Environmental Impact Statements; Notice of Availability, 57018 [2010-23325]
Download as PDF
wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1
57018
Federal Register / Vol. 75, No. 180 / Friday, September 17, 2010 / Notices
Timbalier 177 Receiving Station), and
appurtenances located offshore
Louisiana by sale to Chevron USA Inc.
(CUSA) pursuant to a Purchase and Sale
Agreement by which the ownership of
the Facilities will be transferred to
CUSA. VGS states no service will be
abandoned by the proposed
abandonment, all as more fully set forth
in the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to
counsel for Applicant, Mark K. Lewis,
Esq., Bracewell & Giuliani, 2000 K St.,
NW., Suite 500, Washington, DC 20006,
telephone no. (202) 828–5834, facsimile
no. (202) 857–2110 and e-mail:
Mark.Lewis@bglp.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–23214 Filed 9–16–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
14:46 Sep 16, 2010
Jkt 220001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8992–7]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/07/2010 Through 09/10/2010
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100367, Draft EIS, USFS, CO,
Big Moose Vegetation Management
Project, Implementation, Divide
Ranger District, Rio National Forest,
Hinsdale and Mineral Counties, CO,
Comment Period Ends: 11/01/2010,
Contact: Thomas Malecek 719–657–
3321.
EIS No. 20100368, Draft EIS, USFS, WA,
Pack and Saddle Stock OutfitterGuide Special Use Permit Issuance,
Okanogan, Chelah, and Skagit
Counties, WA, Comment Period Ends:
11/01/2010, Contact: Jennifer
Zbyszewski 509–996–4021.
EIS No. 20100369, Draft EIS, FTA, CA,
Hercules Intermodal Transit Center,
Construction To Improve Access to
Public Transit, Funding, Contra Costa
County, CA, Comment Period Ends:
11/01/2010, Contact: Paul Page 415–
744–3133.
EIS No. 20100370, Final EIS, FHWA,
WY, Jackson South Project, US/26/89/
189/91 Improvements, Funding and
Right-of-Way Approval, Teton
County, WY, Wait Period Ends: 10/18/
2010, Contact: Lee Potter 307–771–
2946.
PO 00000
Frm 00040
Fmt 4703
Sfmt 9990
EIS No. 20100371, Final EIS, USDA,
MN, Bemidji—Grand Rapid 230 kV
Transmission Line Project, Propose to
Construct and Operate, Beltrami,
Hubbard, Cass, Itasca Counties, MN,
Wait Period Ends: 10/18/2010,
Contact: Stephanie Strength 202–720–
0468.
EIS No. 20100372, Draft Supplement,
FHWA, GA, Northwest Corridor
Improvements, I–75/I–575
Construction, New Alternative,
USACE Section 404 Permit, NPDES
Permit, Cobb and Cherokee Counties,
CA, Comment Period Ends: 11/03/
2010, Contact: Rodney N. Barry 404–
562–3630.
EIS No. 20100373, Draft EIS, DOE, CA,
Energia Sierra Juarez U.S.
Transmission Line Project,
Construction, Operation,
Maintenance, and Connection of
either 230-kilovolt or a 500-kilovolt
Electric Transmission Line Crossing
U.S.-Mexico Border, Presidential
Permit Approval, San Diego County,
CA, Comment Period Ends: 11/01/
2010, Contact: Dr. Jerry Pell 202–586–
3362.
Amended Notices
EIS No. 20100281, Draft EIS, FHWA, IN,
I–69 Evansville to Indianapolis Tier 2
Section 4 Project, From U.S. 231
(Crane NSWC) to IN–37 South of
Bloomington in Section 4, Greene and
Monroe Counties, IN, Comment
Period Ends: 10/28/2010, Contact:
Janice Osadczuk 317–226–7486.
Revision to FR Notice 07/30/2010:
Extending Comment Period from 09/
28/2010 to 10/28/2010.
EIS No. 20100360, Draft Supplement,
USFS, CA, Gemmill Thin Project,
Updated Information on Four
Alternatives, Chanchellula LateSuccessional Reserve, Shasta-Trinity
National Forest, Trinity County, CA,
Comment Period Ends: 10/25/2010,
Contact: Bobbie DiMonte Miller 530–
226–2425. Revision to FR 09/10/2010:
Change Draft to Draft Supplemental.
EIS No. 20100363, Draft EIS, NOAA,
NC, Gray’s Reef National Marine
Sanctuary (GRNMS) Research Areas
Designation, Establish a Research
Area, Implementation, NC, Comment
Period Ends: 12/08/2010, Contact:
George Sedberry 912–598–2345.
Revision to FR Notice 09/10/2010:
Correction to the State from GA to NC.
Dated: September 14, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–23325 Filed 9–16–10; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\17SEN1.SGM
17SEN1
Agencies
[Federal Register Volume 75, Number 180 (Friday, September 17, 2010)]
[Notices]
[Page 57018]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-23325]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8992-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/07/2010 Through 09/10/2010
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA has met this mandate by publishing weekly
notices of availability of EPA comments, which includes a brief summary
of EPA's comment letters, in the Federal Register. Since February 2008,
EPA has been including its comment letters on EISs on its Web site at:
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire
EIS comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20100367, Draft EIS, USFS, CO, Big Moose Vegetation Management
Project, Implementation, Divide Ranger District, Rio National Forest,
Hinsdale and Mineral Counties, CO, Comment Period Ends: 11/01/2010,
Contact: Thomas Malecek 719-657-3321.
EIS No. 20100368, Draft EIS, USFS, WA, Pack and Saddle Stock Outfitter-
Guide Special Use Permit Issuance, Okanogan, Chelah, and Skagit
Counties, WA, Comment Period Ends: 11/01/2010, Contact: Jennifer
Zbyszewski 509-996-4021.
EIS No. 20100369, Draft EIS, FTA, CA, Hercules Intermodal Transit
Center, Construction To Improve Access to Public Transit, Funding,
Contra Costa County, CA, Comment Period Ends: 11/01/2010, Contact: Paul
Page 415-744-3133.
EIS No. 20100370, Final EIS, FHWA, WY, Jackson South Project, US/26/89/
189/91 Improvements, Funding and Right-of-Way Approval, Teton County,
WY, Wait Period Ends: 10/18/2010, Contact: Lee Potter 307-771-2946.
EIS No. 20100371, Final EIS, USDA, MN, Bemidji--Grand Rapid 230 kV
Transmission Line Project, Propose to Construct and Operate, Beltrami,
Hubbard, Cass, Itasca Counties, MN, Wait Period Ends: 10/18/2010,
Contact: Stephanie Strength 202-720-0468.
EIS No. 20100372, Draft Supplement, FHWA, GA, Northwest Corridor
Improvements, I-75/I-575 Construction, New Alternative, USACE Section
404 Permit, NPDES Permit, Cobb and Cherokee Counties, CA, Comment
Period Ends: 11/03/2010, Contact: Rodney N. Barry 404-562-3630.
EIS No. 20100373, Draft EIS, DOE, CA, Energia Sierra Juarez U.S.
Transmission Line Project, Construction, Operation, Maintenance, and
Connection of either 230-kilovolt or a 500-kilovolt Electric
Transmission Line Crossing U.S.-Mexico Border, Presidential Permit
Approval, San Diego County, CA, Comment Period Ends: 11/01/2010,
Contact: Dr. Jerry Pell 202-586-3362.
Amended Notices
EIS No. 20100281, Draft EIS, FHWA, IN, I-69 Evansville to Indianapolis
Tier 2 Section 4 Project, From U.S. 231 (Crane NSWC) to IN-37 South of
Bloomington in Section 4, Greene and Monroe Counties, IN, Comment
Period Ends: 10/28/2010, Contact: Janice Osadczuk 317-226-7486.
Revision to FR Notice 07/30/2010: Extending Comment Period from 09/28/
2010 to 10/28/2010.
EIS No. 20100360, Draft Supplement, USFS, CA, Gemmill Thin Project,
Updated Information on Four Alternatives, Chanchellula Late-
Successional Reserve, Shasta-Trinity National Forest, Trinity County,
CA, Comment Period Ends: 10/25/2010, Contact: Bobbie DiMonte Miller
530-226-2425. Revision to FR 09/10/2010: Change Draft to Draft
Supplemental.
EIS No. 20100363, Draft EIS, NOAA, NC, Gray's Reef National Marine
Sanctuary (GRNMS) Research Areas Designation, Establish a Research
Area, Implementation, NC, Comment Period Ends: 12/08/2010, Contact:
George Sedberry 912-598-2345. Revision to FR Notice 09/10/2010:
Correction to the State from GA to NC.
Dated: September 14, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-23325 Filed 9-16-10; 8:45 am]
BILLING CODE 6560-50-P