Federal Acquisition Regulation; Time-and-Materials (T&M) and Labor-Hour (LH) Contracts for Commercial Items, 59195-59197 [2010-24104]
Download as PDF
Federal Register / Vol. 75, No. 186 / Monday, September 27, 2010 / Proposed Rules
Flooding source(s)
Location of referenced elevation
* Elevation in feet (NGVD)
+ Elevation in feet (NAVD)
# Depth in feet above
ground
∧ Elevation in meters
(MSL)
Effective
59195
Communities affected
Modified
** BFEs to be changed include the listed downstream and upstream BFEs, and include BFEs located on the stream reach between the referenced locations above. Please refer to the revised Flood Insurance Rate Map located at the community map repository (see below) for
exact locations of all BFEs to be changed.
Send comments to Roy E. Wright, Deputy Director, Risk Analysis Division, Federal Insurance and Mitigation Administration, Federal Emergency
Management Agency, 500 C Street, SW., Washington, DC 20472.
ADDRESSES
Township of Brady
Maps are available for inspection
Township of Perry
Maps are available for inspection
Township of Richland
Maps are available for inspection
Township of Toby
Maps are available for inspection
at the Brady Township Building, 141 West Liberty Road, Slipery Rock, PA 16057.
at the Perry Township Building, 5687 Doc Walker Road, Parker, PA 16049.
at the Richland Township Building, 511 Dittman Road, Emlenton, PA 16373.
at the Toby Township Building, 37 Simmons Road, Rimersburg, PA 16248.
(Catalog of Federal Domestic Assistance No.
97.022, ‘‘Flood Insurance.’’)
Dated: September 13, 2010.
Sandra K. Knight,
Deputy Federal Insurance and Mitigation
Administrator, Mitigation, Department of
Homeland Security, Federal Emergency
Management Agency.
[FR Doc. 2010–24148 Filed 9–24–10; 8:45 am]
BILLING CODE 9110–12–P
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
48 CFR Parts 8, 12, and 16
[FAR Case 2009–043; Docket 2010–0100;
Sequence 1]
RIN: 9000–AL74
Federal Acquisition Regulation; Timeand-Materials (T&M) and Labor-Hour
(LH) Contracts for Commercial Items
Department of Defense (DoD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Proposed rule.
emcdonald on DSK2BSOYB1PROD with PROPOSALS
AGENCY:
The Civilian Agency
Acquisition Council and the Defense
Acquisition Regulations Council (the
Councils) are proposing to amend the
Federal Acquisition Regulation (FAR) to
implement recommendations of the
Government Accountability Office
(GAO) Report 09–579 dated June 2009
SUMMARY:
VerDate Mar<15>2010
16:48 Sep 24, 2010
Jkt 220001
to Congressional Committees on
‘‘Minimal Compliance with New
Safeguards for Time-and-Materials
Contracts for Commercial Services and
Safeguards Have Not Been Applied to
GSA Schedules Program.’’
DATES: Interested parties should submit
written comments to the Regulatory
Secretariat on or before November 26,
2010 to be considered in the
formulation of a final rule.
ADDRESSES: Submit comments
identified by FAR Case 2009–043 by any
of the following methods:
• Regulations.gov: https://
www.regulations.gov. Submit comments
via the Federal eRulemaking portal by
inputting ‘‘FAR Case 2009–043’’ under
the heading ‘‘Enter Keyword or ID’’ and
selecting ‘‘Search’’. Select the link
‘‘Submit a Comment’’ that corresponds
with ‘‘FAR Case 2009–043’’. Follow the
instructions provided at the ‘‘Submit a
Comment’’ screen. Please include your
name, company name (if any), and ‘‘FAR
Case 2009–043’’ on your attached
document.
• Fax: 202–501–4067.
• Mail: General Services
Administration, Regulatory Secretariat
(MVCB), Attn: Hada Flowers, 1800 F
Street, NW., Room 4041, Washington,
DC 20405.
Instructions: Please submit comments
only and cite FAR Case 2009–043, in all
correspondence related to this case. All
comments received will be posted
without change to https://
www.regulations.gov, including any
personal and/or business confidential
information provided.
FOR FURTHER INFORMATION CONTACT: Mr.
Warren Blankenship, Procurement
PO 00000
Frm 00038
Fmt 4702
Sfmt 4702
Analyst, at (202) 501–1900, for
clarification of content. For information
pertaining to status or publication
schedules, contact the Regulatory
Secretariat at (202) 501–4755. Please
cite FAR case 2009–043.
SUPPLEMENTARY INFORMATION:
A. Background
This rule proposes to amend the FAR
to implement the recommendations of
GAO’s Report to Congressional
Committees 09–579 dated June 2009 on
‘‘Minimal Compliance with New
Safeguards for Time-and-Materials
Contracts for Commercial Services and
Safeguards Have Not Been Applied to
the GSA Schedules Program.’’ GAO was
directed by the National Defense
Authorization Act of Fiscal Year 2004
conference report to review the use of
the new authority being authorized in
section 1432 of the Act, the extent to
which it had been used, the types of
contracts for which the authority had
been used, and the degree to which such
use was in compliance with the
safeguards included in section 1432
(including the requirement that timeand-material and labor-hour contracts
be used only where no other contract
type was suitable).
GAO reviewed contract files,
interviewed contracting and
procurement policy officials, and
utilized legal interpretations of the
applicability of the determination and
findings (D&F) requirement to the GSA
Schedules program. GAO believes that
the evidence and findings obtained
during its audit substantiates the
conclusions and associated
recommendations in the report. The
E:\FR\FM\27SEP1.SGM
27SEP1
emcdonald on DSK2BSOYB1PROD with PROPOSALS
59196
Federal Register / Vol. 75, No. 186 / Monday, September 27, 2010 / Proposed Rules
GAO audit revealed that,
Governmentwide, contracting officers
had the mistaken impression that the
fixed labor rates in the time-andmaterial/labor-hour contracts make
them fixed price type contracts. The
audit further revealed that there was a
general lack of awareness of the FAR
part 12 determinations and findings
requirement among contracting officers
across all Government agencies in their
review of contract actions more than
two (2) years after the determinations
and findings requirement was
implemented in the FAR. There was a
failure of management to detect the lack
of compliance with these safeguards.
GAO recommended that further action
was required for the use of time-andmaterial contracts to acquire
commercial services in order to help
ensure that this contract type is used
only when no other contract type is
suitable and instill discipline in the
determination of contract type with a
view toward managing the risk to the
Government. Therefore, GAO
recommended that the following steps
be taken:
• Amend FAR Subpart 16.6 (Timeand-Materials, Labor-Hour, and Letter
Contracts) and FAR Subpart 16.2 (FixedPrice Contracts) to make it clear that
contracts with a fixed hourly labor rate
and an estimated ceiling price are timeand-materials or labor-hour contracts,
not fixed-price type contracts;
• Amend FAR Subpart 8.4 (pertaining
to the Schedules program) to explicitly
require the same safeguards for
commercial time-and-materials services,
i.e., the FAR part 12 determination and
findings and the justification for
changes to the ceiling price, that are
required in FAR 12.207; and
• Provide guidance to contracting
officials on the requirements in FAR
12.207 for the detailed determination
and findings for time-and-materials or
labor-hour contracts for commercial
services and encourage agencies to
provide training regarding the
determination and findings
requirement.
The requirement for executing a
determination and findings when
acquiring commercial services on a
time-and-material or labor-hour basis is
not new. The FAR used to prohibit the
use of any other contract type except
fixed price for the acquisition of
commercial items. However, in 2003,
the Services Acquisition Reform Act
(SARA), amended Section 8002(d) of
Federal Acquisition Streamlining Act of
1994 (FASA) to explicitly provide that
the FAR shall include the authority for
the use of time-and-materials and laborhour contracts for the procurement of
VerDate Mar<15>2010
16:48 Sep 24, 2010
Jkt 220001
certain commercial services (the
commercial services in such a category
are ‘‘of a type’’ of commercial services
that are commonly sold to the general
public through the use of time-andmaterials and labor-hour contracts).
FAR Case 2003–027 was published in
the Federal Register at 71 FR 74667 on
December 12, 2006, modified FAR
12.207, FAR 16.601, and FAR 52.212–4
to include an Alternate I, to permit the
use of time-and-materials and laborhour contracts for commercial services
when no other contract type is suitable.
When using a time-and-materials or
labor-hour contract, a ceiling price must
be included in time-and-material and
labor-hour contracts, it must incorporate
Alternate I to payment clause FAR
52.212–4 to safeguard records and audit
rights, provide insight into contractor
costs, and ensure that costs are
monitored by the Government due to
the inherent risks associated with timeand-materials and labor-hour types of
contracts. This FAR case proposes to
modify FAR 8.405–2 and 12.207 to
require the contracting officer, when
acquiring commercial services using a
time-and-materials or labor-hour order,
to execute a determination and findings
explaining why no other contract type is
suitable for the acquisition; and FAR
16.201 and 16.600 to state explicitly that
time-and-materials/labor-hour contracts
are not fixed price contracts. The
determination and findings is required
to contain several elements, including a
description of the market research
performed for the acquisition and a
description of the actions planned to
maximize the use of fixed-price
contracts on future or follow-on
acquisitions. This is similar to the
requirements in FAR 12.207 for a timeand-materials/labor-hour contract for
commercial services. Currently, neither
FAR 12.207 nor FAR subpart 8.4
explicitly mentions the requirement for
the contracting officer to execute a
determination and findings when
placing orders against Schedules under
FAR subpart 8.4. GSA establishes
contracts for commercial supplies and
services against which Government
agencies can issue orders.
This proposed rule therefore builds
on the existing Services Acquisition
Reform Act (SARA) Panel
recommendation to permit the use of
time-and-materials and labor-hour
contracts or orders when acquiring
commercial services as long as a
determination and findings is executed
by the contracting officer consistent
with FAR 12.207 and FAR 16.601 when
ordering services under Schedules.
Therefore, the determination and
PO 00000
Frm 00039
Fmt 4702
Sfmt 4702
findings requirement is proposed to be
added to FAR subpart 8.4 for Schedule
orders to make it clear that contracting
officers must execute, prior to placing
the order, a determination and findings
that a fixed-price order is not suitable.
The FAR is proposed to be further
revised as follows:
(1) At FAR 8.405–2, Ordering
procedures for services requiring a
statement of work, paragraph (e), Use of
time-and-materials and labor-hour
orders for services, is added to
incorporate the requirement for a
determination and findings consistent
with FAR 12.207 and 16.601(d).
(2) Section 12.207(b)(4) is added as a
cross-reference to 8.405–2(e) for
determination and findings when using
Federal Supply Schedules.
(3) Section 16.201, which sets forth
the general description of a fixed-price
contract, has been modified to clarify
that time-and-materials and labor-hour
contracts are not fixed-price contracts.
(4) Section 16.600, which sets forth
the scope of time-and-materials and
labor-hour contracts, is added to clarify
that time-and-materials and labor-hour
contracts are not fixed price contracts.
This is not a significant regulatory
action and, therefore, was not subject to
review under Section 6(b) of Executive
Order 12866, Regulatory Planning and
Review, dated September 30, 1993. This
rule is not a major rule under 5 U.S.C.
804.
B. Regulatory Flexibility Act
The Councils do not expect this
proposed rule to have a significant
economic impact on a substantial
number of small entities within the
meaning of the Regulatory Flexibility
Act, 5 U.S.C. 601, et seq., because the
rule does not impose any additional
requirements on small businesses. An
Initial Regulatory Flexibility Analysis
has, therefore, not been performed. We
invite comments from small businesses
and other interested parties. The
Councils will consider comments from
small entities concerning the affected
FAR Parts 8, 12, and 16 in accordance
with 5 U.S.C. 610. Interested parties
must submit such comments separately
and should cite 5 U.S.C. 601, et seq.
(FAR case 2009–043), in
correspondence.
C. Paperwork Reduction Act
The Paperwork Reduction Act does
not apply because the proposed changes
to the FAR do not impose information
collection requirements that require the
approval of the Office of Management
and Budget under 44 U.S.C. Chapter 35,
et seq.
E:\FR\FM\27SEP1.SGM
27SEP1
Federal Register / Vol. 75, No. 186 / Monday, September 27, 2010 / Proposed Rules
List of Subjects in 48 CFR Parts 8, 12,
and 16
Government procurement.
Dated: September 20, 2010.
Edward Loeb,
Director, Acquisition Policy Division.
Therefore, DoD, GSA, and NASA
propose amending 48 CFR parts 8, 12,
and 16 as set forth below:
1. The authority citation for 48 CFR
parts 8, 12, and 16 continues to read as
follows:
Authority: 40 U.S.C. 121(c); 10 U.S.C.
chapter 137; and 42 U.S.C. 2473(c).
PART 8—REQUIRED SOURCES OF
SUPPLIES AND SERVICES
2. Amend section 8.405–2 by
redesignating paragraph (e) as paragraph
(f); and adding a new paragraph (e) to
read as follows:
8.405–2 Ordering procedures for services
requiring a statement of work.
emcdonald on DSK2BSOYB1PROD with PROPOSALS
*
*
*
*
*
(e) Use of time-and-materials and
labor-hour orders for services. (1) Except
as provided in paragraph (e)(2) of this
section, agencies shall use fixed-price
orders for the acquisition of commercial
services to the maximum extent
practicable.
(2) A time-and-materials or labor-hour
order may be used for the acquisition of
commercial services only when—
(i) It is not possible at the time of
placing the order to estimate accurately
the extent or duration of the work or to
anticipate costs with any reasonable
degree of confidence; and
(ii) The agency acquires the services
through a competitive procedure under
paragraph (c).
(3) Prior to the issuance of a time-andmaterials or labor-hour order, the
contracting officer shall—
(i) Execute a determination and
findings (D&F) for the order, in
accordance with paragraph (e)(4) of this
section that a fixed price order is not
suitable;
(ii) Include a ceiling price in the order
that the contractor exceeds at its own
risk; and
(iii) Authorize any subsequent change
in the order ceiling price only upon a
determination, documented in the order
file, that it is in the best interest of the
procuring agency to change the ceiling
price, and the change does not affect the
scope of the task order as awarded (see
12.207(b)(1)(ii)).
(4) The D&F required by paragraph
(e)(3) of this section shall contain
sufficient facts and rationale to justify
that a fixed-price order is not suitable.
At a minimum, the D&F shall—
VerDate Mar<15>2010
16:48 Sep 24, 2010
Jkt 220001
(i) Include a description of the market
research conducted (see 8.404(c),
Acquisition planning, and 10.002(e));
(ii) Establish that it is not possible at
the time of placing the order to
accurately estimate the extent or
duration of the work or anticipate costs
with any reasonable degree of certainty;
(iii) Establish that the current
requirement has been structured to
maximize the use of fixed-price orders
(e.g., by limiting the value or length of
the time-and-materials/labor-hour order;
establishing fixed prices for portions of
the requirement) on future acquisitions
for the same or similar requirements;
and
(iv) Describe actions to maximize the
use of fixed-price orders on future
acquisitions for the same requirements
(see 12.207(b)(2)).
(5) Additional approval is required for
orders with a total performance period,
including options, of more than three
years:
(i) The D&F prepared in accordance
with paragraph (e)(3) of this section
shall be signed by the contracting officer
and approved by the head of the
contracting activity prior to the
execution of the base period; and
(ii) The order shall include a ceiling
price that the contractor exceeds at its
own risk. The contracting officer shall
document the order file to justify the
reasons for and amount of any
subsequent change in the ceiling price.
*
*
*
*
*
PART 12—ACQUISITION OF
COMMERCIAL ITEMS
12.207
Contract type.
*
*
*
*
*
(b) * * *
(4) See 8.405–2(e) for requirement for
determination and findings when using
Federal Supply Schedules.
*
*
*
*
*
PART 16—TYPES OF CONTRACTS
4. Revise section 16.201 to read as
follows:
16.201
General.
(a) Fixed-price types of contracts
provide for a firm price or, in
appropriate cases, an adjustable price.
Fixed-price contracts providing for an
adjustable price may include a ceiling
price, a target price (including target
cost), or both. Unless otherwise
specified in the contract, the ceiling
price or target price is subject to
adjustment only by operation of contract
clauses providing for equitable
PO 00000
Frm 00040
Fmt 4702
Sfmt 4702
adjustment or other revision of the
contract price under stated
circumstances. The contracting officer
shall use firm-fixed-price or fixed-price
with economic price adjustment
contracts when acquiring commercial
items.
(b) Time-and-materials contracts and
labor-hour contracts are not fixed-price
contracts.
5. Add section 16.600 to read as
follows:
16.600
Scope.
Time-and-materials contracts and
labor-hour contracts are not fixed-price
contracts.
[FR Doc. 2010–24104 Filed 9–24–10; 8:45 am]
BILLING CODE 6820–EP–P
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials
Safety Administration
49 CFR Part 177
[Docket No. PHMSA–2010–0221 (HM–256)]
RIN 2137–AE63
Hazardous Materials: Limiting the Use
of Electronic Devices by Highway
Pipeline and Hazardous
Materials Safety Administration
(PHMSA), DOT.
ACTION: Notice of proposed rulemaking
(NPRM).
AGENCY:
The Pipeline and Hazardous
Materials Safety Administration
(PHMSA) proposes to prohibit texting
on electronic devices by drivers during
the operation of a motor vehicle
containing a quantity of hazardous
materials requiring placarding under
part 172 of the 49 CFR or any quantity
of a select agent or toxin listed in 42
CFR part 73. Additionally, in
accordance with requirements
published today by the Federal Motor
Carrier Safety Administration (FMCSA),
motor carriers are prohibited from
requiring or allowing drivers of covered
motor vehicles to engage in texting
while driving. This rulemaking would
improve health and safety on the
Nation’s highways by reducing the
prevalence of distracted driving-related
crashes, fatalities, and injuries involving
drivers of commercial motor vehicles.
DATES: Comments must be received by
October 27, 2010.
ADDRESSES: You may submit comments
identified by the docket number
PHMSA–2010–0221 by any of the
following methods:
SUMMARY:
3. Amend section 12.207 by adding
paragraph (b)(4) to read as follows:
59197
E:\FR\FM\27SEP1.SGM
27SEP1
Agencies
[Federal Register Volume 75, Number 186 (Monday, September 27, 2010)]
[Proposed Rules]
[Pages 59195-59197]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-24104]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Parts 8, 12, and 16
[FAR Case 2009-043; Docket 2010-0100; Sequence 1]
RIN: 9000-AL74
Federal Acquisition Regulation; Time-and-Materials (T&M) and
Labor-Hour (LH) Contracts for Commercial Items
AGENCY: Department of Defense (DoD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: The Civilian Agency Acquisition Council and the Defense
Acquisition Regulations Council (the Councils) are proposing to amend
the Federal Acquisition Regulation (FAR) to implement recommendations
of the Government Accountability Office (GAO) Report 09-579 dated June
2009 to Congressional Committees on ``Minimal Compliance with New
Safeguards for Time-and-Materials Contracts for Commercial Services and
Safeguards Have Not Been Applied to GSA Schedules Program.''
DATES: Interested parties should submit written comments to the
Regulatory Secretariat on or before November 26, 2010 to be considered
in the formulation of a final rule.
ADDRESSES: Submit comments identified by FAR Case 2009-043 by any of
the following methods:
Regulations.gov: https://www.regulations.gov. Submit
comments via the Federal eRulemaking portal by inputting ``FAR Case
2009-043'' under the heading ``Enter Keyword or ID'' and selecting
``Search''. Select the link ``Submit a Comment'' that corresponds with
``FAR Case 2009-043''. Follow the instructions provided at the ``Submit
a Comment'' screen. Please include your name, company name (if any),
and ``FAR Case 2009-043'' on your attached document.
Fax: 202-501-4067.
Mail: General Services Administration, Regulatory
Secretariat (MVCB), Attn: Hada Flowers, 1800 F Street, NW., Room 4041,
Washington, DC 20405.
Instructions: Please submit comments only and cite FAR Case 2009-
043, in all correspondence related to this case. All comments received
will be posted without change to https://www.regulations.gov, including
any personal and/or business confidential information provided.
FOR FURTHER INFORMATION CONTACT: Mr. Warren Blankenship, Procurement
Analyst, at (202) 501-1900, for clarification of content. For
information pertaining to status or publication schedules, contact the
Regulatory Secretariat at (202) 501-4755. Please cite FAR case 2009-
043.
SUPPLEMENTARY INFORMATION:
A. Background
This rule proposes to amend the FAR to implement the
recommendations of GAO's Report to Congressional Committees 09-579
dated June 2009 on ``Minimal Compliance with New Safeguards for Time-
and-Materials Contracts for Commercial Services and Safeguards Have Not
Been Applied to the GSA Schedules Program.'' GAO was directed by the
National Defense Authorization Act of Fiscal Year 2004 conference
report to review the use of the new authority being authorized in
section 1432 of the Act, the extent to which it had been used, the
types of contracts for which the authority had been used, and the
degree to which such use was in compliance with the safeguards included
in section 1432 (including the requirement that time-and-material and
labor-hour contracts be used only where no other contract type was
suitable).
GAO reviewed contract files, interviewed contracting and
procurement policy officials, and utilized legal interpretations of the
applicability of the determination and findings (D&F) requirement to
the GSA Schedules program. GAO believes that the evidence and findings
obtained during its audit substantiates the conclusions and associated
recommendations in the report. The
[[Page 59196]]
GAO audit revealed that, Governmentwide, contracting officers had the
mistaken impression that the fixed labor rates in the time-and-
material/labor-hour contracts make them fixed price type contracts. The
audit further revealed that there was a general lack of awareness of
the FAR part 12 determinations and findings requirement among
contracting officers across all Government agencies in their review of
contract actions more than two (2) years after the determinations and
findings requirement was implemented in the FAR. There was a failure of
management to detect the lack of compliance with these safeguards. GAO
recommended that further action was required for the use of time-and-
material contracts to acquire commercial services in order to help
ensure that this contract type is used only when no other contract type
is suitable and instill discipline in the determination of contract
type with a view toward managing the risk to the Government. Therefore,
GAO recommended that the following steps be taken:
Amend FAR Subpart 16.6 (Time-and-Materials, Labor-Hour,
and Letter Contracts) and FAR Subpart 16.2 (Fixed-Price Contracts) to
make it clear that contracts with a fixed hourly labor rate and an
estimated ceiling price are time-and-materials or labor-hour contracts,
not fixed-price type contracts;
Amend FAR Subpart 8.4 (pertaining to the Schedules
program) to explicitly require the same safeguards for commercial time-
and-materials services, i.e., the FAR part 12 determination and
findings and the justification for changes to the ceiling price, that
are required in FAR 12.207; and
Provide guidance to contracting officials on the
requirements in FAR 12.207 for the detailed determination and findings
for time-and-materials or labor-hour contracts for commercial services
and encourage agencies to provide training regarding the determination
and findings requirement.
The requirement for executing a determination and findings when
acquiring commercial services on a time-and-material or labor-hour
basis is not new. The FAR used to prohibit the use of any other
contract type except fixed price for the acquisition of commercial
items. However, in 2003, the Services Acquisition Reform Act (SARA),
amended Section 8002(d) of Federal Acquisition Streamlining Act of 1994
(FASA) to explicitly provide that the FAR shall include the authority
for the use of time-and-materials and labor-hour contracts for the
procurement of certain commercial services (the commercial services in
such a category are ``of a type'' of commercial services that are
commonly sold to the general public through the use of time-and-
materials and labor-hour contracts). FAR Case 2003-027 was published in
the Federal Register at 71 FR 74667 on December 12, 2006, modified FAR
12.207, FAR 16.601, and FAR 52.212-4 to include an Alternate I, to
permit the use of time-and-materials and labor-hour contracts for
commercial services when no other contract type is suitable. When using
a time-and-materials or labor-hour contract, a ceiling price must be
included in time-and-material and labor-hour contracts, it must
incorporate Alternate I to payment clause FAR 52.212-4 to safeguard
records and audit rights, provide insight into contractor costs, and
ensure that costs are monitored by the Government due to the inherent
risks associated with time-and-materials and labor-hour types of
contracts. This FAR case proposes to modify FAR 8.405-2 and 12.207 to
require the contracting officer, when acquiring commercial services
using a time-and-materials or labor-hour order, to execute a
determination and findings explaining why no other contract type is
suitable for the acquisition; and FAR 16.201 and 16.600 to state
explicitly that time-and-materials/labor-hour contracts are not fixed
price contracts. The determination and findings is required to contain
several elements, including a description of the market research
performed for the acquisition and a description of the actions planned
to maximize the use of fixed-price contracts on future or follow-on
acquisitions. This is similar to the requirements in FAR 12.207 for a
time-and-materials/labor-hour contract for commercial services.
Currently, neither FAR 12.207 nor FAR subpart 8.4 explicitly mentions
the requirement for the contracting officer to execute a determination
and findings when placing orders against Schedules under FAR subpart
8.4. GSA establishes contracts for commercial supplies and services
against which Government agencies can issue orders.
This proposed rule therefore builds on the existing Services
Acquisition Reform Act (SARA) Panel recommendation to permit the use of
time-and-materials and labor-hour contracts or orders when acquiring
commercial services as long as a determination and findings is executed
by the contracting officer consistent with FAR 12.207 and FAR 16.601
when ordering services under Schedules. Therefore, the determination
and findings requirement is proposed to be added to FAR subpart 8.4 for
Schedule orders to make it clear that contracting officers must
execute, prior to placing the order, a determination and findings that
a fixed-price order is not suitable. The FAR is proposed to be further
revised as follows:
(1) At FAR 8.405-2, Ordering procedures for services requiring a
statement of work, paragraph (e), Use of time-and-materials and labor-
hour orders for services, is added to incorporate the requirement for a
determination and findings consistent with FAR 12.207 and 16.601(d).
(2) Section 12.207(b)(4) is added as a cross-reference to 8.405-
2(e) for determination and findings when using Federal Supply
Schedules.
(3) Section 16.201, which sets forth the general description of a
fixed-price contract, has been modified to clarify that time-and-
materials and labor-hour contracts are not fixed-price contracts.
(4) Section 16.600, which sets forth the scope of time-and-
materials and labor-hour contracts, is added to clarify that time-and-
materials and labor-hour contracts are not fixed price contracts. This
is not a significant regulatory action and, therefore, was not subject
to review under Section 6(b) of Executive Order 12866, Regulatory
Planning and Review, dated September 30, 1993. This rule is not a major
rule under 5 U.S.C. 804.
B. Regulatory Flexibility Act
The Councils do not expect this proposed rule to have a significant
economic impact on a substantial number of small entities within the
meaning of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq.,
because the rule does not impose any additional requirements on small
businesses. An Initial Regulatory Flexibility Analysis has, therefore,
not been performed. We invite comments from small businesses and other
interested parties. The Councils will consider comments from small
entities concerning the affected FAR Parts 8, 12, and 16 in accordance
with 5 U.S.C. 610. Interested parties must submit such comments
separately and should cite 5 U.S.C. 601, et seq. (FAR case 2009-043),
in correspondence.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply because the proposed
changes to the FAR do not impose information collection requirements
that require the approval of the Office of Management and Budget under
44 U.S.C. Chapter 35, et seq.
[[Page 59197]]
List of Subjects in 48 CFR Parts 8, 12, and 16
Government procurement.
Dated: September 20, 2010.
Edward Loeb,
Director, Acquisition Policy Division.
Therefore, DoD, GSA, and NASA propose amending 48 CFR parts 8, 12,
and 16 as set forth below:
1. The authority citation for 48 CFR parts 8, 12, and 16 continues
to read as follows:
Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42
U.S.C. 2473(c).
PART 8--REQUIRED SOURCES OF SUPPLIES AND SERVICES
2. Amend section 8.405-2 by redesignating paragraph (e) as
paragraph (f); and adding a new paragraph (e) to read as follows:
8.405-2 Ordering procedures for services requiring a statement of
work.
* * * * *
(e) Use of time-and-materials and labor-hour orders for services.
(1) Except as provided in paragraph (e)(2) of this section, agencies
shall use fixed-price orders for the acquisition of commercial services
to the maximum extent practicable.
(2) A time-and-materials or labor-hour order may be used for the
acquisition of commercial services only when--
(i) It is not possible at the time of placing the order to estimate
accurately the extent or duration of the work or to anticipate costs
with any reasonable degree of confidence; and
(ii) The agency acquires the services through a competitive
procedure under paragraph (c).
(3) Prior to the issuance of a time-and-materials or labor-hour
order, the contracting officer shall--
(i) Execute a determination and findings (D&F) for the order, in
accordance with paragraph (e)(4) of this section that a fixed price
order is not suitable;
(ii) Include a ceiling price in the order that the contractor
exceeds at its own risk; and
(iii) Authorize any subsequent change in the order ceiling price
only upon a determination, documented in the order file, that it is in
the best interest of the procuring agency to change the ceiling price,
and the change does not affect the scope of the task order as awarded
(see 12.207(b)(1)(ii)).
(4) The D&F required by paragraph (e)(3) of this section shall
contain sufficient facts and rationale to justify that a fixed-price
order is not suitable. At a minimum, the D&F shall--
(i) Include a description of the market research conducted (see
8.404(c), Acquisition planning, and 10.002(e));
(ii) Establish that it is not possible at the time of placing the
order to accurately estimate the extent or duration of the work or
anticipate costs with any reasonable degree of certainty;
(iii) Establish that the current requirement has been structured to
maximize the use of fixed-price orders (e.g., by limiting the value or
length of the time-and-materials/labor-hour order; establishing fixed
prices for portions of the requirement) on future acquisitions for the
same or similar requirements; and
(iv) Describe actions to maximize the use of fixed-price orders on
future acquisitions for the same requirements (see 12.207(b)(2)).
(5) Additional approval is required for orders with a total
performance period, including options, of more than three years:
(i) The D&F prepared in accordance with paragraph (e)(3) of this
section shall be signed by the contracting officer and approved by the
head of the contracting activity prior to the execution of the base
period; and
(ii) The order shall include a ceiling price that the contractor
exceeds at its own risk. The contracting officer shall document the
order file to justify the reasons for and amount of any subsequent
change in the ceiling price.
* * * * *
PART 12--ACQUISITION OF COMMERCIAL ITEMS
3. Amend section 12.207 by adding paragraph (b)(4) to read as
follows:
12.207 Contract type.
* * * * *
(b) * * *
(4) See 8.405-2(e) for requirement for determination and findings
when using Federal Supply Schedules.
* * * * *
PART 16--TYPES OF CONTRACTS
4. Revise section 16.201 to read as follows:
16.201 General.
(a) Fixed-price types of contracts provide for a firm price or, in
appropriate cases, an adjustable price. Fixed-price contracts providing
for an adjustable price may include a ceiling price, a target price
(including target cost), or both. Unless otherwise specified in the
contract, the ceiling price or target price is subject to adjustment
only by operation of contract clauses providing for equitable
adjustment or other revision of the contract price under stated
circumstances. The contracting officer shall use firm-fixed-price or
fixed-price with economic price adjustment contracts when acquiring
commercial items.
(b) Time-and-materials contracts and labor-hour contracts are not
fixed-price contracts.
5. Add section 16.600 to read as follows:
16.600 Scope.
Time-and-materials contracts and labor-hour contracts are not
fixed-price contracts.
[FR Doc. 2010-24104 Filed 9-24-10; 8:45 am]
BILLING CODE 6820-EP-P