurpose Operation of Houma Navigation Lock, Integrated Feasibility Study, Louisiana Coastal Area (LCA) Implementation, Lafourche, Terrebonne, St. Mary Parish, LA, Wait Period Ends: 11/08/ 2010, Contact: Dr. Nathan Dayan 504– 862–2530. EIS No. 20100396, Final EIS, USACE, LA, Louisiana Coastal Area (LCA)— Louisiana, Terrebonne Basin Barrier Shoreline Restoration, Feasibility Study, Implementation. Terrebonne Parish, LA, Wait Period Ends: 11/08/ 2010, Contact: Dr. William P. Klein, Jr. 504–862–2540. EIS No. 20100397, Final EIS, USACE, LA, Small Diversion at Convent/Blind River, Proposes to construct a Freshwater Diversion Project, Integrated Feasibility Study, Louisiana Coastal Area, St. James Parish, LA, Wait Period Ends: 11/08/ 2010, Contact: Dr. William P. Klein, Jr. 504–862–2540. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 EIS No. 20100398, Final EIS, USACE, LA, Medium Diversion at White Ditch, Integrated Feasibility Study, Louisiana Coastal Area (LCA) Ecosystem Restoration, Implementation, Plaquemines Parish, LA, Wait Period Ends: 11/08/2010, Contact: Dr. Nathan Dayan 504–862– 2530. EIS No. 20100399, Final EIS, USACE, LA, Amite River Diversion Canal Modification Element of the Section 7006(E)(3) Ecosystem Restoration Project, Feasibility Study, Louisiana Coastal Area (LCA) Ascension and Livingston Parishes, LA, Wait Period Ends: 11/08/2010, Contact: Dr. William P. Klein, Jr. 504–862–2540. Amended Notices EIS No. 20100370, Final EIS, FHWA, WY, Jackson South Project, US/26/89/ 189/91 Improvements, Funding and Right-of-Way Approval, Teton County, WY, Wait Period Ends: 11/ 17/2010, Contact: Lee Potter 307–771– 2946. Revision to FR Notice Published 09/ 17/2010: Extending Comment Period from 10/18/2010 to 11/17/2010. Dated: October 5, 2010. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–25470 Filed 10–7–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9212–5] Science Advisory Board Staff Office; Notification of Two Public Teleconferences of the Science Advisory Board Ecological Processes and Effects Committee Augmented for Ballast Water Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The EPA Science Advisory Board (SAB) Staff Office announces two public teleconferences of the Science Advisory Board Ecological Processes and Effects Committee, augmented, to discuss its advice on the effectiveness of shipboard ballast water treatment processes and ways to improve future assessments of ballast water treatment systems to minimize the impacts of invasive species in vessel ballast water discharge. DATES: The teleconference dates are October 26, 2010, from 2 p.m. to 6 p.m. SUMMARY: E:\FR\FM\08OCN1.SGM 08OCN1

Agencies

[Federal Register Volume 75, Number 195 (Friday, October 8, 2010)]
[Notices]
[Page 62386]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25470]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8993-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements

Filed 09/27/2010 through 10/01/2010.
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100389, Final EIS, USFS, OR, D-Bug Hazard Reduction Timber 
Sales Project, To Lessen the Fuel and Safety Hazards Associated With 
the On-Going Outbreak of Mountain Pine Beetles, Diamond Lake Ranger 
District, Umpqua National Forest, Douglas County, OR, Wait Period Ends: 
11/08/2010, Contact: Joyce Thompson 541-957-3457.

    This document is available on the Internet at: https://www.fs.fed.us/r6/umpqua/projects/projectdocs/d-bug-ts/index.shtml.

EIS No. 20100390, Draft EIS, NSF, 00, Programmatic--Marine Seismic 
Research Funded by the National Science Foundation or Conducted by the 
U.S. Geological Survey, To Fund the Investigation of the Geology and 
Geophysics of the Seafloor by Collecting Seismic Reflection and 
Refraction Data, Across the World's Ocean, Comment Period Ends: 11/22/
2010, Contact: Holly Smith 703-292-8593.

    This document is available on the Internet at https://www.nsf.gov/geo/oce/envcomp/index.jsp.

EIS No. 20100391, Final EIS, USACE, NC, Surf City and North Topsail 
Beach Project, To Evaluate Coastal Storm Damage Reduction, Topsail 
Island, Pender and Onslow Counties, NC, Wait Period Ends: 11/22/2010, 
Contact: Doug Piatkowski 910-251-4908.
EIS No. 20100392, Draft EIS, BR, CA, Nimbus Hatchery Fish Passage 
Project, To Create and Maintain a Reliable System for Collecting Adult 
Fish to Allow Reclamation, Rancho Cordova, Gold River, CA, Comment 
Period Ends: 11/30/2010, Contact: David Robinson 916-989-7179.
EIS No. 20100393, Final EIS, DOE, WA, Cushman Hydroelectric Project 
(FERC No. 0456), Design and Construction of New 3.6-MW Powerhouse on 
the North Fork of the Skokomish River, Mason County, WA, Wait Period 
Ends: 11/08/2010, Contact: Jane Summerson 202-340-9626.
EIS No. 20100394, Draft EIS, FHWA, NC, NC-109 Corridor Improvement 
Study, From Old Greensboro Road (NC-1798) to I-40/US 311, Davidson and 
Forsyth Counties, NC, Comment Period Ends: 11/22/2010, Contact: Vince 
Rhea 919-733-7844.
EIS No. 20100395, Final EIS, USACE, LA, Convey Atchafalaya River Water 
to Northern Terrebonne Marshes and Multipurpose Operation of Houma 
Navigation Lock, Integrated Feasibility Study, Louisiana Coastal Area 
(LCA) Implementation, Lafourche, Terrebonne, St. Mary Parish, LA, Wait 
Period Ends: 11/08/2010, Contact: Dr. Nathan Dayan 504-862-2530.
EIS No. 20100396, Final EIS, USACE, LA, Louisiana Coastal Area (LCA)--
Louisiana, Terrebonne Basin Barrier Shoreline Restoration, Feasibility 
Study, Implementation. Terrebonne Parish, LA, Wait Period Ends: 11/08/
2010, Contact: Dr. William P. Klein, Jr. 504-862-2540.
EIS No. 20100397, Final EIS, USACE, LA, Small Diversion at Convent/
Blind River, Proposes to construct a Freshwater Diversion Project, 
Integrated Feasibility Study, Louisiana Coastal Area, St. James Parish, 
LA, Wait Period Ends: 11/08/2010, Contact: Dr. William P. Klein, Jr. 
504-862-2540.
EIS No. 20100398, Final EIS, USACE, LA, Medium Diversion at White 
Ditch, Integrated Feasibility Study, Louisiana Coastal Area (LCA) 
Ecosystem Restoration, Implementation, Plaquemines Parish, LA, Wait 
Period Ends: 11/08/2010, Contact: Dr. Nathan Dayan 504-862-2530.
EIS No. 20100399, Final EIS, USACE, LA, Amite River Diversion Canal 
Modification Element of the Section 7006(E)(3) Ecosystem Restoration 
Project, Feasibility Study, Louisiana Coastal Area (LCA) Ascension and 
Livingston Parishes, LA, Wait Period Ends: 11/08/2010, Contact: Dr. 
William P. Klein, Jr. 504-862-2540.

Amended Notices

EIS No. 20100370, Final EIS, FHWA, WY, Jackson South Project, US/26/89/
189/91 Improvements, Funding and Right-of-Way Approval, Teton County, 
WY, Wait Period Ends: 11/17/2010, Contact: Lee Potter 307-771-2946.

    Revision to FR Notice Published 09/17/2010: Extending Comment 
Period from 10/18/2010 to 11/17/2010.

    Dated: October 5, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-25470 Filed 10-7-10; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.