North American Electric Reliability Corporation; Notice of Filing September 14, 2010., 57761 [2010-23601]
Download as PDF
emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 75, No. 183 / Wednesday, September 22, 2010 / Notices
Applicants: Portland Natural Gas
Transmission System.
Description: Portland Natural Gas
Transmission System submits Second
Revised Sheet 323 et al., of its FERC Gas
Tariff, Second Revised Volume 1
effective 11/1/10.
Filed Date: 09/15/2010.
Accession Number: 20100915–0204.
Comment Date: 5 p.m. Eastern Time
on Monday, September 27, 2010.
Docket Numbers: RP10–1303–000.
Applicants: Viking Gas Transmission
Company.
Description: Viking Gas Transmission
Company submits tariff filing per
154.203: Non Conforming Agreement
Amendments to be effective 11/1/2010.
Filed Date: 09/15/2010.
Accession Number: 20100915–5185.
Comment Date: 5 p.m. Eastern Time
on Monday, September 27, 2010.
Docket Numbers: RP10–1304–000.
Applicants: Gulf States Transmission
Corporation.
Description: Gulf States Transmission
Corporation submits tariff filing per
154.203: Gulf States Transmission
Corporation Baseline Tariff Filing to be
effective 9/15/2010.
Filed Date: 09/15/2010.
Accession Number: 20100915–5205.
Comment Date: 5 p.m. Eastern Time
on Monday, September 27, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
VerDate Mar<15>2010
17:32 Sep 21, 2010
Jkt 220001
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–23621 Filed 9–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
57761
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 30, 2010.
Kimberly D. Bose,
Secretary.
[Docket No. RM06–22–014]
North American Electric Reliability
Corporation; Notice of Filing
September 14, 2010.
[FR Doc. 2010–23601 Filed 9–21–10; 8:45 am]
Take notice that on September 9,
2010, the North American Electric
Reliability Corporation (NERC)
submitted its compliance filing and
request for approval of implementation
plans for Generator Owners and
Generator Operators of nuclear power
plants in the United States for Versions
2 and 3 of the Critical Infrastructure
Protection Reliability Standards,
designated as CIP–002–2 through CIP–
009–002 and CIP–002–3 through CIP–
009–003 respectively, in compliance
with the Commission’s March 18, 2010
Order, Order Addressing Compliance
Filing and Approving Implementation
Plans, 130 FERC ¶ 61,185 (2010) (March
18 Order).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
DEPARTMENT OF ENERGY
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. EL10–54–000]
Desert Southwest Power, LLC; Notice
of Filing
September 14, 2010.
Take notice that on September 10,
2010, Desert Southwest Power, LLC
(Desert Southwest) filed responses to
the Federal Energy Regulatory
Commission’s (Commission) request for
additional information contained in the
Commission’s July 28, 2010 letter
regarding Desert Southwest’s petition
for declaratory order requesting
incentive rate treatment for its proposed
transmission project filed on March 30,
2010.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
E:\FR\FM\22SEN1.SGM
22SEN1
Agencies
[Federal Register Volume 75, Number 183 (Wednesday, September 22, 2010)]
[Notices]
[Page 57761]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-23601]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RM06-22-014]
North American Electric Reliability Corporation; Notice of Filing
September 14, 2010.
Take notice that on September 9, 2010, the North American Electric
Reliability Corporation (NERC) submitted its compliance filing and
request for approval of implementation plans for Generator Owners and
Generator Operators of nuclear power plants in the United States for
Versions 2 and 3 of the Critical Infrastructure Protection Reliability
Standards, designated as CIP-002-2 through CIP-009-002 and CIP-002-3
through CIP-009-003 respectively, in compliance with the Commission's
March 18, 2010 Order, Order Addressing Compliance Filing and Approving
Implementation Plans, 130 FERC ] 61,185 (2010) (March 18 Order).
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on September 30, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-23601 Filed 9-21-10; 8:45 am]