Texas Gas Transmission, LLC; Notice of Motion To Vacate, 61477 [2010-24948]

Download as PDF Federal Register / Vol. 75, No. 192 / Tuesday, October 5, 2010 / Notices EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. 2010–24956 Filed 10–4–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–417–000] Texas Gas Transmission, LLC; Notice of Motion To Vacate mstockstill on DSKH9S0YB1PROD with NOTICES September 28, 2010. Take notice that on September 22, 2010, Texas Gas Transmission, LLC (Texas Gas), 3800 Frederica Street, Owensboro, Kentucky 42301, filed in Docket No. CP07–417–000, a motion to vacate a portion of the certificate authority granted on May 2, 2008 1 allowing Texas Gas to construct, own, operate, and maintain the Kosciusko Compressor Station in Attala County, Mississippi. Texas Gas states that, in light of Texas Eastern Transmission, L.P.’s (Texas Eastern) authorization and plans to upgrade its existing compressor station in order to facilitate the connection between Texas Eastern’s pipeline and Texas Gas’ Greenville Lateral, the construct of the Kosciusko Compressor Station authorized in the May 20 Order will not be required. The purpose of this station was to compress gas to a sufficient pressure to deliver gas into the downstream pipeline owned by Texas Eastern. Since Texas Gas can meet its certificated capacity without the Kosciusko Compressor Station, Texas Gas asserts that the construction of the Kosciusko Compressor Station is no longer necessary. The motion is on file with the Commission and open to public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. 1 Texas Gas Transmission, LLC, 123 FERC ¶ 61,118 (2008), Order Amending Certificate, 125 FERC ¶62,030 (2008), Order Amending Certificate, 125 FERC ¶62,148 (2008), Order Amending Certificate, 126 FERC ¶62,008 (2009). (‘‘May 2 Order’’). VerDate Mar<15>2010 18:36 Oct 04, 2010 Jkt 223001 Any questions regarding this Application should be directed to Kathy D. Fort, Manager of Certificates and Tariffs, Texas Gas Transmission, LLC, 3800 Frederica Street, Owensboro, Kentucky, 42301 or by telephone at 270–688–6825 or fax at 270–688–5871. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone PO 00000 Frm 00067 Fmt 4703 Sfmt 9990 61477 will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: October 19, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–24948 Filed 10–4–10; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\05OCN1.SGM 05OCN1

Agencies

[Federal Register Volume 75, Number 192 (Tuesday, October 5, 2010)]
[Notices]
[Page 61477]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24948]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-417-000]


Texas Gas Transmission, LLC; Notice of Motion To Vacate

September 28, 2010.
    Take notice that on September 22, 2010, Texas Gas Transmission, LLC 
(Texas Gas), 3800 Frederica Street, Owensboro, Kentucky 42301, filed in 
Docket No. CP07-417-000, a motion to vacate a portion of the 
certificate authority granted on May 2, 2008 \1\ allowing Texas Gas to 
construct, own, operate, and maintain the Kosciusko Compressor Station 
in Attala County, Mississippi. Texas Gas states that, in light of Texas 
Eastern Transmission, L.P.'s (Texas Eastern) authorization and plans to 
upgrade its existing compressor station in order to facilitate the 
connection between Texas Eastern's pipeline and Texas Gas' Greenville 
Lateral, the construct of the Kosciusko Compressor Station authorized 
in the May 20 Order will not be required. The purpose of this station 
was to compress gas to a sufficient pressure to deliver gas into the 
downstream pipeline owned by Texas Eastern. Since Texas Gas can meet 
its certificated capacity without the Kosciusko Compressor Station, 
Texas Gas asserts that the construction of the Kosciusko Compressor 
Station is no longer necessary.
---------------------------------------------------------------------------

    \1\ Texas Gas Transmission, LLC, 123 FERC ] 61,118 (2008), Order 
Amending Certificate, 125 FERC ]62,030 (2008), Order Amending 
Certificate, 125 FERC ]62,148 (2008), Order Amending Certificate, 
126 FERC ]62,008 (2009). (``May 2 Order'').
---------------------------------------------------------------------------

    The motion is on file with the Commission and open to public 
inspection. This filing is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for 
TTY, contact (202) 502-8659.
    Any questions regarding this Application should be directed to 
Kathy D. Fort, Manager of Certificates and Tariffs, Texas Gas 
Transmission, LLC, 3800 Frederica Street, Owensboro, Kentucky, 42301 or 
by telephone at 270-688-6825 or fax at 270-688-5871.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: October 19, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24948 Filed 10-4-10; 8:45 am]
BILLING CODE 6717-01-P