Application To Export Electric Energy; Rainbow Energy Marketing Corporation, 57912 [2010-23798]
Download as PDF
57912
Federal Register / Vol. 75, No. 184 / Thursday, September 23, 2010 / Notices
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the GSEMNA
application to export electric energy to
Canada should be clearly marked with
Docket No. EA–372. Additional copies
are to be filed directly with Ray
Cunningham, GDF SUEZ Energy
Marketing NA, Inc., 1990 Post Oak
Blvd., Suite 1900, Houston, TX 77056
and Catherine P. McCarthy, Dewey &
LeBoeuf LLP, 1101 New York Ave.,
NW., Washington, DC 20005. A final
decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after a determination is
made by DOE that the proposed action
will not adversely impact on the
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by e-mailing
Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on September
17, 2010.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2010–23795 Filed 9–22–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–375]
Application To Export Electric Energy;
Rainbow Energy Marketing
Corporation
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
Rainbow Energy Marketing
Corporation (Rainbow) has applied for
authority to transmit electric energy
from the United States to Mexico
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before October 25, 2010.
srobinson on DSKHWCL6B1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:52 Sep 22, 2010
Jkt 220001
Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence (Program Office)
202–586–5260 or Michael Skinker
(Program Attorney) 202–586–2793.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C. 824a(e)).
On September 16, 2010, DOE received
an application from Rainbow for
authority to transmit electric energy
from the United States to Mexico for
five years as a power marketer using
existing international transmission
facilities. Rainbow does not own any
electric transmission facilities nor does
it hold a franchised service area.
The electric energy that Rainbow
proposes to export to Mexico would be
surplus energy purchased from electric
utilities, Federal power marketing
agencies and other entities within the
United States. The existing international
transmission facilities to be utilized by
Rainbow have previously been
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the Rainbow
application to export electric energy to
Mexico should be clearly marked with
Docket No. EA–375. Additional copies
are to be filed directly with Joseph M.
Wolfe, Rainbow Energy Marketing
Corporation, Kirkwood Office tower,
919 South 7th Street, Suite 405,
Bismarck, ND 58504. A final decision
will be made on this application after
the environmental impacts have been
ADDRESSES:
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
evaluated pursuant to the National
Environmental Policy Act of 1969, and
a determination is made by DOE that the
proposed action will not adversely
impact on the reliability of the U.S.
electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by e-mailing
Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on September
17, 2010.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2010–23798 Filed 9–22–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Boulder Canyon Project-Rate Order
No. WAPA–150
Western Area Power
Administration, DOE.
ACTION: Notice of Extension of Existing
Rate-setting Formula and Approval of
FY 2011 Base Charge and Rates.
AGENCY:
The Deputy Secretary of
Energy confirmed and approved Rate
Order No. WAPA–150 and Rate
Schedule BCP–F8 extending on an
interim basis the existing Boulder
Canyon Project (BCP) rate-setting
formula and approving the base charge
and rates for FY 2011. The existing
Electric Service Rate Schedule, BCP–F7,
expires September 30, 2010. The
Electric Service Rate Schedule contains
a rate-setting formula that is
recalculated annually based on updated
financial and load data. The existing
rate-setting formula is being extended
under Rate Order No. WAPA–150 and
Rate Schedule BCP–F8.
DATES: Rate Schedule BCP–F8 will be
placed into effect on an interim basis on
the first day of the first full billing
period beginning on October 1, 2010,
and will be in effect until the Federal
Energy Regulatory Commission (FERC)
confirms, approves, and places the rate
schedule in effect on a final basis up to
September 30, 2015, or until the rate
schedule is superseded.
FOR FURTHER INFORMATION CONTACT: Mr.
Jack Murray, Rates Manager, Desert
Southwest Customer Service Region,
Western Area Power Administration,
P.O. Box 6457, Phoenix, AZ 85005–
SUMMARY:
E:\FR\FM\23SEN1.SGM
23SEN1
Agencies
[Federal Register Volume 75, Number 184 (Thursday, September 23, 2010)]
[Notices]
[Page 57912]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-23798]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-375]
Application To Export Electric Energy; Rainbow Energy Marketing
Corporation
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Rainbow Energy Marketing Corporation (Rainbow) has applied for
authority to transmit electric energy from the United States to Mexico
pursuant to section 202(e) of the Federal Power Act.
DATES: Comments, protests, or requests to intervene must be submitted
on or before October 25, 2010.
ADDRESSES: Comments, protests, or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-8008).
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office)
202-586-5260 or Michael Skinker (Program Attorney) 202-586-2793.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).
On September 16, 2010, DOE received an application from Rainbow for
authority to transmit electric energy from the United States to Mexico
for five years as a power marketer using existing international
transmission facilities. Rainbow does not own any electric transmission
facilities nor does it hold a franchised service area.
The electric energy that Rainbow proposes to export to Mexico would
be surplus energy purchased from electric utilities, Federal power
marketing agencies and other entities within the United States. The
existing international transmission facilities to be utilized by
Rainbow have previously been authorized by Presidential permits issued
pursuant to Executive Order 10485, as amended, and are appropriate for
open access transmission by third parties.
Procedural Matters: Any person desiring to become a party to these
proceedings or to be heard by filing comments or protests to this
application should file a petition to intervene, comment, or protest at
the address provided above in accordance with Sec. Sec. 385.211 or
385.214 of the Federal Energy Regulatory Commission's Rules of Practice
and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each
petition and protest should be filed with DOE on or before the date
listed above.
Comments on the Rainbow application to export electric energy to
Mexico should be clearly marked with Docket No. EA-375. Additional
copies are to be filed directly with Joseph M. Wolfe, Rainbow Energy
Marketing Corporation, Kirkwood Office tower, 919 South 7th Street,
Suite 405, Bismarck, ND 58504. A final decision will be made on this
application after the environmental impacts have been evaluated
pursuant to the National Environmental Policy Act of 1969, and a
determination is made by DOE that the proposed action will not
adversely impact on the reliability of the U.S. electric power supply
system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://www.oe.energy.gov/permits_pending.htm, or by e-mailing Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on September 17, 2010.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2010-23798 Filed 9-22-10; 8:45 am]
BILLING CODE 6450-01-P