Environmental Impacts Statements; Notice of Availability, 62386 [2010-25470]
Download as PDF
62386
Federal Register / Vol. 75, No. 195 / Friday, October 8, 2010 / Notices
rates, which resulted in an increase in
labor cost.
Dated: October 4, 2010.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2010–25428 Filed 10–7–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8993–1]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/27/2010 through 10/01/2010.
Pursuant to 40 CFR 1506.9.
erowe on DSK5CLS3C1PROD with NOTICES
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100389, Final EIS, USFS, OR,
D-Bug Hazard Reduction Timber Sales
Project, To Lessen the Fuel and Safety
Hazards Associated With the OnGoing Outbreak of Mountain Pine
Beetles, Diamond Lake Ranger
District, Umpqua National Forest,
Douglas County, OR, Wait Period
Ends: 11/08/2010, Contact: Joyce
Thompson 541–957–3457.
This document is available on the
Internet at: https://www.fs.fed.us/r6/
umpqua/projects/projectdocs/d-bug-ts/
index.shtml.
EIS No. 20100390, Draft EIS, NSF, 00,
Programmatic—Marine Seismic
Research Funded by the National
Science Foundation or Conducted by
the U.S. Geological Survey, To Fund
VerDate Mar<15>2010
15:29 Oct 07, 2010
Jkt 223001
the Investigation of the Geology and
Geophysics of the Seafloor by
Collecting Seismic Reflection and
Refraction Data, Across the World’s
Ocean, Comment Period Ends: 11/22/
2010, Contact: Holly Smith 703–292–
8593.
This document is available on the
Internet at https://www.nsf.gov/geo/oce/
envcomp/index.jsp.
EIS No. 20100391, Final EIS, USACE,
NC, Surf City and North Topsail
Beach Project, To Evaluate Coastal
Storm Damage Reduction, Topsail
Island, Pender and Onslow Counties,
NC, Wait Period Ends: 11/22/2010,
Contact: Doug Piatkowski 910–251–
4908.
EIS No. 20100392, Draft EIS, BR, CA,
Nimbus Hatchery Fish Passage
Project, To Create and Maintain a
Reliable System for Collecting Adult
Fish to Allow Reclamation, Rancho
Cordova, Gold River, CA, Comment
Period Ends: 11/30/2010, Contact:
David Robinson 916–989–7179.
EIS No. 20100393, Final EIS, DOE, WA,
Cushman Hydroelectric Project (FERC
No. 0456), Design and Construction of
New 3.6–MW Powerhouse on the
North Fork of the Skokomish River,
Mason County, WA, Wait Period
Ends: 11/08/2010, Contact: Jane
Summerson 202–340–9626.
EIS No. 20100394, Draft EIS, FHWA,
NC, NC–109 Corridor Improvement
Study, From Old Greensboro Road
(NC–1798) to I–40/US 311, Davidson
and Forsyth Counties, NC, Comment
Period Ends: 11/22/2010, Contact:
Vince Rhea 919–733–7844.
EIS No. 20100395, Final EIS, USACE,
LA, Convey Atchafalaya River Water
to Northern Terrebonne Marshes and
Multipurpose Operation of Houma
Navigation Lock, Integrated
Feasibility Study, Louisiana Coastal
Area (LCA) Implementation,
Lafourche, Terrebonne, St. Mary
Parish, LA, Wait Period Ends: 11/08/
2010, Contact: Dr. Nathan Dayan 504–
862–2530.
EIS No. 20100396, Final EIS, USACE,
LA, Louisiana Coastal Area (LCA)—
Louisiana, Terrebonne Basin Barrier
Shoreline Restoration, Feasibility
Study, Implementation. Terrebonne
Parish, LA, Wait Period Ends: 11/08/
2010, Contact: Dr. William P. Klein,
Jr. 504–862–2540.
EIS No. 20100397, Final EIS, USACE,
LA, Small Diversion at Convent/Blind
River, Proposes to construct a
Freshwater Diversion Project,
Integrated Feasibility Study,
Louisiana Coastal Area, St. James
Parish, LA, Wait Period Ends: 11/08/
2010, Contact: Dr. William P. Klein,
Jr. 504–862–2540.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
EIS No. 20100398, Final EIS, USACE,
LA, Medium Diversion at White
Ditch, Integrated Feasibility Study,
Louisiana Coastal Area (LCA)
Ecosystem Restoration,
Implementation, Plaquemines Parish,
LA, Wait Period Ends: 11/08/2010,
Contact: Dr. Nathan Dayan 504–862–
2530.
EIS No. 20100399, Final EIS, USACE,
LA, Amite River Diversion Canal
Modification Element of the Section
7006(E)(3) Ecosystem Restoration
Project, Feasibility Study, Louisiana
Coastal Area (LCA) Ascension and
Livingston Parishes, LA, Wait Period
Ends: 11/08/2010, Contact: Dr.
William P. Klein, Jr. 504–862–2540.
Amended Notices
EIS No. 20100370, Final EIS, FHWA,
WY, Jackson South Project, US/26/89/
189/91 Improvements, Funding and
Right-of-Way Approval, Teton
County, WY, Wait Period Ends: 11/
17/2010, Contact: Lee Potter 307–771–
2946.
Revision to FR Notice Published 09/
17/2010: Extending Comment Period
from 10/18/2010 to 11/17/2010.
Dated: October 5, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–25470 Filed 10–7–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9212–5]
Science Advisory Board Staff Office;
Notification of Two Public
Teleconferences of the Science
Advisory Board Ecological Processes
and Effects Committee Augmented for
Ballast Water
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The EPA Science Advisory
Board (SAB) Staff Office announces two
public teleconferences of the Science
Advisory Board Ecological Processes
and Effects Committee, augmented, to
discuss its advice on the effectiveness of
shipboard ballast water treatment
processes and ways to improve future
assessments of ballast water treatment
systems to minimize the impacts of
invasive species in vessel ballast water
discharge.
DATES: The teleconference dates are
October 26, 2010, from 2 p.m. to 6 p.m.
SUMMARY:
E:\FR\FM\08OCN1.SGM
08OCN1
Agencies
[Federal Register Volume 75, Number 195 (Friday, October 8, 2010)]
[Notices]
[Page 62386]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-25470]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8993-1]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/27/2010 through 10/01/2010.
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA has met this mandate by publishing weekly
notices of availability of EPA comments, which includes a brief summary
of EPA's comment letters, in the Federal Register. Since February 2008,
EPA has been including its comment letters on EISs on its Web site at:
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire
EIS comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20100389, Final EIS, USFS, OR, D-Bug Hazard Reduction Timber
Sales Project, To Lessen the Fuel and Safety Hazards Associated With
the On-Going Outbreak of Mountain Pine Beetles, Diamond Lake Ranger
District, Umpqua National Forest, Douglas County, OR, Wait Period Ends:
11/08/2010, Contact: Joyce Thompson 541-957-3457.
This document is available on the Internet at: https://www.fs.fed.us/r6/umpqua/projects/projectdocs/d-bug-ts/index.shtml.
EIS No. 20100390, Draft EIS, NSF, 00, Programmatic--Marine Seismic
Research Funded by the National Science Foundation or Conducted by the
U.S. Geological Survey, To Fund the Investigation of the Geology and
Geophysics of the Seafloor by Collecting Seismic Reflection and
Refraction Data, Across the World's Ocean, Comment Period Ends: 11/22/
2010, Contact: Holly Smith 703-292-8593.
This document is available on the Internet at https://www.nsf.gov/geo/oce/envcomp/index.jsp.
EIS No. 20100391, Final EIS, USACE, NC, Surf City and North Topsail
Beach Project, To Evaluate Coastal Storm Damage Reduction, Topsail
Island, Pender and Onslow Counties, NC, Wait Period Ends: 11/22/2010,
Contact: Doug Piatkowski 910-251-4908.
EIS No. 20100392, Draft EIS, BR, CA, Nimbus Hatchery Fish Passage
Project, To Create and Maintain a Reliable System for Collecting Adult
Fish to Allow Reclamation, Rancho Cordova, Gold River, CA, Comment
Period Ends: 11/30/2010, Contact: David Robinson 916-989-7179.
EIS No. 20100393, Final EIS, DOE, WA, Cushman Hydroelectric Project
(FERC No. 0456), Design and Construction of New 3.6-MW Powerhouse on
the North Fork of the Skokomish River, Mason County, WA, Wait Period
Ends: 11/08/2010, Contact: Jane Summerson 202-340-9626.
EIS No. 20100394, Draft EIS, FHWA, NC, NC-109 Corridor Improvement
Study, From Old Greensboro Road (NC-1798) to I-40/US 311, Davidson and
Forsyth Counties, NC, Comment Period Ends: 11/22/2010, Contact: Vince
Rhea 919-733-7844.
EIS No. 20100395, Final EIS, USACE, LA, Convey Atchafalaya River Water
to Northern Terrebonne Marshes and Multipurpose Operation of Houma
Navigation Lock, Integrated Feasibility Study, Louisiana Coastal Area
(LCA) Implementation, Lafourche, Terrebonne, St. Mary Parish, LA, Wait
Period Ends: 11/08/2010, Contact: Dr. Nathan Dayan 504-862-2530.
EIS No. 20100396, Final EIS, USACE, LA, Louisiana Coastal Area (LCA)--
Louisiana, Terrebonne Basin Barrier Shoreline Restoration, Feasibility
Study, Implementation. Terrebonne Parish, LA, Wait Period Ends: 11/08/
2010, Contact: Dr. William P. Klein, Jr. 504-862-2540.
EIS No. 20100397, Final EIS, USACE, LA, Small Diversion at Convent/
Blind River, Proposes to construct a Freshwater Diversion Project,
Integrated Feasibility Study, Louisiana Coastal Area, St. James Parish,
LA, Wait Period Ends: 11/08/2010, Contact: Dr. William P. Klein, Jr.
504-862-2540.
EIS No. 20100398, Final EIS, USACE, LA, Medium Diversion at White
Ditch, Integrated Feasibility Study, Louisiana Coastal Area (LCA)
Ecosystem Restoration, Implementation, Plaquemines Parish, LA, Wait
Period Ends: 11/08/2010, Contact: Dr. Nathan Dayan 504-862-2530.
EIS No. 20100399, Final EIS, USACE, LA, Amite River Diversion Canal
Modification Element of the Section 7006(E)(3) Ecosystem Restoration
Project, Feasibility Study, Louisiana Coastal Area (LCA) Ascension and
Livingston Parishes, LA, Wait Period Ends: 11/08/2010, Contact: Dr.
William P. Klein, Jr. 504-862-2540.
Amended Notices
EIS No. 20100370, Final EIS, FHWA, WY, Jackson South Project, US/26/89/
189/91 Improvements, Funding and Right-of-Way Approval, Teton County,
WY, Wait Period Ends: 11/17/2010, Contact: Lee Potter 307-771-2946.
Revision to FR Notice Published 09/17/2010: Extending Comment
Period from 10/18/2010 to 11/17/2010.
Dated: October 5, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-25470 Filed 10-7-10; 8:45 am]
BILLING CODE 6560-50-P