FirstLight Hydro Generating Company; City of Norwich Department of Public Utilities; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 55317-55318 [2010-22515]
Download as PDF
Federal Register / Vol. 75, No. 175 / Friday, September 10, 2010 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11475–013]
Central Vermont Public Service
Corporation; Notice of Application for
Amendment of License and Soliciting
Comments, Motions To Intervene, and
Protests
srobinson on DSKHWCL6B1PROD with NOTICES
September 2, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
License.
b. Project No.: 11475–013.
c. Date Filed: June 17, 2010.
d. Applicant: Central Vermont Public
Service Corporation.
e. Name of Project: Carver Falls
Hydroelectric Project.
f. Location: On the Poultney River, in
Washington County, New York and
Rutland County, Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Michael
Scarzello, Generation Asset Manager,
Central Vermont Public Service
Corporation, 77 Grove St., Rutland, VT
05701, (802) 747–5207.
i. FERC Contact: Christopher Chaney,
(202) 502–6778,
christopher.chaney@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
October 4, 2010.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
VerDate Mar<15>2010
16:29 Sep 09, 2010
Jkt 220001
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Application: The
applicant seeks approval to replace the
existing Unit #1 turbine, with a
hydraulic capacity of 162 cfs and a
nameplate capacity of 1,100 kW, with a
new turbine unit having a hydraulic
capacity of 177 cfs and a nameplate
capacity of 1,451 kW. The replacement
of the Unit #1 turbine will increase the
total project generation from 1,900 kW
to 2,251 kW, and increase total project
hydraulic capacity from 254 cfs to 269
cfs.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Any filings must bear in all capital
letters the title ‘‘COMMENTS,’’
‘‘PROTEST,’’ or ‘‘MOTION TO
INTERVENE,’’ as applicable, and the
Project Number of the particular
application to which the filing refers. A
copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
55317
o. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–22516 Filed 9–9–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–002; Project No. 12968–
001]
FirstLight Hydro Generating Company;
City of Norwich Department of Public
Utilities; Notice of Applications
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
September 2, 2010.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Applications: New Major
License.
b. Project Nos.: 2662–002 and 12968–
001.
c. Date Filed: August 31, 2010 (P–
2662) and August 27, 2010 (P–12968).
d. Applicants: Existing licensee—
FirstLight Hydro Generating Company
(FirstLight); and Competitor—City of
Norwich Department of Public Utilities
(Norwich Public Utilities).
e. Name of Project: Scotland
Hydroelectric Project.
f. Location: On the Shetucket River, in
Windham County, Connecticut. The
project does not occupy federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact:
For Project No. 2662: John Whitfield,
Senior Project Engineer, FirstLight
Hydro Generating Company, 20 Church
Street, Hartford, CT 06103.
For Project No. 12968: John F. Bilda,
General Manager, Norwich Public
Utilities, 16 South Golden Street,
Norwich, CT 06360.
i. FERC Contact: John Costello, (202)
502–6119 or john.costello@ferc.gov
j. These applications are not ready for
environmental analysis at this time.
E:\FR\FM\10SEN1.SGM
10SEN1
55318
Federal Register / Vol. 75, No. 175 / Friday, September 10, 2010 / Notices
k. The Project Description: The project
includes the following constructed
facilities: (1) A 480-foot-long earthen
dam with a 12-inch reinforced concrete
corewall consisting of (a) A 183-footlong, 32.5-foot-high earthen dike with a
top elevation 90.0 feet local datum; (b)
a 119-foot-long, 34-foot-high Taintor
gate section with a sill elevation at 64
feet local datum and a 3-foot-wide
transition section, five 20-foot-wide
bays, and four 4-foot-wide gate piers; (c)
an 89-foot-long, 35-foot-high Ambursentype ungated spillway section with a
crest elevation of 75.38 feet local datum;
(d) an 18.83-foot-long gravity-type
ungated spillway section with a crest
elevation of 75.38 feet local datum and
30-inch wooden pin-type flashboards;
and (e) a 70-foot-long powerhouse and
intake integral with the dam containing
a single 2,000 kW turbine-generator; (2)
a 134-acre reservoir at an elevation of
77.9 feet local datum with a usable
storage capacity of 268 acre-feet at a
drawdown of 2 feet; and (3) appurtenant
facilities.
The existing Scotland project operates
in a run-of-river mode during high flow
periods and a store-and-release mode,
with ponding, during low-flow periods.
Both applicants propose to increase
capacity by installing an additional
turbine and generator in the existing
powerhouse. Norwich Public Utilities’
proposal would increase capacity by 3.0
MW. FirstLight’s proposal would
increase capacity by 1.026 MW. Both
applicants propose to operate the
project in a run-of-river mode.
l. Locations of the Applications:
Copies of the applications are available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. Copies are also
available for inspection and
reproduction at the addresses in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The applications will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis (when FERC approved studies are complete) .............
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues EA ............................................................................................................................................................
Comments on EA or EIS .........................................................................................................................................................
Modified terms and conditions .................................................................................................................................................
November 11, 2010.
December 29, 2010.
June 13, 2011.
July 13, 2011.
September 11, 2011.
o. Final amendments to the
applications must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–22515 Filed 9–9–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
srobinson on DSKHWCL6B1PROD with NOTICES
September 1, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–86–000.
Applicants: NRG South Central
Generating LLC, CottonWood Energy
Company LP.
Description: Cottonwood Energy
Company LP submits application for
authorization under Section 203 of the
Federal Power Act.
Filed Date: 08/26/2010.
Accession Number: 20100827–0205.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 16, 2010.
Docket Numbers: EC10–90–000.
VerDate Mar<15>2010
16:29 Sep 09, 2010
Jkt 220001
Applicants: Central Vermont Public
Service Corp.
Description: Application under
Section 203 of the Federal Power Act of
Central Vermont Public Service
Corporation for the Merger of Facilities.
Filed Date: 08/31/2010.
Accession Number: 20100831–5246.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 21, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1304–002.
Applicants: DownEast Power
Company, LLC.
Description: DownEast Power
Company, LLC submits tariff filing per
35: eTariff Compliance Filing to be
effective 9/1/2010.
Filed Date: 08/31/2010.
Accession Number: 20100831–5127.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 21, 2010.
Docket Numbers: ER10–1467–001.
Applicants: Ohio Edison Company.
Description: Ohio Edison Company
submits tariff filing per 35: ComplianceRemove Headers to be effective 6/17/
2010.
Filed Date: 09/01/2010.
Accession Number: 20100901–5115.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 22, 2010.
Docket Numbers: ER10–1469–001.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Applicants: The Cleveland Electric
Illuminating Comp.
Description: The Cleveland Electric
Illuminating Company submits tariff
filing per 35: Compliance filing Remove
Headers to be effective 6/17/2010.
Filed Date: 09/01/2010.
Accession Number: 20100901–5054.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 22, 2010.
Docket Numbers: ER10–1468–001.
Applicants: The Toledo Edison
Company.
Description: The Toledo Edison
Company submits tariff filing per 35:
Compliance Filing Remove Headers 2 to
be effective 6/17/2010.
Filed Date: 08/31/2010.
Accession Number: 20100831–5132.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 21, 2010.
Docket Numbers: ER10–1720–001.
Applicants: Dry Lake Wind Power II
LLC.
Description: Dry Lake Wind Power II
LLC submits an amendment to Section
III.A of their application to demonstrate
that Dry Lake II lacks generation market
power within the Arizona Public
Service Company balancing authority
area, effective 9/4/2010.
Filed Date: 08/31/2010.
Accession Number: 20100831–5147.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 21, 2010.
Docket Numbers: ER10–1736–001.
E:\FR\FM\10SEN1.SGM
10SEN1
Agencies
[Federal Register Volume 75, Number 175 (Friday, September 10, 2010)]
[Notices]
[Pages 55317-55318]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-22515]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2662-002; Project No. 12968-001]
FirstLight Hydro Generating Company; City of Norwich Department
of Public Utilities; Notice of Applications Tendered for Filing With
the Commission and Establishing Procedural Schedule for Licensing and
Deadline for Submission of Final Amendments
September 2, 2010.
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection.
a. Type of Applications: New Major License.
b. Project Nos.: 2662-002 and 12968-001.
c. Date Filed: August 31, 2010 (P-2662) and August 27, 2010 (P-
12968).
d. Applicants: Existing licensee--FirstLight Hydro Generating
Company (FirstLight); and Competitor--City of Norwich Department of
Public Utilities (Norwich Public Utilities).
e. Name of Project: Scotland Hydroelectric Project.
f. Location: On the Shetucket River, in Windham County,
Connecticut. The project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact:
For Project No. 2662: John Whitfield, Senior Project Engineer,
FirstLight Hydro Generating Company, 20 Church Street, Hartford, CT
06103.
For Project No. 12968: John F. Bilda, General Manager, Norwich
Public Utilities, 16 South Golden Street, Norwich, CT 06360.
i. FERC Contact: John Costello, (202) 502-6119 or
john.costello@ferc.gov
j. These applications are not ready for environmental analysis at
this time.
[[Page 55318]]
k. The Project Description: The project includes the following
constructed facilities: (1) A 480-foot-long earthen dam with a 12-inch
reinforced concrete corewall consisting of (a) A 183-foot-long, 32.5-
foot-high earthen dike with a top elevation 90.0 feet local datum; (b)
a 119-foot-long, 34-foot-high Taintor gate section with a sill
elevation at 64 feet local datum and a 3-foot-wide transition section,
five 20-foot-wide bays, and four 4-foot-wide gate piers; (c) an 89-
foot-long, 35-foot-high Ambursen-type ungated spillway section with a
crest elevation of 75.38 feet local datum; (d) an 18.83-foot-long
gravity-type ungated spillway section with a crest elevation of 75.38
feet local datum and 30-inch wooden pin-type flashboards; and (e) a 70-
foot-long powerhouse and intake integral with the dam containing a
single 2,000 kW turbine-generator; (2) a 134-acre reservoir at an
elevation of 77.9 feet local datum with a usable storage capacity of
268 acre-feet at a drawdown of 2 feet; and (3) appurtenant facilities.
The existing Scotland project operates in a run-of-river mode
during high flow periods and a store-and-release mode, with ponding,
during low-flow periods.
Both applicants propose to increase capacity by installing an
additional turbine and generator in the existing powerhouse. Norwich
Public Utilities' proposal would increase capacity by 3.0 MW.
FirstLight's proposal would increase capacity by 1.026 MW. Both
applicants propose to operate the project in a run-of-river mode.
l. Locations of the Applications: Copies of the applications are
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. Copies are
also available for inspection and reproduction at the addresses in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule:
The applications will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule may be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready November 11, 2010.
for Environmental Analysis (when
FERC approved studies are complete).
Filing of recommendations, December 29, 2010.
preliminary terms and conditions,
and fishway prescriptions.
Commission issues EA................ June 13, 2011.
Comments on EA or EIS............... July 13, 2011.
Modified terms and conditions....... September 11, 2011.
------------------------------------------------------------------------
o. Final amendments to the applications must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-22515 Filed 9-9-10; 8:45 am]