Public Service Company of Colorado; Notice of Rate Election, 59707 [2010-24232]
Download as PDF
Federal Register / Vol. 75, No. 187 / Tuesday, September 28, 2010 / Notices
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24230 Filed 9–27–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13662–000]
Coastal Hydropower, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
srobinson on DSKHWCL6B1PROD with NOTICES
September 21, 2010.
On February 9, 2010, and
supplemented on July 16, 2010, Coastal
Hydropower, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Winchester Dam Hydroelectric
Project, to be located at the Winchester
dam on the North Umpqua River, in
Douglas County, Oregon. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) Five new submersible
Kaplan turbine/generator units with a
total installed capacity of 2.5 megawatts,
to be installed replacing sections of the
existing dam; (2) a new control house
building; and (3) a new approximately
100-foot-long, 20-kilovolt transmission
line interconnecting to an existing
substation. The estimated annual
generation of the project would be 13
gigawatt-hours.
Applicant Contact: Neil Anderson,
Coastal Hydropower, LLC, Key Centre,
601 108th Avenue, NE., Suite 1900,
Bellevue, WA 98004; phone: (425) 943–
7690.
FERC Contact: Dianne Rodman;
phone: (202) 502–6077.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
VerDate Mar<15>2010
15:22 Sep 27, 2010
Jkt 220001
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http:
//www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13662–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–24235 Filed 9–27–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
59707
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Monday, October 4, 2010.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2010–24232 Filed 9–27–10; 8:45 am]
[Docket No. PR10–111–000]
BILLING CODE 6717–01–P
Public Service Company of Colorado;
Notice of Rate Election
DEPARTMENT OF ENERGY
September 21, 2010.
Federal Energy Regulatory
Commission
Take notice that on September 17,
2010, Public Service Company of
Colorado (PSCo) filed a Rate Election
pursuant to section 284.123(b)(1)(ii) of
the Commission’s regulations. PSCo
proposes to utilize rates that are the
same as those contained in PSCo’s
transportation rate schedules for
comparable intrastate service on file
with the Colorado Public Utilities
Commission (Colorado PUC).
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
[Docket No. ER02–2001–016; Docket No.
ER06–885–000; Docket No. ER04–289–000]
Electric Quarterly Reports; BM2 LLC;
DJGW, LLC; Order on Intent To Revoke
Market-Based Rate Authority
Issued September 22, 2010.
Before Commissioners: Jon Wellinghoff,
Chairman; Marc Spitzer, Philip D. Moeller,
John R. Norris, and Cheryl A. LaFleur.
1. Section 205 of the Federal Power
Act (FPA), 16 U.S.C. 824d (2006), and
18 CFR part 35 (2010), require, among
other things, that all rates, terms, and
conditions of jurisdictional services be
filed with the Commission. In Order No.
2001, the Commission revised its public
utility filing requirements and
established a requirement for public
utilities, including power marketers, to
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 75, Number 187 (Tuesday, September 28, 2010)]
[Notices]
[Page 59707]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24232]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR10-111-000]
Public Service Company of Colorado; Notice of Rate Election
September 21, 2010.
Take notice that on September 17, 2010, Public Service Company of
Colorado (PSCo) filed a Rate Election pursuant to section
284.123(b)(1)(ii) of the Commission's regulations. PSCo proposes to
utilize rates that are the same as those contained in PSCo's
transportation rate schedules for comparable intrastate service on file
with the Colorado Public Utilities Commission (Colorado PUC).
Any person desiring to participate in this rate filing must file in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered
by the Commission in determining the appropriate action to be taken,
but will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed on or before the date as indicated below. Anyone filing
an intervention or protest must serve a copy of that document on the
Applicant. Anyone filing an intervention or protest on or before the
intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 7 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern time on Monday, October 4, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24232 Filed 9-27-10; 8:45 am]
BILLING CODE 6717-01-P