Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Mid-South Expansion Project and Request for Comments on Environmental Issues, 51455-51457 [2010-20652]

Download as PDF sroberts on DSKD5P82C1PROD with NOTICES Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010–20650 Filed 8–19–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 17:19 Aug 19, 2010 Jkt 220001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10–13–000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Mid-South Expansion Project and Request for Comments on Environmental Issues August 13, 2010. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Mid-South Expansion Project (MSEP) involving construction and operation of facilities by Transcontinental Gas Pipe Line Company, LLC (Transco) in Coosa, Randolph, Dallas, and Marengo Counties, Alabama; Gaston, Rowan, Davidson, and Cleveland Counties, North Carolina; Walton, Coweta, and Henry Counties, Georgia; and Spartanburg County, South Carolina. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on September 13, 2010. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives are asked to notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a pipeline company representative about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 51455 A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ is available for viewing on the FERC Web site (https:// www.ferc.gov). This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Summary of the Planned Project Transco is proposing to construct and operate five new pipeline loops,1 construct one new compressor station, add compression at two existing compressor stations, and perform other modifications to five compressor stations. The MSEP would provide about 451 million standard cubic feet of natural gas per day to Transco’s existing mainline system from the Clean Energy LNG import terminal currently under construction in Pascagoula, Mississippi, with existing capacity on Transco’s Mobile Bay Lateral, down to existing Compressor Station 85. According to Transco, its project would expand delivery capacity on its existing pipeline system to growing markets in the east as far downstream as Rockingham County, North Carolina. The MSEP would consist of the following facilities: • Five pipeline loops located in Coosa and Randolph Counties, Alabama, and Gaston, Rowan and Davidson Counties, North Carolina; • One new compressor station, Station 95, to be located in Dallas County, Alabama; • Additional new compression at two existing compressor stations: Æ Station 90 in Marengo County, Alabama; and Æ Station 125 in Walton County, Georgia; • Modifications at the following existing compressor stations: Æ Station 105 in Coosa County, Alabama; Æ Station 115 in Coweta County, Georgia; Æ Station 120 in Henry County, Georgia; Æ Station 140 in Spartanburg County, South Carolina; and Æ Station 145 in Cleveland County, North Carolina. The planned loops would be constructed with 42-inch-diameter steel pipe and would have a combined total length of about 22.6 miles. 1 A pipeline loop is constructed parallel to an existing pipeline to increase capacity. E:\FR\FM\20AUN1.SGM 20AUN1 51456 Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices The general location of the project facilities is shown in appendix 1.2 Land Requirements for Construction Construction of the planned facilities would disturb approximately 287.9 acres of land for the aboveground facilities and the pipeline. Following construction, approximately 144.6 acres would be maintained for permanent operation of the project’s facilities; the remaining acreage would be restored and allowed to revert to former uses. The entire planned pipeline route either parallels or would be located within existing pipeline, utility, or road rightsof-way. The EA Process sroberts on DSKD5P82C1PROD with NOTICES The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 3 to discover and address concerns the public may have about proposals. This process is referred to as scoping. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the planned project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air quality and noise; • endangered and threatened species; and • public safety. We will also evaluate possible alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. 2 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at https:// www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. VerDate Mar<15>2010 17:19 Aug 19, 2010 Jkt 220001 Although no formal application has been filed, we have already initiated our NEPA review under the Commission’s pre-filing process. The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before an application is filed with the FERC. As part of our pre-filing review, we have begun to contact some Federal and State agencies to discuss their involvement in the scoping process and the preparation of the EA. Our independent analysis of the issues will be presented in the EA. The EA will be placed in the public record and, depending on the comments received during the scoping process, may be published and distributed to the public. A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section beginning on page 5. With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO(s) as the project is further developed. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Historic properties are defined in those regulations as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register for Historic Places. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 include construction right-of-way, contractor/pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Currently Identified Environmental Issues We have already identified several issues that we think deserve attention based on a preliminary review of the planned facilities and the environmental information provided by Transco. This preliminary list of issues may be changed based on your comments and our analysis. • Cultural resources; • Water resources, fisheries, and wetlands; and • Threatened and endangered species. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that they will be received in Washington, DC on or before September 13, 2010. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the project docket number (PF10–13–000) with your submission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. With eFiling you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are E:\FR\FM\20AUN1.SGM 20AUN1 Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. sroberts on DSKD5P82C1PROD with NOTICES Environmental Mailing List The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor Once Transco files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until a formal application for the project is filed with the Commission. Additional Information Additional information about the project is available from the VerDate Mar<15>2010 17:19 Aug 19, 2010 Jkt 220001 Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF10–13). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. 2010–20652 Filed 8–19–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC10–146–000] Delaware Pipeline Company LLC; Notice of Filing August 13, 2010. Take notice that on July 13, 2010, Delaware Pipeline Company LLC (DPC) submitted a request for waiver of the requirement to file the FERC Form No. 6–Q for the second quarter of 2010. On June 1, 2010, DPC acquired oil pipeline assets associated with an idled refinery in Delaware City, Delaware from The Premcor Refining Group, Inc., a subsidiary of Valero Energy Corporation. For the thirty days in June 2010 during which the pipeline was under DPC’s ownership, the pipeline was not in operation and DPC had no revenue. The pipeline is currently in standby mode while the refinery, which is the origin for products shipped on the pipeline, is shutdown for a complete turnaround until early next year, and PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 51457 the pipeline also undergoes checks of certain operational systems. On July 1, 2010, Delaware Pipeline Company adopted the tariffs of The Premcor Pipeline Co. (‘‘Premcor’’) including FERC Nos. 2.0, 3.0 and 4.0 in their entirety. FERC Nos. 2.0.0, 3.0.0, and 4.0.0 implement a change in ownership effective June 1, 2010 of the pipeline facilities used to perform the services stated in the Premcor tariffs that are being adopted and brought forward under DPC’s name. DPC is adopting these tariffs to reflect its purchase of the Premcor pipeline system associated with the Delaware City Refinery, located in New Castle County, Delaware, which originates at the Delaware City Refinery and extends to Sunoco Pipeline L.P.’s Twin Oaks Pump Station, located in Delaware County, Pennsylvania. Since DPC had no operations during the 30-day period in June, it requests waiver of the quarter 2 6–Q reporting requirement of 18 CFR 357.4. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 or 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 75, Number 161 (Friday, August 20, 2010)]
[Notices]
[Pages 51455-51457]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20652]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF10-13-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To 
Prepare an Environmental Assessment for the Planned Mid-South Expansion 
Project and Request for Comments on Environmental Issues

August 13, 2010.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Mid-South Expansion Project 
(MSEP) involving construction and operation of facilities by 
Transcontinental Gas Pipe Line Company, LLC (Transco) in Coosa, 
Randolph, Dallas, and Marengo Counties, Alabama; Gaston, Rowan, 
Davidson, and Cleveland Counties, North Carolina; Walton, Coweta, and 
Henry Counties, Georgia; and Spartanburg County, South Carolina. This 
EA will be used by the Commission in its decision-making process to 
determine whether the project is in the public convenience and 
necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues need to be evaluated in the EA. Please note that 
the scoping period will close on September 13, 2010.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives are asked to notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, you may be contacted 
by a pipeline company representative about the acquisition of an 
easement to construct, operate, and maintain the planned facilities. 
The company would seek to negotiate a mutually acceptable agreement. 
However, if the project is approved by the Commission, that approval 
conveys with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings where compensation would be 
determined in accordance with state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet 
addresses a number of typically-asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings.

Summary of the Planned Project

    Transco is proposing to construct and operate five new pipeline 
loops,\1\ construct one new compressor station, add compression at two 
existing compressor stations, and perform other modifications to five 
compressor stations. The MSEP would provide about 451 million standard 
cubic feet of natural gas per day to Transco's existing mainline system 
from the Clean Energy LNG import terminal currently under construction 
in Pascagoula, Mississippi, with existing capacity on Transco's Mobile 
Bay Lateral, down to existing Compressor Station 85. According to 
Transco, its project would expand delivery capacity on its existing 
pipeline system to growing markets in the east as far downstream as 
Rockingham County, North Carolina.
---------------------------------------------------------------------------

    \1\ A pipeline loop is constructed parallel to an existing 
pipeline to increase capacity.
---------------------------------------------------------------------------

    The MSEP would consist of the following facilities:
 Five pipeline loops located in Coosa and Randolph Counties, 
Alabama, and Gaston, Rowan and Davidson Counties, North Carolina;
 One new compressor station, Station 95, to be located in 
Dallas County, Alabama;
 Additional new compression at two existing compressor 
stations:
    [cir] Station 90 in Marengo County, Alabama; and
    [cir] Station 125 in Walton County, Georgia;
 Modifications at the following existing compressor stations:
    [cir] Station 105 in Coosa County, Alabama;
    [cir] Station 115 in Coweta County, Georgia;
    [cir] Station 120 in Henry County, Georgia;
    [cir] Station 140 in Spartanburg County, South Carolina; and
    [cir] Station 145 in Cleveland County, North Carolina.

    The planned loops would be constructed with 42-inch-diameter steel 
pipe and would have a combined total length of about 22.6 miles.

[[Page 51456]]

    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
https://www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb approximately 
287.9 acres of land for the aboveground facilities and the pipeline. 
Following construction, approximately 144.6 acres would be maintained 
for permanent operation of the project's facilities; the remaining 
acreage would be restored and allowed to revert to former uses. The 
entire planned pipeline route either parallels or would be located 
within existing pipeline, utility, or road rights-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. All comments 
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:

 Geology and soils;
 land use;
 water resources, fisheries, and wetlands;
 cultural resources;
 vegetation and wildlife;
 air quality and noise;
 endangered and threatened species; and
 public safety.

    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before an 
application is filed with the FERC. As part of our pre-filing review, 
we have begun to contact some Federal and State agencies to discuss 
their involvement in the scoping process and the preparation of the EA.
    Our independent analysis of the issues will be presented in the EA. 
The EA will be placed in the public record and, depending on the 
comments received during the scoping process, may be published and 
distributed to the public. A comment period will be allotted if the EA 
is published for review. We will consider all comments on the EA before 
we make our recommendations to the Commission. To ensure your comments 
are considered, please carefully follow the instructions in the Public 
Participation section beginning on page 5.
    With this notice, we are asking agencies with jurisdiction and/or 
special expertise with respect to environmental issues to formally 
cooperate with us in the preparation of the EA. These agencies may 
choose to participate once they have evaluated the proposal relative to 
their responsibilities. Agencies that would like to request cooperating 
agency status should follow the instructions for filing comments 
provided under the Public Participation section of this notice.

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with applicable State Historic Preservation Office(s), and to solicit 
their views and those of other government agencies, interested Indian 
tribes, and the public on the project's potential effects on historic 
properties.\4\ We will define the project-specific Area of Potential 
Effects (APE) in consultation with the SHPO(s) as the project is 
further developed. On natural gas facility projects, the APE at a 
minimum encompasses all areas subject to ground disturbance (examples 
include construction right-of-way, contractor/pipe storage yards, 
compressor stations, and access roads). Our EA for this project will 
document our findings on the impacts on historic properties and 
summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Historic 
properties are defined in those regulations as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register for Historic 
Places.
---------------------------------------------------------------------------

Currently Identified Environmental Issues

    We have already identified several issues that we think deserve 
attention based on a preliminary review of the planned facilities and 
the environmental information provided by Transco. This preliminary 
list of issues may be changed based on your comments and our analysis.
 Cultural resources;
 Water resources, fisheries, and wetlands; and
 Threatened and endangered species.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that they will be received in Washington, DC on or before September 13, 
2010.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
project docket number (PF10-13-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
eFiling staff available to assist you at (202) 502-8258 or 
efiling@ferc.gov.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an 
easy method for interested persons to submit brief, text-only comments 
on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling you 
can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are

[[Page 51457]]

making. A comment on a particular project is considered a ``Comment on 
a Filing''; or
    (3) You may file a paper copy of your comments at the following 
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.

Environmental Mailing List

    The environmental mailing list includes Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
planned project.
    If the EA is published for distribution, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    Once Transco files its application with the Commission, you may 
want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are 
included in the User's Guide under the ``e-filing'' link on the 
Commission's Web site. Please note that the Commission will not accept 
requests for intervenor status at this time. You must wait until a 
formal application for the project is filed with the Commission.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number, excluding the last three digits in the Docket Number field 
(i.e., PF10-13). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-20652 Filed 8-19-10; 8:45 am]