Delaware Pipeline Company LLC; Notice of Filing, 51457-51458 [2010-20651]
Download as PDF
Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
sroberts on DSKD5P82C1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead
of the CD version or would like to
remove your name from the mailing
list, please return the attached
Information Request (appendix 2).
Becoming an Intervenor
Once Transco files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site. Please note that
the Commission will not accept requests
for intervenor status at this time. You
must wait until a formal application for
the project is filed with the
Commission.
Additional Information
Additional information about the
project is available from the
VerDate Mar<15>2010
17:19 Aug 19, 2010
Jkt 220001
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (https://www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
PF10–13). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–20652 Filed 8–19–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC10–146–000]
Delaware Pipeline Company LLC;
Notice of Filing
August 13, 2010.
Take notice that on July 13, 2010,
Delaware Pipeline Company LLC (DPC)
submitted a request for waiver of the
requirement to file the FERC Form No.
6–Q for the second quarter of 2010.
On June 1, 2010, DPC acquired oil
pipeline assets associated with an idled
refinery in Delaware City, Delaware
from The Premcor Refining Group, Inc.,
a subsidiary of Valero Energy
Corporation. For the thirty days in June
2010 during which the pipeline was
under DPC’s ownership, the pipeline
was not in operation and DPC had no
revenue. The pipeline is currently in
standby mode while the refinery, which
is the origin for products shipped on the
pipeline, is shutdown for a complete
turnaround until early next year, and
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
51457
the pipeline also undergoes checks of
certain operational systems.
On July 1, 2010, Delaware Pipeline
Company adopted the tariffs of The
Premcor Pipeline Co. (‘‘Premcor’’)
including FERC Nos. 2.0, 3.0 and 4.0 in
their entirety. FERC Nos. 2.0.0, 3.0.0,
and 4.0.0 implement a change in
ownership effective June 1, 2010 of the
pipeline facilities used to perform the
services stated in the Premcor tariffs
that are being adopted and brought
forward under DPC’s name. DPC is
adopting these tariffs to reflect its
purchase of the Premcor pipeline
system associated with the Delaware
City Refinery, located in New Castle
County, Delaware, which originates at
the Delaware City Refinery and extends
to Sunoco Pipeline L.P.’s Twin Oaks
Pump Station, located in Delaware
County, Pennsylvania.
Since DPC had no operations during
the 30-day period in June, it requests
waiver of the quarter 2 6–Q reporting
requirement of 18 CFR 357.4.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\20AUN1.SGM
20AUN1
51458
Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices
Comment Date: August 31, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–20651 Filed 8–19–10; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8992–3]
sroberts on DSKD5P82C1PROD with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/09/2010 through 08/13/2010.
Pursuant to 40 CFR 1506.9.
Notice: In accordance with Section
309(a) of the Clean Air Act, EPA is
required to make its comments on EISs
issued by other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100318, Draft Supplement,
FHWA, AR, River Valley Intermodal
Facilities, New and Updated
Information, Construction and
Operation of Multi-Modal
Transportation Complex, U.S. Army
COE Section 10 and 404 Permits, City
of Russellville, Pope County, AR,
Comment Period Ends:
10/08/2010, Contact: Randal J. Looney
501–324–5625.
EIS No. 20100319, Final EIS, NOAA, 00,
Amendment 17A to the Fishery
Management Plan for the Snapper
Grouper Fishery of the South Atlantic
Region, To Implement Long-Term
Management Measures Expected to
End Overfishing of the Red Snapper
Stock, South Atlantic Region, Wait
Period Ends: 09/20/2010, Contact:
Roy E. Crabtree 727–824–5305.
EIS No. 20100320, Final EIS, FHWA,
MN, U.S. 14 Construction, Owatonna
VerDate Mar<15>2010
17:19 Aug 19, 2010
Jkt 220001
to Kasson, Funding and Section 404
Permit, Dodge and Steele Counties,
MN, Wait Period Ends: 09/20/2010,
Contact: Phil Forst 651–291–6110.
EIS No. 20100321, Final EIS, NPS, KY,
Cumberland Gap National Historical
Park, General Management Plan,
Implementation, Middlesboro, KY,
Wait Period Ends: 09/20/2010,
Contact: David Libman 404–507–
5701.
EIS No. 20100322, Draft EIS, USAF, 00,
Powder River Training Complex
Project, Proposal to Improve Airspace
for Training, Primarily, B–1 Aircrews
at Ellsworth AFB, South Dakota, and
B–52 Aircrews at Minot AFB, North
Dakota, Comment Period Ends:
11/17/2010, Contact: Linda Devine
757–964–9434.
EIS No. 20100323, Draft Supplement,
BLM, NV, Cortez Hills Expansion
Project, Updated Information to
Refine the Analysis of Specific Air
Quality Effects and Dewatering
Mitigation Effectiveness, Proposes to
Construct and Operate a New
Facilities and Expansion of the
Existing Open-Pit Gold Mining and
Processing Operations, Crescent
Valley, Lander and Eureka Counties,
NV, Comment Period Ends: 10/04/
2010, Contact: Christopher
Worthington 775–635–4000.
EIS No. 20100324, Final EIS, BR, ID,
Minidoka Dam Spillway Replacement
Project, To Prevent Structural Failure
of the Minidoka Dam Spillway and
Canal Headworks, Lake Walcott,
Minidoka County, ID, Wait Period
Ends: 09/20/2010, Contact: Jim Taylor
208–378–5081.
EIS No. 20100325, Draft EIS, NRC, AZ,
GENERIC EIS—License Renewal of
Nuclear Plants, Regarding Palo Verde
Nuclear Generating Station,
Supplement 43, NUREG–1437,
Maricopa County, AZ, Comment
Period Ends: 10/29/2010, Contact:
David Drucker 301–415–6223.
EIS No. 20100326, Draft EIS, NPS, SD,
South Unit—Badlands National Park,
General Management Plan,
Implementation, SD, Comment Period
Ends: 10/18/2010, Contact: Eric J.
Brunnemann 605–433–5361.
EIS No. 20100327, Draft EIS, BLM, NM,
Alamogordo Regional Water Supply
Project, Construct and Operate
Groundwater Wells, Right-of-Way
Application, Otero County, NM,
Comment Period Ends: 10/18/2010,
Contact: Rena Gutierrez 575–525–
4338.
EIS No. 20100328, Final EIS, DOE, KS,
Abengoa Biorefinery Project, To
Support the Design, Construction, and
Startup of a Commercial-Scale
Integrated Biorefinery, Federal
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Funding, Located near the City
Hugoton, Stevens County, KS, Wait
Period Ends: 09/09/2010, Contact:
Kristin Kerwin 720–356–1564.
EIS No. 20100329, Final EIS, BLM, CA,
Blythe Solar Power Project (09–AFC–
6), Application for Right-of Way Grant
to Construct and Operate, and
Decommission a Solar Thermal
Facility on Public Lands, Riverside
County, CA, Wait Period Ends:
09/20/2010, Contact: Allison Shaffer
760–833–7104.
Dated: August 17, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2010–20702 Filed 8–19–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9191–6]
Notice of Extended Availability of Draft
National Pollutant Discharge
Elimination System (NPDES) General
Permit for Residually Designated
Discharges in Milford, Bellingham and
Franklin, Massachusetts; and Notice of
Extended Availability of Proposed
Amendments to the Preliminary
Residual Designation Issued by EPA
on November 12, 2008
Environmental Protection
Agency (EPA).
ACTION: Notice of Extended Availability
of Draft NPDES General Permit.
AGENCY:
On April 20, 2010, the
Director of the Office of Ecosystem
Protection, Environmental Protection
Agency-Region 1 (EPA), issued a Notice
of Availability of a draft NPDES general
permit for storm water discharges in the
Charles River watershed within Milford,
Bellingham and Franklin,
Massachusetts, from sites that are
proposed for final designation for
NPDES permitting pursuant to EPA’s
residual designation authority, and a
Notice of Availability of Proposed
Amendments to the Preliminary
Residual Designation issued by EPA on
November 12, 2008 (see FRL–9139–4).
Today EPA is extending the public
comment period for the draft permit and
proposed Residual Designation until
September 30, 2010. The draft general
permit, appendices, and fact sheet are
available at: https://www.epa.gov/
region1/npdes/stormwater.
DATES: The public comment period is
extended to September 30, 2010.
Interested persons may submit
comments on the draft general permit
SUMMARY:
E:\FR\FM\20AUN1.SGM
20AUN1
Agencies
[Federal Register Volume 75, Number 161 (Friday, August 20, 2010)]
[Notices]
[Pages 51457-51458]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20651]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AC10-146-000]
Delaware Pipeline Company LLC; Notice of Filing
August 13, 2010.
Take notice that on July 13, 2010, Delaware Pipeline Company LLC
(DPC) submitted a request for waiver of the requirement to file the
FERC Form No. 6-Q for the second quarter of 2010.
On June 1, 2010, DPC acquired oil pipeline assets associated with
an idled refinery in Delaware City, Delaware from The Premcor Refining
Group, Inc., a subsidiary of Valero Energy Corporation. For the thirty
days in June 2010 during which the pipeline was under DPC's ownership,
the pipeline was not in operation and DPC had no revenue. The pipeline
is currently in standby mode while the refinery, which is the origin
for products shipped on the pipeline, is shutdown for a complete
turnaround until early next year, and the pipeline also undergoes
checks of certain operational systems.
On July 1, 2010, Delaware Pipeline Company adopted the tariffs of
The Premcor Pipeline Co. (``Premcor'') including FERC Nos. 2.0, 3.0 and
4.0 in their entirety. FERC Nos. 2.0.0, 3.0.0, and 4.0.0 implement a
change in ownership effective June 1, 2010 of the pipeline facilities
used to perform the services stated in the Premcor tariffs that are
being adopted and brought forward under DPC's name. DPC is adopting
these tariffs to reflect its purchase of the Premcor pipeline system
associated with the Delaware City Refinery, located in New Castle
County, Delaware, which originates at the Delaware City Refinery and
extends to Sunoco Pipeline L.P.'s Twin Oaks Pump Station, located in
Delaware County, Pennsylvania.
Since DPC had no operations during the 30-day period in June, it
requests waiver of the quarter 2 6-Q reporting requirement of 18 CFR
357.4.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 or 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
[[Page 51458]]
Comment Date: August 31, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-20651 Filed 8-19-10; 8:45 am]
BILLING CODE 6717-01-P