North American Electric Reliability Corporation; Notice of Filing September 14, 2010., 57761 [2010-23601]

Download as PDF emcdonald on DSK2BSOYB1PROD with NOTICES Federal Register / Vol. 75, No. 183 / Wednesday, September 22, 2010 / Notices Applicants: Portland Natural Gas Transmission System. Description: Portland Natural Gas Transmission System submits Second Revised Sheet 323 et al., of its FERC Gas Tariff, Second Revised Volume 1 effective 11/1/10. Filed Date: 09/15/2010. Accession Number: 20100915–0204. Comment Date: 5 p.m. Eastern Time on Monday, September 27, 2010. Docket Numbers: RP10–1303–000. Applicants: Viking Gas Transmission Company. Description: Viking Gas Transmission Company submits tariff filing per 154.203: Non Conforming Agreement Amendments to be effective 11/1/2010. Filed Date: 09/15/2010. Accession Number: 20100915–5185. Comment Date: 5 p.m. Eastern Time on Monday, September 27, 2010. Docket Numbers: RP10–1304–000. Applicants: Gulf States Transmission Corporation. Description: Gulf States Transmission Corporation submits tariff filing per 154.203: Gulf States Transmission Corporation Baseline Tariff Filing to be effective 9/15/2010. Filed Date: 09/15/2010. Accession Number: 20100915–5205. Comment Date: 5 p.m. Eastern Time on Monday, September 27, 2010. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling VerDate Mar<15>2010 17:32 Sep 21, 2010 Jkt 220001 link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010–23621 Filed 9–21–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 57761 intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 30, 2010. Kimberly D. Bose, Secretary. [Docket No. RM06–22–014] North American Electric Reliability Corporation; Notice of Filing September 14, 2010. [FR Doc. 2010–23601 Filed 9–21–10; 8:45 am] Take notice that on September 9, 2010, the North American Electric Reliability Corporation (NERC) submitted its compliance filing and request for approval of implementation plans for Generator Owners and Generator Operators of nuclear power plants in the United States for Versions 2 and 3 of the Critical Infrastructure Protection Reliability Standards, designated as CIP–002–2 through CIP– 009–002 and CIP–002–3 through CIP– 009–003 respectively, in compliance with the Commission’s March 18, 2010 Order, Order Addressing Compliance Filing and Approving Implementation Plans, 130 FERC ¶ 61,185 (2010) (March 18 Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of DEPARTMENT OF ENERGY PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket No. EL10–54–000] Desert Southwest Power, LLC; Notice of Filing September 14, 2010. Take notice that on September 10, 2010, Desert Southwest Power, LLC (Desert Southwest) filed responses to the Federal Energy Regulatory Commission’s (Commission) request for additional information contained in the Commission’s July 28, 2010 letter regarding Desert Southwest’s petition for declaratory order requesting incentive rate treatment for its proposed transmission project filed on March 30, 2010. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 75, Number 183 (Wednesday, September 22, 2010)]
[Notices]
[Page 57761]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-23601]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RM06-22-014]


North American Electric Reliability Corporation; Notice of Filing 
September 14, 2010.

    Take notice that on September 9, 2010, the North American Electric 
Reliability Corporation (NERC) submitted its compliance filing and 
request for approval of implementation plans for Generator Owners and 
Generator Operators of nuclear power plants in the United States for 
Versions 2 and 3 of the Critical Infrastructure Protection Reliability 
Standards, designated as CIP-002-2 through CIP-009-002 and CIP-002-3 
through CIP-009-003 respectively, in compliance with the Commission's 
March 18, 2010 Order, Order Addressing Compliance Filing and Approving 
Implementation Plans, 130 FERC ] 61,185 (2010) (March 18 Order).
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on September 30, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-23601 Filed 9-21-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.