Drawbridge Operation Regulations; Cape Fear River and Northeast Cape Fear River, in Wilmington, NC, 54770-54771 [2010-22415]
Download as PDF
54770
Federal Register / Vol. 75, No. 174 / Thursday, September 9, 2010 / Rules and Regulations
Federal regulations, Part 97, 14 CFR part
97, is amended by amending Standard
Instrument Approach Procedures,
effective at 0901 UTC on the dates
specified, as follows:
under the criteria of the Regulatory
Flexibility Act.
List of Subjects in 14 CFR Part 97
Air Traffic Control, Airports,
Incorporation by reference, and
Navigation (Air).
Issued in Washington, DC, on August 20,
2010.
John M. Allen,
Director, Flight Standards Service.
Adoption of the Amendment
Accordingly, pursuant to the authority
delegated to me, Title 14, Code of
■
AIRAC date
State
PART 97—STANDARD INSTRUMENT
APPROACH PROCEDURES
1. The authority citation for part 97
continues to read as follows:
■
Authority: 49 U.S.C. 106(g), 40103, 40106,
40113, 40114, 40120, 44502, 44514, 44701,
44719, 44721–44722.
Airport
FDC No.
23–Sep–10 ..
OH
MIDDLETOWN .........
23–Sep–10 ..
OH
MIDDLETOWN .........
23–Sep–10 ..
OH
MIDDLETOWN .........
23–Sep–10 ..
IL
PERU .......................
23–Sep–10 ..
TN
CHATTANOOGA .....
MIDDLETOWN/HOOK
FIELD
MUNI.
MIDDLETOWN/HOOK
FIELD
MUNI.
MIDDLETOWN/HOOK
FIELD
MUNI.
ILLINOIS VALLEY RGNL—
WALTER A DUNCAN FIELD.
LOVELL FIELD .........................
23–Sep–10 ..
23–Sep–10 ..
TN
NY
CHATTANOOGA .....
BUFFALO .................
23–Sep–10 ..
VA
MARION/
WYTHEVILLE.
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2010–0818]
Drawbridge Operation Regulations;
Cape Fear River and Northeast Cape
Fear River, in Wilmington, NC
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Fifth Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of two North
Carolina Department of Transportation
(NCDOT) drawbridges: The Cape Fear
River Memorial Bridge, across Cape Fear
River, mile 26.8, and the Isabel S.
Holmes Bridge, across Northeast Cape
Fear River, mile 1.0, both in
Wilmington, NC, to accommodate River
Fest 8K Run. The deviation allows the
bridges to remain in the closed position
to vessels.
jlentini on DSKJ8SOYB1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:14 Sep 08, 2010
Jkt 220001
By amending: § 97.23 VOR, VOR/
DME, VOR or TACAN, and VOR/DME
or TACAN; § 97.25 LOC, LOC/DME,
LDA, LDA/DME, SDF, SDF/DME;
§ 97.27 NDB, NDB/DME; § 97.29 ILS,
ILS/DME, MLS, MLS/DME, MLS/RNAV;
§ 97.31 RADAR SIAPs; § 97.33 RNAV
SIAPs; and § 97.35 COPTER SIAPs,
Identified as follows:
FDC date
Subject
0/1895
8/17/10
0/1896
8/17/10
NDB OR GPS RWY 23, AMDT
8D.
NDB OR GPS A, AMDT 2B.
0/1897
8/17/10
LOC RWY 23, AMDT 7F.
0/1998
8/10/10
LOC RWY 36, AMDT 3.
0/2155
8/10/10
LOVELL FIELD .........................
BUFFALO NIAGARA INTL .......
0/2156
0/3929
8/10/10
8/10/10
MOUNTAIN EMPIRE ................
0/7685
8/9/10
ILS OR LOC RWY 2, AMDT
7A.
VOR RWY 33, AMDT 17.
ILS OR LOC/DME RWY 32,
ORIG–A.
LOC RWY 26, AMDT 1B.
This deviation is effective from
8 a.m. to 10 a.m. on October 3, 2010.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
0818 and are available online by going
to https://www.regulations.gov, inserting
USCG–2010–0818 in the ‘‘keyword’’ box
and then clicking ‘‘Search’’. They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590 between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Sandra S. Elliott, Bridge
Management Specialist, Fifth Coast
Guard District; telephone 757–398–
6557, e-mail Sandra.S.Elliott@uscg.mil.
If you have questions on viewing the
docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone
202–366–9826.
SUPPLEMENTARY INFORMATION: The Cape
Fear River Memorial Bridge, a vertical
lift drawbridge, has vertical clearances
in full open and closed positions to
vessels of 135 feet and 65 feet above
mean high water (MHW), respectively.
The Isabel S. Holmes Bridge, across
DATES:
BILLING CODE 4910–13–P
§§ 97.23, 97.25, 97.27, 97.29, 97.31, 97.33,
97.35 [Amended]
* * * Effective Upon Publication
City
[FR Doc. 2010–21939 Filed 9–8–10; 8:45 am]
2. Part 97 is amended to read as
follows:
■
PO 00000
Frm 00012
Fmt 4700
Sfmt 4700
Northeast Cape Fear River, mile 1.0, a
bascule lift bridge, has a vertical
clearance in the closed position to
vessels of 40 feet above MHW.
The North Carolina Department of
Transportation, owner of the
drawbridges, has requested a temporary
deviation from the current operating
regulations of the aforementioned
bridges set out in 33 CFR 117.5, 117.823
and 117.829(a), respectively, to
accommodate the River Fest 8K Run
scheduled for Sunday, October 3, 2010,
from 8 a.m. to 10 a.m.
Under this deviation, the drawbridges
will be allowed to remain in the closedto-navigation position from 8 a.m. to 10
a.m. on Sunday, October 3, 2010 to
accommodate the River Fest 8K Run.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notices to mariners of the
closure period for the bridges so that
vessels can arrange their transits and to
minimize any impact caused by the
temporary deviation. There are no
alternate routes for vessels transiting
these sections of the Cape Fear and
Northeast Cape Fear Rivers and the
drawbridges will be able to open in the
event of an emergency.
In accordance with 33 CFR 117.35(e),
the drawbridges must return to their
regular operating schedules
immediately at the end of the
E:\FR\FM\09SER1.SGM
09SER1
Federal Register / Vol. 75, No. 174 / Thursday, September 9, 2010 / Rules and Regulations
designated time period. This deviation
from the operation regulations is
authorized under CFR 117.35.
Dated: August 27, 2010.
Waverly W. Gregory Jr.,
Chief, Bridge Administration Branch, Fifth
Coast Guard District.
[FR Doc. 2010–22415 Filed 9–8–10; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2010–0819]
Drawbridge Operation Regulation;
Trent River, New Bern, NC
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Fifth Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the US70
(Alfred C. Cunningham) Bridge across
Trent River, mile 0.0, at New Bern, NC,
to accommodate a Bridge Run. This
deviation allows the drawbridge to be
maintained in the closed position to
vessels at specific date and times.
DATES: This deviation is effective from
6 a.m. to 11 a.m. on Saturday, October
16, 2010.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
0819 and are available online by going
to https://www.regulations.gov, inserting
USCG–2010–0819 in the ‘‘Keyword’’ box
and then clicking ‘‘Search. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Sandra S. Elliott, Bridge
Management Specialist, Fifth Coast
Guard District; telephone 757–398–
6557, e-mail Sandra.S.Elliott@uscg.mil.
If you have questions on viewing the
docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone
202–366–9826.
SUPPLEMENTARY INFORMATION: The US70
(Alfred C. Cunningham) Bridge a
bascule lift bridge across Trent River, at
mile 0.0, has a vertical clearance in the
jlentini on DSKJ8SOYB1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:14 Sep 08, 2010
Jkt 220001
closed position to vessels of
approximately 14 feet above mean high
water.
On behalf of the Neuse River Bridge
Run Organization and the City of New
Bern NC, the North Carolina Department
of Transportation has requested a
temporary deviation from the current
operating regulations of the bridge set
out in 33 CFR 117.843 (a) to
accommodate the Bridge Run schedule
for Saturday, October 16, 2010.
Under this deviation, the drawbridge
would be allowed to remain in the
closed-to-navigation position from 6
a.m. to 11 a.m. to vessels on Saturday,
October 16, 2010, to accommodate the
Bridge Run.
The Coast Guard will inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
closure period for the bridge so that
vessels can arrange their transits to
minimize any impact caused by the
temporary deviation. There are no
alternate routes for vessels transiting
this section of the Trent River and the
drawbridge will be able to open in the
event of an emergency.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulation
is authorized under 33 CFR 117.35.
Dated: August 27, 2010.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth
Coast Guard District.
[FR Doc. 2010–22416 Filed 9–8–10; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2010–0755]
RIN 1625–AA00
Safety Zone; Thunder on the Bay,
Chesapeake Bay, Buckroe Beach Park,
Hampton, VA
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is
establishing a 210-foot radius safety
zone on the navigable waters of
Chesapeake Bay in Hampton, VA in
support of the Thunder on the Bay
fireworks event. This action is intended
to restrict vessel traffic movement to
protect mariners and spectators from the
SUMMARY:
PO 00000
Frm 00013
Fmt 4700
Sfmt 4700
54771
hazards associated with aerial fireworks
displays.
DATES: This rule is effective from 9:15
p.m. to 10 p.m. on September 17, 2010.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2010–
0755 and are available online by going
to https://www.regulations.gov, inserting
USCG–2010–0755 in the ‘‘Keyword’’
box, and then clicking ‘‘Search.’’ They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue, SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
rule, call or e-mail LT Michael DiPace,
Sector Hampton Roads Waterways
Management Division, Coast Guard;
telephone 757–668–5580, e-mail
Michael.S.DiPace@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION:
Regulatory Information
The Coast Guard is issuing this
temporary final rule without prior
notice and opportunity to comment
pursuant to authority under section 4(a)
of the Administrative Procedure Act
(APA) (5 U.S.C. 553(b)). This provision
authorizes an agency to issue a rule
without prior notice and opportunity to
comment when the agency for good
cause finds that those procedures are
‘‘impracticable, unnecessary, or contrary
to the public interest.’’ Under 5 U.S.C.
553(b)(B), the Coast Guard finds that
good cause exists for not publishing a
notice of proposed rulemaking (NPRM)
with respect to this rule because any
delay encountered in this regulation’s
effective date by publishing a NPRM
would be contrary to public interest
since immediate action is needed to
provide for the safety of life and
property on navigable waters.
Additionally, this temporary safety zone
will be enforced for approximately
forty-five minutes on Friday, September
17, 2010 while the fireworks display is
in progress.
Under 5 U.S.C. 553(d)(3), the Coast
Guard finds that good cause exists for
making this rule effective less than 30
days after publication in the Federal
Register. Due to the need for immediate
action, the restriction of vessel traffic is
necessary to protect life, property and
the environment during the fireworks
E:\FR\FM\09SER1.SGM
09SER1
Agencies
[Federal Register Volume 75, Number 174 (Thursday, September 9, 2010)]
[Rules and Regulations]
[Pages 54770-54771]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-22415]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2010-0818]
Drawbridge Operation Regulations; Cape Fear River and Northeast
Cape Fear River, in Wilmington, NC
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of two
North Carolina Department of Transportation (NCDOT) drawbridges: The
Cape Fear River Memorial Bridge, across Cape Fear River, mile 26.8, and
the Isabel S. Holmes Bridge, across Northeast Cape Fear River, mile
1.0, both in Wilmington, NC, to accommodate River Fest 8K Run. The
deviation allows the bridges to remain in the closed position to
vessels.
DATES: This deviation is effective from 8 a.m. to 10 a.m. on October 3,
2010.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-0818 and are available online
by going to https://www.regulations.gov, inserting USCG-2010-0818 in the
``keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590 between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Sandra S. Elliott, Bridge Management Specialist, Fifth
Coast Guard District; telephone 757-398-6557, e-mail
Sandra.S.Elliott@uscg.mil. If you have questions on viewing the docket,
call Renee V. Wright, Program Manager, Docket Operations, telephone
202-366-9826.
SUPPLEMENTARY INFORMATION: The Cape Fear River Memorial Bridge, a
vertical lift drawbridge, has vertical clearances in full open and
closed positions to vessels of 135 feet and 65 feet above mean high
water (MHW), respectively. The Isabel S. Holmes Bridge, across
Northeast Cape Fear River, mile 1.0, a bascule lift bridge, has a
vertical clearance in the closed position to vessels of 40 feet above
MHW.
The North Carolina Department of Transportation, owner of the
drawbridges, has requested a temporary deviation from the current
operating regulations of the aforementioned bridges set out in 33 CFR
117.5, 117.823 and 117.829(a), respectively, to accommodate the River
Fest 8K Run scheduled for Sunday, October 3, 2010, from 8 a.m. to 10
a.m.
Under this deviation, the drawbridges will be allowed to remain in
the closed-to-navigation position from 8 a.m. to 10 a.m. on Sunday,
October 3, 2010 to accommodate the River Fest 8K Run.
The Coast Guard will inform the users of the waterways through our
Local and Broadcast Notices to mariners of the closure period for the
bridges so that vessels can arrange their transits and to minimize any
impact caused by the temporary deviation. There are no alternate routes
for vessels transiting these sections of the Cape Fear and Northeast
Cape Fear Rivers and the drawbridges will be able to open in the event
of an emergency.
In accordance with 33 CFR 117.35(e), the drawbridges must return to
their regular operating schedules immediately at the end of the
[[Page 54771]]
designated time period. This deviation from the operation regulations
is authorized under CFR 117.35.
Dated: August 27, 2010.
Waverly W. Gregory Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.
[FR Doc. 2010-22415 Filed 9-8-10; 8:45 am]
BILLING CODE 9110-04-P