Lockhart Power Company; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 57746-57747 [2010-23599]
Download as PDF
57746
Federal Register / Vol. 75, No. 183 / Wednesday, September 22, 2010 / Notices
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–23681 Filed 9–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Energy Regulatory
Commission
Lockhart Power Company; Notice of
Application Tendered for Filing With
the Commission, Soliciting Additional
Study Requests, and Establishing
Procedural Schedule for Relicensing
and a Deadline for Submission of Final
Amendments
September 14, 2010.
Take notice that the following
hydroelectric application has been filed
VerDate Mar<15>2010
17:32 Sep 21, 2010
Jkt 220001
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 13590–001.
c. Date Filed: August 31, 2010.
d. Applicant: Lockhart Power
Company.
e. Name of Project: Riverdale
Hydroelectric Project.
f. Location: On the Enoree River in
Spartanburg and Laurens counties,
South Carolina. The project does not
affect federal lands.
g. Filed Pursuant to: Federal Power
Act 16 USC 791 (a)-825(r).
h. Applicant Contact: Bryan D. Stone,
Chief Operating Officer, Lockhart Power
Company, Inc., 420 River Street, P.O.
Box 10, Lockhart, SC 29364, (864) 545–
2211.
i. FERC Contact: Sarah Florentino,
(202) 502–6863 or via e-mail at
Sarah.Florentino@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: November 1, 2010.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
m. This application is not ready for
environmental analysis at this time.
n. The existing, currently nonoperational Riverdale Project consists
of: (1) A 12-foot high, 425-foot-long
concrete gravity dam with 2-foot
flashboards; (2) a 9-acre impoundment;
(3) a headrace leading to a 110-foot-long
steel penstock; (4) a powerhouse
containing a single 1.45-megawatt
turbine-generator unit; (5) a 1400-footlong tailrace channel; and (6)
appurtenant facilities. The proposed
project would operate in a run-of-river
mode and generate about 5,318
megawatt hours annually. The power
would serve Lockhart Power Company’s
native load or be sold to a wholesale
customer.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate.
E:\FR\FM\22SEN1.SGM
22SEN1
Federal Register / Vol. 75, No. 183 / Wednesday, September 22, 2010 / Notices
Issue Deficiency Letter .........................................................................................................................................................
Issue Acceptance letter .........................................................................................................................................................
Issue Scoping Document 1 for comments ...........................................................................................................................
Request Additional Information (if necessary) ...................................................................................................................
Issue Scoping Document 2 (if necessary) ............................................................................................................................
Notice of application is ready for environmental analysis ................................................................................................
Notice of the availability of the draft EA ............................................................................................................................
Notice of the availability of the final EA ............................................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–23599 Filed 9–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–499–000]
Tres Palacios Gas Storage LLC; Notice
of Application
emcdonald on DSK2BSOYB1PROD with NOTICES
September 15, 2010.
Take notice that on September 3,
2010, Tres Palacios Gas Storage LLC
(Tres Palacios), 53 Riverside Avenue,
Westport, Connecticut 06880, filed in
Docket Number CP10–499–000,
pursuant to section 7(c) of the Natural
Gas Act (NGA), an application to amend
the certificate issued in Docket No.
CP07–90–000 to conform the
certificated capacities of its three inservice natural gas storage caverns to the
actual capacities available in each
cavern as established by the most recent
sonar survey results. This would add an
additional 2.36 Bcf of working gas
capacity to the facility. Tres Palacios
also seeks reaffirmation of its previously
authorized market-based rate authority
for its storage and hub services. This
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any questions regarding this
Application should be directed to James
F. Bowe, Jr., Dewey & LeBoeuf LLP,
1101 New York Avenue, NW.,
Washington, DC 20005, (202) 346–8000
VerDate Mar<15>2010
17:32 Sep 21, 2010
Jkt 220001
(phone), (202) 346–8102 (fax), or
jbowe@dl.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the below listed
comment date, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
57747
November 2010.
March 2011.
April 2011.
June 2011.
June 2011.
September 2011.
July 2012.
January 2013.
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: October 6, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–23624 Filed 9–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 1
September 10, 2010.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
E:\FR\FM\22SEN1.SGM
22SEN1
Agencies
[Federal Register Volume 75, Number 183 (Wednesday, September 22, 2010)]
[Notices]
[Pages 57746-57747]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-23599]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Lockhart Power Company; Notice of Application Tendered for Filing
With the Commission, Soliciting Additional Study Requests, and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
September 14, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 13590-001.
c. Date Filed: August 31, 2010.
d. Applicant: Lockhart Power Company.
e. Name of Project: Riverdale Hydroelectric Project.
f. Location: On the Enoree River in Spartanburg and Laurens
counties, South Carolina. The project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act 16 USC 791 (a)-825(r).
h. Applicant Contact: Bryan D. Stone, Chief Operating Officer,
Lockhart Power Company, Inc., 420 River Street, P.O. Box 10, Lockhart,
SC 29364, (864) 545-2211.
i. FERC Contact: Sarah Florentino, (202) 502-6863 or via e-mail at
Sarah.Florentino@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: November 1, 2010.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
m. This application is not ready for environmental analysis at this
time.
n. The existing, currently non-operational Riverdale Project
consists of: (1) A 12-foot high, 425-foot-long concrete gravity dam
with 2-foot flashboards; (2) a 9-acre impoundment; (3) a headrace
leading to a 110-foot-long steel penstock; (4) a powerhouse containing
a single 1.45-megawatt turbine-generator unit; (5) a 1400-foot-long
tailrace channel; and (6) appurtenant facilities. The proposed project
would operate in a run-of-river mode and generate about 5,318 megawatt
hours annually. The power would serve Lockhart Power Company's native
load or be sold to a wholesale customer.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate.
[[Page 57747]]
Issue Deficiency Letter.................. November 2010.
Issue Acceptance letter.................. March 2011.
Issue Scoping Document 1 for comments.... April 2011.
Request Additional Information (if June 2011.
necessary).
Issue Scoping Document 2 (if necessary).. June 2011.
Notice of application is ready for September 2011.
environmental analysis.
Notice of the availability of the draft July 2012.
EA.
Notice of the availability of the final January 2013.
EA.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-23599 Filed 9-21-10; 8:45 am]