The Narragansett Electric Company; Arcadia Gas Storage, LLC; Salt Plains Storage, LLC; Jefferson Island Storage & Hub, L.L.C.; Eagle Rock Desoto Pipeline, L.P.; The Brooklyn Union Gas Company; Arkansas Ok Gas Corporation; Notice of Baseline Filings, 61463 [2010-24975]
Download as PDF
Federal Register / Vol. 75, No. 192 / Tuesday, October 5, 2010 / Notices
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Wednesday, October 13, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24974 Filed 10–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSKH9S0YB1PROD with NOTICES
[Docket No. PR10–114–000; Docket No.
PR10–117–000; Docket No. PR10–118–000;
Docket No. PR10–119–000; Docket No.
PR10–120–000; Docket No. PR10–121–000;
Docket No. PR10–122–000 (Not
Consolidated)]
The Narragansett Electric Company;
Arcadia Gas Storage, LLC; Salt Plains
Storage, LLC; Jefferson Island Storage
& Hub, L.L.C.; Eagle Rock Desoto
Pipeline, L.P.; The Brooklyn Union Gas
Company; Arkansas Ok Gas
Corporation; Notice of Baseline Filings
services provided under section 311 of
the Natural Gas Policy Act of 1978
(NGPA).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Wednesday, October 13, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24975 Filed 10–4–10; 8:45 am]
BILLING CODE 6717–01–P
September 29, 2010.
Take notice that on September 22,
2010, September 23, 2010, September
24, 2010, and September 27, 2010,
respectively the applicants listed above
submitted their baseline filing of its
Statement of Operating Conditions for
VerDate Mar<15>2010
18:36 Oct 04, 2010
Jkt 223001
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
61463
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 13809–000; 13814–000]
Lock+ Hydro Friends Fund XLIX; FFP
Missouri 15, LLC; Notice of Competing
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
September 28, 2010.
On July 12, 2010, Lock+ Hydro
Friends Fund XLVIII (Hydro Friends)
and FFP Missouri 15, LLC (FFP) filed
preliminary permit applications,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of a hydropower project at the
U.S. Army Corps of Engineers’ (Corps)
Mississippi River Lock and Dam #14
structure, located on the Mississippi
River near Bettendorf, Rockland County,
Illinois. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Hydro Friends’ proposed Lock and
Dam #14 Hydropower Project (Project
No. 13809–000) would consist of: (1)
One 109-foot-wide x 40-foot-high lock
frame module placed downstream from
the lock and dam, housed between two
pre-fabricated concrete walls that would
guide flows into the turbines. The lock
frame module would consist of ten
hydropower turbines, each rated at 1.25
megawatts (MW) and have a total rated
capacity of 12.5 MW; (2) fish/debris
screens located upstream of the module;
(3) a new transformer in a new
switchyard; (4) a 3-mile-long 69-kilovolt
(kV) transmission line extending from
the switchyard to an existing nearby
distribution line; and (5) appurtenant
facilities. Hydro Friends is also
exploring alternatives that would locate
the module in the downstream section
of the Corps’ navigational lock, and
upstream of the dam. Each design
would have an average annual
generation of 54,788 megawatt-hours
per year (MWh/yr). The project would
operate run-of-river and utilize flows
released from the dam.
Applicant Contact: Mr. Wayne F.
Krouse, Chairman and CEO, Hydro
Green Energy, LLC, 5090 Richmond
Avenue #390, Houston, TX 77056;
Telephone: (877) 556–6566 x 709.
E:\FR\FM\05OCN1.SGM
05OCN1
Agencies
[Federal Register Volume 75, Number 192 (Tuesday, October 5, 2010)]
[Notices]
[Page 61463]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24975]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR10-114-000; Docket No. PR10-117-000; Docket No. PR10-118-
000; Docket No. PR10-119-000; Docket No. PR10-120-000; Docket No. PR10-
121-000; Docket No. PR10-122-000 (Not Consolidated)]
The Narragansett Electric Company; Arcadia Gas Storage, LLC; Salt
Plains Storage, LLC; Jefferson Island Storage & Hub, L.L.C.; Eagle Rock
Desoto Pipeline, L.P.; The Brooklyn Union Gas Company; Arkansas Ok Gas
Corporation; Notice of Baseline Filings
September 29, 2010.
Take notice that on September 22, 2010, September 23, 2010,
September 24, 2010, and September 27, 2010, respectively the applicants
listed above submitted their baseline filing of its Statement of
Operating Conditions for services provided under section 311 of the
Natural Gas Policy Act of 1978 (NGPA).
Any person desiring to participate in this rate proceeding must
file a motion to intervene or to protest this filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the
Applicant. Anyone filing an intervention or protest on or before the
intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 7 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern time on Wednesday, October 13, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24975 Filed 10-4-10; 8:45 am]
BILLING CODE 6717-01-P