Colorado Interstate Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Spruce Hill Air Blending Project and Request for Comments on Environmental Issues, 60441-60443 [2010-24514]
Download as PDF
Federal Register / Vol. 75, No. 189 / Thursday, September 30, 2010 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13833–000]
Northern Wasco People’s Utility
District; Notice of Preliminary Permit
Application Accepted For Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
mstockstill on DSKH9S0YB1PROD with NOTICES6
September 22, 2010.
On August 23, 2010, Northern Wasco
People’s Utility District (Northern
Wasco PUD) filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
White River Falls Hydroelectric project
near Maupin, Wasco County, Oregon.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project calls for
redevelopment of a hydroelectric project
constructed in 1902 and
decommissioned in 1963. Northern
Wasco PUD proposes to reconstruct,
replace, and repair some existing
features, as well as build new features
at the site.
The proposed project will consist of
the following: (1) New head works; (2)
anchors placed throughout the existing
weir; (3) a new 600-foot-long, 6-footdiameter penstock to be constructed at
the site of the old structure; (4) a new
powerhouse with two turbine/generator
units with an installed capacity of 3.4 to
4.0-megawatts; (5) a 4.15-kilovolt, 1,800foot-long, underground transmission
line connecting to an existing
substation; and (6) appurtenant
facilities. The estimated annual
generation of the White River Falls
project is 16,000 megawatt-hours.
Applicant Contact: Bob Guidinger,
Hydro Dept Manager, Northern Wasco
PUD, 2345 River Road, The Dalles, OR
97058; phone: (541) 298–3325.
FERC Contact: Patrick Murphy (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
VerDate Mar<15>2010
17:48 Sep 29, 2010
Jkt 220001
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13833–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
60441
BILLING CODE 6717–01–P
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Friday, October 1, 2010.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24513 Filed 9–29–10; 8:45 am]
[FR Doc. 2010–24515 Filed 9–29–10; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. PR10–12–001]
DEPARTMENT OF ENERGY
Arkansas Western Gas Company;
Notice of Compliance Filing
September 23, 2010.
Take notice that on September 17,
2010, Arkansas Western Gas Company
(AWG) filed pursuant to an August 20,
2010, Letter Order which required AWG
to file within 30 days of the issuance of
the August 20 order a stand alone
statement of rates that includes all
currently effective maximum and
minimum rates and fuel charges.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. CP10–486–000]
Colorado Interstate Gas Company;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Spruce Hill Air Blending
Project and Request for Comments on
Environmental Issues
September 21, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Spruce Hill Air Blending Project
involving construction and operation of
facilities by Colorado Interstate Gas
Company (CIG) in Douglas County,
Colorado. This EA will be used by the
Commission in its decision-making
process to determine whether the
E:\FR\FM\30SEN1.SGM
30SEN1
60442
Federal Register / Vol. 75, No. 189 / Thursday, September 30, 2010 / Notices
mstockstill on DSKH9S0YB1PROD with NOTICES6
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on October 21,
2010.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice CIG provided to landowners.
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site (https://
www.ferc.gov).
Summary of the Proposed Project
CIG proposes to construct and operate
a new air blending station in Douglas
County, Colorado. The Spruce Hill Air
Blending Project would increase CIG’s
firm natural gas transportation capacity
to 50,000 dekatherms per day (Dth/day)
to meet contractual agreements with
Black Hills Utility Holdings, Inc. (Black
Hill) as a result of Black Hill’s
anticipated demand growth. According
to CIG, its project would reduce the
input factor of the gas to a level that
conforms to the gas quality
specifications in CIG’s Tariff for its
existing Valley Line, to which the
blended gas would be discharged.
The Spruce Hill Air Blending Project
would consist of the following:
• An air blending compressor station
(the Spruce Hill Air Blending Station)
VerDate Mar<15>2010
17:48 Sep 29, 2010
Jkt 220001
containing a 215-, a 390-, and a 500horsepower air compressor;
• A back-pressure regulator;
• Air blending controls and
instrumentation;
• A gas heater;
• Auxiliary facilities and piping;
• Modifications to the existing Spruce
Hill Meter Station;
• An interconnection at the air
blending station between the existing
Spruce Hill Meter Station and CIG’s
existing Line No. 212A; and
• A powerline connection within
CIG’s 35-acre parcel.
The general location of the project
facilities is shown in Appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 5.5 acres of land for
the air blending station and its auxiliary
facilities. Following construction, about
3.3 acres would be maintained for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and allowed to revert to
former uses. All construction would
occur within a 35-acre land parcel
owned by CIG.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental
staff of the Commission’s Office of Energy Projects.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
Colorado State Historic Preservation
Office, and to solicit their views and
those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.3 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project is further developed. On
natural gas facility projects, the APE at
a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
3 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Historic properties are
defined in those regulations as any prehistoric or
historic district, site, building, structure, or object
included in or eligible for inclusion in the National
Register for Historic Places.
E:\FR\FM\30SEN1.SGM
30SEN1
Federal Register / Vol. 75, No. 189 / Thursday, September 30, 2010 / Notices
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
mstockstill on DSKH9S0YB1PROD with NOTICES6
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before October
21, 2010.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP10–486–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at www.ferc.gov
under the link to Documents and
Filings. An eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at www.ferc.gov
under the link to Documents and
Filings. With eFiling you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
VerDate Mar<15>2010
17:48 Sep 29, 2010
Jkt 220001
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
60443
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24514 Filed 9–29–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EC10–67–001]
BHE Holdings, Inc., Maine & Maritimes
Corporation; Notice of Filing
September 22, 2010.
Take notice that, on September 15,
2010, BHE Holdings, Inc. and Maine &
Maritimes Corporation (Merger
Applicants) submitted an amendment to
an earlier application that was filed on
May 11, 2010, in the above-referenced
proceeding pursuant to section 203 of
the Federal Power Act.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
Additional Information
not serve to make protestants parties to
the proceeding. Any person wishing to
Additional information about the
become a party must file a notice of
project is available from the
Commission’s Office of External Affairs, intervention or motion to intervene, as
at (866) 208–FERC, or on the FERC Web appropriate. Such notices, motions, or
protests must be filed on or before the
site at https://www.ferc.gov using the
comment date. Anyone filing a motion
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and enter to intervene or protest must serve a copy
of that document on the Applicant and
the docket number, excluding the last
all the parties in this proceeding.
three digits in the Docket Number field
The Commission encourages
(i.e., CP10–486). Be sure you have
electronic submission of protests and
selected an appropriate date range. For
interventions in lieu of paper using the
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
or toll free at (866) 208–3676, or for
should submit an original and 14 copies
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the of the protest or intervention to the
texts of formal documents issued by the Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
Commission, such as orders, notices,
20426.
and rulemakings.
In addition, the Commission now
This filing is accessible online at
offers a free service called eSubscription https://www.ferc.gov, using the
which allows you to keep track of all
‘‘eLibrary’’ link and is available for
formal issuances and submittals in
review in the Commission’s Public
specific dockets. This can reduce the
Reference Room in Washington, DC.
amount of time you spend researching
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 75, Number 189 (Thursday, September 30, 2010)]
[Notices]
[Pages 60441-60443]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24514]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-486-000]
Colorado Interstate Gas Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Spruce Hill Air Blending
Project and Request for Comments on Environmental Issues
September 21, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Spruce Hill Air Blending
Project involving construction and operation of facilities by Colorado
Interstate Gas Company (CIG) in Douglas County, Colorado. This EA will
be used by the Commission in its decision-making process to determine
whether the
[[Page 60442]]
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on October 21, 2010.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the pipeline company could
initiate condemnation proceedings where compensation would be
determined in accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice CIG provided to landowners. This fact sheet addresses a
number of typically-asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings. It is
also available for viewing on the FERC Web site (https://www.ferc.gov).
Summary of the Proposed Project
CIG proposes to construct and operate a new air blending station in
Douglas County, Colorado. The Spruce Hill Air Blending Project would
increase CIG's firm natural gas transportation capacity to 50,000
dekatherms per day (Dth/day) to meet contractual agreements with Black
Hills Utility Holdings, Inc. (Black Hill) as a result of Black Hill's
anticipated demand growth. According to CIG, its project would reduce
the input factor of the gas to a level that conforms to the gas quality
specifications in CIG's Tariff for its existing Valley Line, to which
the blended gas would be discharged.
The Spruce Hill Air Blending Project would consist of the
following:
An air blending compressor station (the Spruce Hill Air
Blending Station) containing a 215-, a 390-, and a 500-horsepower air
compressor;
A back-pressure regulator;
Air blending controls and instrumentation;
A gas heater;
Auxiliary facilities and piping;
Modifications to the existing Spruce Hill Meter Station;
An interconnection at the air blending station between the
existing Spruce Hill Meter Station and CIG's existing Line No. 212A;
and
A powerline connection within CIG's 35-acre parcel.
The general location of the project facilities is shown in Appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 5.5
acres of land for the air blending station and its auxiliary
facilities. Following construction, about 3.3 acres would be maintained
for permanent operation of the project's facilities; the remaining
acreage would be restored and allowed to revert to former uses. All
construction would occur within a 35-acre land parcel owned by CIG.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping''. The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section below.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the Colorado State Historic Preservation Office, and to solicit
their views and those of other government agencies, interested Indian
tribes, and the public on the project's potential effects on historic
properties.\3\ We will define the project-specific Area of Potential
Effects (APE) in consultation with the SHPO as the project is further
developed. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way,
[[Page 60443]]
contractor/pipe storage yards, compressor stations, and access roads).
Our EA for this project will document our findings on the impacts on
historic properties and summarize the status of consultations under
section 106.
---------------------------------------------------------------------------
\3\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Historic
properties are defined in those regulations as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register for Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that they will be received in Washington, DC on or before October 21,
2010.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP10-486-000) with your
submission. The Commission encourages electronic filing of comments and
has expert eFiling staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at www.ferc.gov
under the link to Documents and Filings. An eComment is an easy method
for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at www.ferc.gov
under the link to Documents and Filings. With eFiling you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making. A comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at https://www.ferc.gov using the ``eLibrary'' link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., CP10-486). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24514 Filed 9-29-10; 8:45 am]
BILLING CODE 6717-01-P