Environmental Impact Statements; Notice of Availability, 57018 [2010-23325]

Download as PDF wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1 57018 Federal Register / Vol. 75, No. 180 / Friday, September 17, 2010 / Notices Timbalier 177 Receiving Station), and appurtenances located offshore Louisiana by sale to Chevron USA Inc. (CUSA) pursuant to a Purchase and Sale Agreement by which the ownership of the Facilities will be transferred to CUSA. VGS states no service will be abandoned by the proposed abandonment, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding the application should be directed to counsel for Applicant, Mark K. Lewis, Esq., Bracewell & Giuliani, 2000 K St., NW., Suite 500, Washington, DC 20006, telephone no. (202) 828–5834, facsimile no. (202) 857–2110 and e-mail: Mark.Lewis@bglp.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. 2010–23214 Filed 9–16–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 14:46 Sep 16, 2010 Jkt 220001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8992–7] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 09/07/2010 Through 09/10/2010 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100367, Draft EIS, USFS, CO, Big Moose Vegetation Management Project, Implementation, Divide Ranger District, Rio National Forest, Hinsdale and Mineral Counties, CO, Comment Period Ends: 11/01/2010, Contact: Thomas Malecek 719–657– 3321. EIS No. 20100368, Draft EIS, USFS, WA, Pack and Saddle Stock OutfitterGuide Special Use Permit Issuance, Okanogan, Chelah, and Skagit Counties, WA, Comment Period Ends: 11/01/2010, Contact: Jennifer Zbyszewski 509–996–4021. EIS No. 20100369, Draft EIS, FTA, CA, Hercules Intermodal Transit Center, Construction To Improve Access to Public Transit, Funding, Contra Costa County, CA, Comment Period Ends: 11/01/2010, Contact: Paul Page 415– 744–3133. EIS No. 20100370, Final EIS, FHWA, WY, Jackson South Project, US/26/89/ 189/91 Improvements, Funding and Right-of-Way Approval, Teton County, WY, Wait Period Ends: 10/18/ 2010, Contact: Lee Potter 307–771– 2946. PO 00000 Frm 00040 Fmt 4703 Sfmt 9990 EIS No. 20100371, Final EIS, USDA, MN, Bemidji—Grand Rapid 230 kV Transmission Line Project, Propose to Construct and Operate, Beltrami, Hubbard, Cass, Itasca Counties, MN, Wait Period Ends: 10/18/2010, Contact: Stephanie Strength 202–720– 0468. EIS No. 20100372, Draft Supplement, FHWA, GA, Northwest Corridor Improvements, I–75/I–575 Construction, New Alternative, USACE Section 404 Permit, NPDES Permit, Cobb and Cherokee Counties, CA, Comment Period Ends: 11/03/ 2010, Contact: Rodney N. Barry 404– 562–3630. EIS No. 20100373, Draft EIS, DOE, CA, Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance, and Connection of either 230-kilovolt or a 500-kilovolt Electric Transmission Line Crossing U.S.-Mexico Border, Presidential Permit Approval, San Diego County, CA, Comment Period Ends: 11/01/ 2010, Contact: Dr. Jerry Pell 202–586– 3362. Amended Notices EIS No. 20100281, Draft EIS, FHWA, IN, I–69 Evansville to Indianapolis Tier 2 Section 4 Project, From U.S. 231 (Crane NSWC) to IN–37 South of Bloomington in Section 4, Greene and Monroe Counties, IN, Comment Period Ends: 10/28/2010, Contact: Janice Osadczuk 317–226–7486. Revision to FR Notice 07/30/2010: Extending Comment Period from 09/ 28/2010 to 10/28/2010. EIS No. 20100360, Draft Supplement, USFS, CA, Gemmill Thin Project, Updated Information on Four Alternatives, Chanchellula LateSuccessional Reserve, Shasta-Trinity National Forest, Trinity County, CA, Comment Period Ends: 10/25/2010, Contact: Bobbie DiMonte Miller 530– 226–2425. Revision to FR 09/10/2010: Change Draft to Draft Supplemental. EIS No. 20100363, Draft EIS, NOAA, NC, Gray’s Reef National Marine Sanctuary (GRNMS) Research Areas Designation, Establish a Research Area, Implementation, NC, Comment Period Ends: 12/08/2010, Contact: George Sedberry 912–598–2345. Revision to FR Notice 09/10/2010: Correction to the State from GA to NC. Dated: September 14, 2010. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–23325 Filed 9–16–10; 8:45 am] BILLING CODE 6560–50–P E:\FR\FM\17SEN1.SGM 17SEN1

Agencies

[Federal Register Volume 75, Number 180 (Friday, September 17, 2010)]
[Notices]
[Page 57018]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-23325]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8992-7]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 09/07/2010 Through 09/10/2010
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100367, Draft EIS, USFS, CO, Big Moose Vegetation Management 
Project, Implementation, Divide Ranger District, Rio National Forest, 
Hinsdale and Mineral Counties, CO, Comment Period Ends: 11/01/2010, 
Contact: Thomas Malecek 719-657-3321.
EIS No. 20100368, Draft EIS, USFS, WA, Pack and Saddle Stock Outfitter-
Guide Special Use Permit Issuance, Okanogan, Chelah, and Skagit 
Counties, WA, Comment Period Ends: 11/01/2010, Contact: Jennifer 
Zbyszewski 509-996-4021.
EIS No. 20100369, Draft EIS, FTA, CA, Hercules Intermodal Transit 
Center, Construction To Improve Access to Public Transit, Funding, 
Contra Costa County, CA, Comment Period Ends: 11/01/2010, Contact: Paul 
Page 415-744-3133.
EIS No. 20100370, Final EIS, FHWA, WY, Jackson South Project, US/26/89/
189/91 Improvements, Funding and Right-of-Way Approval, Teton County, 
WY, Wait Period Ends: 10/18/2010, Contact: Lee Potter 307-771-2946.
EIS No. 20100371, Final EIS, USDA, MN, Bemidji--Grand Rapid 230 kV 
Transmission Line Project, Propose to Construct and Operate, Beltrami, 
Hubbard, Cass, Itasca Counties, MN, Wait Period Ends: 10/18/2010, 
Contact: Stephanie Strength 202-720-0468.
EIS No. 20100372, Draft Supplement, FHWA, GA, Northwest Corridor 
Improvements, I-75/I-575 Construction, New Alternative, USACE Section 
404 Permit, NPDES Permit, Cobb and Cherokee Counties, CA, Comment 
Period Ends: 11/03/2010, Contact: Rodney N. Barry 404-562-3630.
EIS No. 20100373, Draft EIS, DOE, CA, Energia Sierra Juarez U.S. 
Transmission Line Project, Construction, Operation, Maintenance, and 
Connection of either 230-kilovolt or a 500-kilovolt Electric 
Transmission Line Crossing U.S.-Mexico Border, Presidential Permit 
Approval, San Diego County, CA, Comment Period Ends: 11/01/2010, 
Contact: Dr. Jerry Pell 202-586-3362.

Amended Notices

EIS No. 20100281, Draft EIS, FHWA, IN, I-69 Evansville to Indianapolis 
Tier 2 Section 4 Project, From U.S. 231 (Crane NSWC) to IN-37 South of 
Bloomington in Section 4, Greene and Monroe Counties, IN, Comment 
Period Ends: 10/28/2010, Contact: Janice Osadczuk 317-226-7486. 
Revision to FR Notice 07/30/2010: Extending Comment Period from 09/28/
2010 to 10/28/2010.
EIS No. 20100360, Draft Supplement, USFS, CA, Gemmill Thin Project, 
Updated Information on Four Alternatives, Chanchellula Late-
Successional Reserve, Shasta-Trinity National Forest, Trinity County, 
CA, Comment Period Ends: 10/25/2010, Contact: Bobbie DiMonte Miller 
530-226-2425. Revision to FR 09/10/2010: Change Draft to Draft 
Supplemental.
EIS No. 20100363, Draft EIS, NOAA, NC, Gray's Reef National Marine 
Sanctuary (GRNMS) Research Areas Designation, Establish a Research 
Area, Implementation, NC, Comment Period Ends: 12/08/2010, Contact: 
George Sedberry 912-598-2345. Revision to FR Notice 09/10/2010: 
Correction to the State from GA to NC.

    Dated: September 14, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-23325 Filed 9-16-10; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.