Public Service Company of Colorado; Notice of Rate Election, 59707 [2010-24232]

Download as PDF Federal Register / Vol. 75, No. 187 / Tuesday, September 28, 2010 / Notices document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–24230 Filed 9–27–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13662–000] Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications srobinson on DSKHWCL6B1PROD with NOTICES September 21, 2010. On February 9, 2010, and supplemented on July 16, 2010, Coastal Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Winchester Dam Hydroelectric Project, to be located at the Winchester dam on the North Umpqua River, in Douglas County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) Five new submersible Kaplan turbine/generator units with a total installed capacity of 2.5 megawatts, to be installed replacing sections of the existing dam; (2) a new control house building; and (3) a new approximately 100-foot-long, 20-kilovolt transmission line interconnecting to an existing substation. The estimated annual generation of the project would be 13 gigawatt-hours. Applicant Contact: Neil Anderson, Coastal Hydropower, LLC, Key Centre, 601 108th Avenue, NE., Suite 1900, Bellevue, WA 98004; phone: (425) 943– 7690. FERC Contact: Dianne Rodman; phone: (202) 502–6077. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and VerDate Mar<15>2010 15:22 Sep 27, 2010 Jkt 220001 competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13662–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–24235 Filed 9–27–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 59707 intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Monday, October 4, 2010. Kimberly D. Bose, Secretary. Federal Energy Regulatory Commission [FR Doc. 2010–24232 Filed 9–27–10; 8:45 am] [Docket No. PR10–111–000] BILLING CODE 6717–01–P Public Service Company of Colorado; Notice of Rate Election DEPARTMENT OF ENERGY September 21, 2010. Federal Energy Regulatory Commission Take notice that on September 17, 2010, Public Service Company of Colorado (PSCo) filed a Rate Election pursuant to section 284.123(b)(1)(ii) of the Commission’s regulations. PSCo proposes to utilize rates that are the same as those contained in PSCo’s transportation rate schedules for comparable intrastate service on file with the Colorado Public Utilities Commission (Colorado PUC). Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 [Docket No. ER02–2001–016; Docket No. ER06–885–000; Docket No. ER04–289–000] Electric Quarterly Reports; BM2 LLC; DJGW, LLC; Order on Intent To Revoke Market-Based Rate Authority Issued September 22, 2010. Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. 1. Section 205 of the Federal Power Act (FPA), 16 U.S.C. 824d (2006), and 18 CFR part 35 (2010), require, among other things, that all rates, terms, and conditions of jurisdictional services be filed with the Commission. In Order No. 2001, the Commission revised its public utility filing requirements and established a requirement for public utilities, including power marketers, to E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 75, Number 187 (Tuesday, September 28, 2010)]
[Notices]
[Page 59707]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24232]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PR10-111-000]


Public Service Company of Colorado; Notice of Rate Election

September 21, 2010.
    Take notice that on September 17, 2010, Public Service Company of 
Colorado (PSCo) filed a Rate Election pursuant to section 
284.123(b)(1)(ii) of the Commission's regulations. PSCo proposes to 
utilize rates that are the same as those contained in PSCo's 
transportation rate schedules for comparable intrastate service on file 
with the Colorado Public Utilities Commission (Colorado PUC).
    Any person desiring to participate in this rate filing must file in 
accordance with Rules 211 and 214 of the Commission's Rules of Practice 
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered 
by the Commission in determining the appropriate action to be taken, 
but will not serve to make protestants parties to the proceeding. Any 
person wishing to become a party must file a notice of intervention or 
motion to intervene, as appropriate. Such notices, motions, or protests 
must be filed on or before the date as indicated below. Anyone filing 
an intervention or protest must serve a copy of that document on the 
Applicant. Anyone filing an intervention or protest on or before the 
intervention or protest date need not serve motions to intervene or 
protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 7 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern time on Monday, October 4, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24232 Filed 9-27-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.