Hampshire Paper Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 61460 [2010-24978]
Download as PDF
61460
Federal Register / Vol. 75, No. 192 / Tuesday, October 5, 2010 / Notices
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
(P-5044) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24980 Filed 10–4–10; 8:45 am]
BILLING CODE 6717–01–P
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2010–24979 Filed 10–4–10; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 2850–015]
Federal Energy Regulatory
Commission
Hampshire Paper Company; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
[Project No. 5044–015]
Avondale Mills Inc.; Augusta Canal
Authority; Notice of Application for
Transfer of License, and Soliciting
Comments and Motions To Intervene
mstockstill on DSKH9S0YB1PROD with NOTICES
September 24, 2010.
On September 13, 2010, Avondale
Mills Inc. (transferor) and Augusta
Canal Authority (transferee) filed an
application for transfer of license for the
Sibley Mill Project No. 5044, located on
the Augusta Canal in the City of
Augusta, Richmond County, Georgia.
Applicants seek Commission approval
to transfer the license for the Sibley Mill
Project from transferor to transferee.
Applicants’ Contact: Alan W. Stuart,
Kleinschmidt Associates, 204
Caughman Farm Lane, Suite 301,
Lexington, SC 20972, (803) 462–5620.
FERC Contact: Kim Carter (202) 502–
6486.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice. Comments
and motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1) and the instructions
on the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
VerDate Mar<15>2010
18:36 Oct 04, 2010
Jkt 223001
September 24, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2850–015.
c. Date Filed: June 17, 2010.
d. Applicant: Hampshire Paper
Company.
e. Name of Project: Emeryville
Hydroelectric Project.
f. Location: On the Oswegatchie River
in the hamlet of Emeryville, in St.
Lawrence County, New York. The
project does not occupy federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Michael
McDonald, Facility Manager, Hampshire
Paper Company, 1827 County Road 22,
Gouverneur, NY 13642; Telephone (315)
287–1990.
i. FERC Contact: John Baummer, (202)
502–6837 or john.baummer@FERC.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing Emeryville Project consists of:
(1) A 16.7-foot-high, 185-foot-long,
timber and earth fill gravity dam with a
17-foot-long concrete spillway equipped
with 2.4-foot-high flashboards and a 4foot-wide minimum flow rectangular
weir with a minimum elevation of 584.2
feet mean sea level (msl); (2) a 35-acre
reservoir with a normal water surface
elevation of 586.6 feet msl; (3) a 140foot-long by 30-foot-wide reinforced
concrete intake and headrace structure
equipped with four headgates and a
trashrack with 5-inch spacing; (4) a 60foot-long by 14-foot-diameter steel
penstock leading to; (5) a 67-foot-long
by 32-foot concrete powerhouse
PO 00000
Frm 00050
Fmt 4703
Sfmt 9990
containing a horizontal axial flow
turbine with a maximum hydraulic
capacity of 1,470 cubic feet per second
and a net head of 32 feet, directly
connected to a horizontal generator unit
with a rated capacity of 3,481 kilowatts
for an estimated average annual
generation of 18,400 megawatt-hours;
(6) an 80-foot-long, 23-kilovolt
transmission line; and (7) appurtenant
facilities.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Tendering Notice ........
Notice of Acceptance/
Notice of Ready for
Environmental Analysis.
Filing of recommendations, preliminary
terms and conditions, and fishway
prescriptions.
Commission issues
Non-Draft EA.
Comments on EA .......
Modified terms and
conditions.
September 27, 2010.
November 12, 2010.
January 11, 2011.
May 11, 2011.
June 10, 2011.
August 9, 2011.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24978 Filed 10–4–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\05OCN1.SGM
05OCN1
Agencies
[Federal Register Volume 75, Number 192 (Tuesday, October 5, 2010)]
[Notices]
[Page 61460]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24978]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2850-015]
Hampshire Paper Company; Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
September 24, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2850-015.
c. Date Filed: June 17, 2010.
d. Applicant: Hampshire Paper Company.
e. Name of Project: Emeryville Hydroelectric Project.
f. Location: On the Oswegatchie River in the hamlet of Emeryville,
in St. Lawrence County, New York. The project does not occupy federal
lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Michael McDonald, Facility Manager, Hampshire
Paper Company, 1827 County Road 22, Gouverneur, NY 13642; Telephone
(315) 287-1990.
i. FERC Contact: John Baummer, (202) 502-6837 or
john.baummer@FERC.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The existing Emeryville Project
consists of: (1) A 16.7-foot-high, 185-foot-long, timber and earth fill
gravity dam with a 17-foot-long concrete spillway equipped with 2.4-
foot-high flashboards and a 4-foot-wide minimum flow rectangular weir
with a minimum elevation of 584.2 feet mean sea level (msl); (2) a 35-
acre reservoir with a normal water surface elevation of 586.6 feet msl;
(3) a 140-foot-long by 30-foot-wide reinforced concrete intake and
headrace structure equipped with four headgates and a trashrack with 5-
inch spacing; (4) a 60-foot-long by 14-foot-diameter steel penstock
leading to; (5) a 67-foot-long by 32-foot concrete powerhouse
containing a horizontal axial flow turbine with a maximum hydraulic
capacity of 1,470 cubic feet per second and a net head of 32 feet,
directly connected to a horizontal generator unit with a rated capacity
of 3,481 kilowatts for an estimated average annual generation of 18,400
megawatt-hours; (6) an 80-foot-long, 23-kilovolt transmission line; and
(7) appurtenant facilities.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule:
The application will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule may be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Tendering Notice..................... September 27, 2010.
Notice of Acceptance/Notice of Ready November 12, 2010.
for Environmental Analysis.
Filing of recommendations, January 11, 2011.
preliminary terms and conditions,
and fishway prescriptions.
Commission issues Non-Draft EA....... May 11, 2011.
Comments on EA....................... June 10, 2011.
Modified terms and conditions........ August 9, 2011.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24978 Filed 10-4-10; 8:45 am]
BILLING CODE 6717-01-P