Environmental Impacts Statements; Notice of Availability, 51458 [2010-20702]

Download as PDF 51458 Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices Comment Date: August 31, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–20651 Filed 8–19–10; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8992–3] sroberts on DSKD5P82C1PROD with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 08/09/2010 through 08/13/2010. Pursuant to 40 CFR 1506.9. Notice: In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100318, Draft Supplement, FHWA, AR, River Valley Intermodal Facilities, New and Updated Information, Construction and Operation of Multi-Modal Transportation Complex, U.S. Army COE Section 10 and 404 Permits, City of Russellville, Pope County, AR, Comment Period Ends: 10/08/2010, Contact: Randal J. Looney 501–324–5625. EIS No. 20100319, Final EIS, NOAA, 00, Amendment 17A to the Fishery Management Plan for the Snapper Grouper Fishery of the South Atlantic Region, To Implement Long-Term Management Measures Expected to End Overfishing of the Red Snapper Stock, South Atlantic Region, Wait Period Ends: 09/20/2010, Contact: Roy E. Crabtree 727–824–5305. EIS No. 20100320, Final EIS, FHWA, MN, U.S. 14 Construction, Owatonna VerDate Mar<15>2010 17:19 Aug 19, 2010 Jkt 220001 to Kasson, Funding and Section 404 Permit, Dodge and Steele Counties, MN, Wait Period Ends: 09/20/2010, Contact: Phil Forst 651–291–6110. EIS No. 20100321, Final EIS, NPS, KY, Cumberland Gap National Historical Park, General Management Plan, Implementation, Middlesboro, KY, Wait Period Ends: 09/20/2010, Contact: David Libman 404–507– 5701. EIS No. 20100322, Draft EIS, USAF, 00, Powder River Training Complex Project, Proposal to Improve Airspace for Training, Primarily, B–1 Aircrews at Ellsworth AFB, South Dakota, and B–52 Aircrews at Minot AFB, North Dakota, Comment Period Ends: 11/17/2010, Contact: Linda Devine 757–964–9434. EIS No. 20100323, Draft Supplement, BLM, NV, Cortez Hills Expansion Project, Updated Information to Refine the Analysis of Specific Air Quality Effects and Dewatering Mitigation Effectiveness, Proposes to Construct and Operate a New Facilities and Expansion of the Existing Open-Pit Gold Mining and Processing Operations, Crescent Valley, Lander and Eureka Counties, NV, Comment Period Ends: 10/04/ 2010, Contact: Christopher Worthington 775–635–4000. EIS No. 20100324, Final EIS, BR, ID, Minidoka Dam Spillway Replacement Project, To Prevent Structural Failure of the Minidoka Dam Spillway and Canal Headworks, Lake Walcott, Minidoka County, ID, Wait Period Ends: 09/20/2010, Contact: Jim Taylor 208–378–5081. EIS No. 20100325, Draft EIS, NRC, AZ, GENERIC EIS—License Renewal of Nuclear Plants, Regarding Palo Verde Nuclear Generating Station, Supplement 43, NUREG–1437, Maricopa County, AZ, Comment Period Ends: 10/29/2010, Contact: David Drucker 301–415–6223. EIS No. 20100326, Draft EIS, NPS, SD, South Unit—Badlands National Park, General Management Plan, Implementation, SD, Comment Period Ends: 10/18/2010, Contact: Eric J. Brunnemann 605–433–5361. EIS No. 20100327, Draft EIS, BLM, NM, Alamogordo Regional Water Supply Project, Construct and Operate Groundwater Wells, Right-of-Way Application, Otero County, NM, Comment Period Ends: 10/18/2010, Contact: Rena Gutierrez 575–525– 4338. EIS No. 20100328, Final EIS, DOE, KS, Abengoa Biorefinery Project, To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Funding, Located near the City Hugoton, Stevens County, KS, Wait Period Ends: 09/09/2010, Contact: Kristin Kerwin 720–356–1564. EIS No. 20100329, Final EIS, BLM, CA, Blythe Solar Power Project (09–AFC– 6), Application for Right-of Way Grant to Construct and Operate, and Decommission a Solar Thermal Facility on Public Lands, Riverside County, CA, Wait Period Ends: 09/20/2010, Contact: Allison Shaffer 760–833–7104. Dated: August 17, 2010. Ken Mittelholtz, Deputy Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–20702 Filed 8–19–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9191–6] Notice of Extended Availability of Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Residually Designated Discharges in Milford, Bellingham and Franklin, Massachusetts; and Notice of Extended Availability of Proposed Amendments to the Preliminary Residual Designation Issued by EPA on November 12, 2008 Environmental Protection Agency (EPA). ACTION: Notice of Extended Availability of Draft NPDES General Permit. AGENCY: On April 20, 2010, the Director of the Office of Ecosystem Protection, Environmental Protection Agency-Region 1 (EPA), issued a Notice of Availability of a draft NPDES general permit for storm water discharges in the Charles River watershed within Milford, Bellingham and Franklin, Massachusetts, from sites that are proposed for final designation for NPDES permitting pursuant to EPA’s residual designation authority, and a Notice of Availability of Proposed Amendments to the Preliminary Residual Designation issued by EPA on November 12, 2008 (see FRL–9139–4). Today EPA is extending the public comment period for the draft permit and proposed Residual Designation until September 30, 2010. The draft general permit, appendices, and fact sheet are available at: https://www.epa.gov/ region1/npdes/stormwater. DATES: The public comment period is extended to September 30, 2010. Interested persons may submit comments on the draft general permit SUMMARY: E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 75, Number 161 (Friday, August 20, 2010)]
[Notices]
[Page 51458]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20702]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8992-3]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 08/09/2010 through 08/13/2010.
Pursuant to 40 CFR 1506.9.

    Notice: In accordance with Section 309(a) of the Clean Air Act, EPA 
is required to make its comments on EISs issued by other Federal 
agencies public. Historically, EPA has met this mandate by publishing 
weekly notices of availability of EPA comments, which includes a brief 
summary of EPA's comment letters, in the Federal Register. Since 
February 2008, EPA has been including its comment letters on EISs on 
its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. 
Including the entire EIS comment letters on the Web site satisfies the 
Section 309(a) requirement to make EPA's comments on EISs available to 
the public. Accordingly, on March 31, 2010, EPA discontinued the 
publication of the notice of availability of EPA comments in the 
Federal Register.

EIS No. 20100318, Draft Supplement, FHWA, AR, River Valley Intermodal 
Facilities, New and Updated Information, Construction and Operation of 
Multi-Modal Transportation Complex, U.S. Army COE Section 10 and 404 
Permits, City of Russellville, Pope County, AR, Comment Period Ends: 
10/08/2010, Contact: Randal J. Looney 501-324-5625.
EIS No. 20100319, Final EIS, NOAA, 00, Amendment 17A to the Fishery 
Management Plan for the Snapper Grouper Fishery of the South Atlantic 
Region, To Implement Long-Term Management Measures Expected to End 
Overfishing of the Red Snapper Stock, South Atlantic Region, Wait 
Period Ends: 09/20/2010, Contact: Roy E. Crabtree 727-824-5305.
EIS No. 20100320, Final EIS, FHWA, MN, U.S. 14 Construction, Owatonna 
to Kasson, Funding and Section 404 Permit, Dodge and Steele Counties, 
MN, Wait Period Ends: 09/20/2010, Contact: Phil Forst 651-291-6110.
EIS No. 20100321, Final EIS, NPS, KY, Cumberland Gap National 
Historical Park, General Management Plan, Implementation, Middlesboro, 
KY, Wait Period Ends: 09/20/2010, Contact: David Libman 404-507-5701.
EIS No. 20100322, Draft EIS, USAF, 00, Powder River Training Complex 
Project, Proposal to Improve Airspace for Training, Primarily, B-1 
Aircrews at Ellsworth AFB, South Dakota, and B-52 Aircrews at Minot 
AFB, North Dakota, Comment Period Ends: 11/17/2010, Contact: Linda 
Devine 757-964-9434.
EIS No. 20100323, Draft Supplement, BLM, NV, Cortez Hills Expansion 
Project, Updated Information to Refine the Analysis of Specific Air 
Quality Effects and Dewatering Mitigation Effectiveness, Proposes to 
Construct and Operate a New Facilities and Expansion of the Existing 
Open-Pit Gold Mining and Processing Operations, Crescent Valley, Lander 
and Eureka Counties, NV, Comment Period Ends: 10/04/2010, Contact: 
Christopher Worthington 775-635-4000.
EIS No. 20100324, Final EIS, BR, ID, Minidoka Dam Spillway Replacement 
Project, To Prevent Structural Failure of the Minidoka Dam Spillway and 
Canal Headworks, Lake Walcott, Minidoka County, ID, Wait Period Ends: 
09/20/2010, Contact: Jim Taylor 208-378-5081.
EIS No. 20100325, Draft EIS, NRC, AZ, GENERIC EIS--License Renewal of 
Nuclear Plants, Regarding Palo Verde Nuclear Generating Station, 
Supplement 43, NUREG-1437, Maricopa County, AZ, Comment Period Ends: 
10/29/2010, Contact: David Drucker 301-415-6223.
EIS No. 20100326, Draft EIS, NPS, SD, South Unit--Badlands National 
Park, General Management Plan, Implementation, SD, Comment Period Ends: 
10/18/2010, Contact: Eric J. Brunnemann 605-433-5361.
EIS No. 20100327, Draft EIS, BLM, NM, Alamogordo Regional Water Supply 
Project, Construct and Operate Groundwater Wells, Right-of-Way 
Application, Otero County, NM, Comment Period Ends: 10/18/2010, 
Contact: Rena Gutierrez 575-525-4338.
EIS No. 20100328, Final EIS, DOE, KS, Abengoa Biorefinery Project, To 
Support the Design, Construction, and Startup of a Commercial-Scale 
Integrated Biorefinery, Federal Funding, Located near the City Hugoton, 
Stevens County, KS, Wait Period Ends: 09/09/2010, Contact: Kristin 
Kerwin 720-356-1564.
EIS No. 20100329, Final EIS, BLM, CA, Blythe Solar Power Project (09-
AFC-6), Application for Right-of Way Grant to Construct and Operate, 
and Decommission a Solar Thermal Facility on Public Lands, Riverside 
County, CA, Wait Period Ends: 09/20/2010, Contact: Allison Shaffer 760-
833-7104.

    Dated: August 17, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2010-20702 Filed 8-19-10; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.