Delaware Pipeline Company LLC; Notice of Filing, 51457-51458 [2010-20651]

Download as PDF Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. sroberts on DSKD5P82C1PROD with NOTICES Environmental Mailing List The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor Once Transco files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until a formal application for the project is filed with the Commission. Additional Information Additional information about the project is available from the VerDate Mar<15>2010 17:19 Aug 19, 2010 Jkt 220001 Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF10–13). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. 2010–20652 Filed 8–19–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC10–146–000] Delaware Pipeline Company LLC; Notice of Filing August 13, 2010. Take notice that on July 13, 2010, Delaware Pipeline Company LLC (DPC) submitted a request for waiver of the requirement to file the FERC Form No. 6–Q for the second quarter of 2010. On June 1, 2010, DPC acquired oil pipeline assets associated with an idled refinery in Delaware City, Delaware from The Premcor Refining Group, Inc., a subsidiary of Valero Energy Corporation. For the thirty days in June 2010 during which the pipeline was under DPC’s ownership, the pipeline was not in operation and DPC had no revenue. The pipeline is currently in standby mode while the refinery, which is the origin for products shipped on the pipeline, is shutdown for a complete turnaround until early next year, and PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 51457 the pipeline also undergoes checks of certain operational systems. On July 1, 2010, Delaware Pipeline Company adopted the tariffs of The Premcor Pipeline Co. (‘‘Premcor’’) including FERC Nos. 2.0, 3.0 and 4.0 in their entirety. FERC Nos. 2.0.0, 3.0.0, and 4.0.0 implement a change in ownership effective June 1, 2010 of the pipeline facilities used to perform the services stated in the Premcor tariffs that are being adopted and brought forward under DPC’s name. DPC is adopting these tariffs to reflect its purchase of the Premcor pipeline system associated with the Delaware City Refinery, located in New Castle County, Delaware, which originates at the Delaware City Refinery and extends to Sunoco Pipeline L.P.’s Twin Oaks Pump Station, located in Delaware County, Pennsylvania. Since DPC had no operations during the 30-day period in June, it requests waiver of the quarter 2 6–Q reporting requirement of 18 CFR 357.4. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 or 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\20AUN1.SGM 20AUN1 51458 Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices Comment Date: August 31, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–20651 Filed 8–19–10; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8992–3] sroberts on DSKD5P82C1PROD with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 08/09/2010 through 08/13/2010. Pursuant to 40 CFR 1506.9. Notice: In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100318, Draft Supplement, FHWA, AR, River Valley Intermodal Facilities, New and Updated Information, Construction and Operation of Multi-Modal Transportation Complex, U.S. Army COE Section 10 and 404 Permits, City of Russellville, Pope County, AR, Comment Period Ends: 10/08/2010, Contact: Randal J. Looney 501–324–5625. EIS No. 20100319, Final EIS, NOAA, 00, Amendment 17A to the Fishery Management Plan for the Snapper Grouper Fishery of the South Atlantic Region, To Implement Long-Term Management Measures Expected to End Overfishing of the Red Snapper Stock, South Atlantic Region, Wait Period Ends: 09/20/2010, Contact: Roy E. Crabtree 727–824–5305. EIS No. 20100320, Final EIS, FHWA, MN, U.S. 14 Construction, Owatonna VerDate Mar<15>2010 17:19 Aug 19, 2010 Jkt 220001 to Kasson, Funding and Section 404 Permit, Dodge and Steele Counties, MN, Wait Period Ends: 09/20/2010, Contact: Phil Forst 651–291–6110. EIS No. 20100321, Final EIS, NPS, KY, Cumberland Gap National Historical Park, General Management Plan, Implementation, Middlesboro, KY, Wait Period Ends: 09/20/2010, Contact: David Libman 404–507– 5701. EIS No. 20100322, Draft EIS, USAF, 00, Powder River Training Complex Project, Proposal to Improve Airspace for Training, Primarily, B–1 Aircrews at Ellsworth AFB, South Dakota, and B–52 Aircrews at Minot AFB, North Dakota, Comment Period Ends: 11/17/2010, Contact: Linda Devine 757–964–9434. EIS No. 20100323, Draft Supplement, BLM, NV, Cortez Hills Expansion Project, Updated Information to Refine the Analysis of Specific Air Quality Effects and Dewatering Mitigation Effectiveness, Proposes to Construct and Operate a New Facilities and Expansion of the Existing Open-Pit Gold Mining and Processing Operations, Crescent Valley, Lander and Eureka Counties, NV, Comment Period Ends: 10/04/ 2010, Contact: Christopher Worthington 775–635–4000. EIS No. 20100324, Final EIS, BR, ID, Minidoka Dam Spillway Replacement Project, To Prevent Structural Failure of the Minidoka Dam Spillway and Canal Headworks, Lake Walcott, Minidoka County, ID, Wait Period Ends: 09/20/2010, Contact: Jim Taylor 208–378–5081. EIS No. 20100325, Draft EIS, NRC, AZ, GENERIC EIS—License Renewal of Nuclear Plants, Regarding Palo Verde Nuclear Generating Station, Supplement 43, NUREG–1437, Maricopa County, AZ, Comment Period Ends: 10/29/2010, Contact: David Drucker 301–415–6223. EIS No. 20100326, Draft EIS, NPS, SD, South Unit—Badlands National Park, General Management Plan, Implementation, SD, Comment Period Ends: 10/18/2010, Contact: Eric J. Brunnemann 605–433–5361. EIS No. 20100327, Draft EIS, BLM, NM, Alamogordo Regional Water Supply Project, Construct and Operate Groundwater Wells, Right-of-Way Application, Otero County, NM, Comment Period Ends: 10/18/2010, Contact: Rena Gutierrez 575–525– 4338. EIS No. 20100328, Final EIS, DOE, KS, Abengoa Biorefinery Project, To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Funding, Located near the City Hugoton, Stevens County, KS, Wait Period Ends: 09/09/2010, Contact: Kristin Kerwin 720–356–1564. EIS No. 20100329, Final EIS, BLM, CA, Blythe Solar Power Project (09–AFC– 6), Application for Right-of Way Grant to Construct and Operate, and Decommission a Solar Thermal Facility on Public Lands, Riverside County, CA, Wait Period Ends: 09/20/2010, Contact: Allison Shaffer 760–833–7104. Dated: August 17, 2010. Ken Mittelholtz, Deputy Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–20702 Filed 8–19–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9191–6] Notice of Extended Availability of Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Residually Designated Discharges in Milford, Bellingham and Franklin, Massachusetts; and Notice of Extended Availability of Proposed Amendments to the Preliminary Residual Designation Issued by EPA on November 12, 2008 Environmental Protection Agency (EPA). ACTION: Notice of Extended Availability of Draft NPDES General Permit. AGENCY: On April 20, 2010, the Director of the Office of Ecosystem Protection, Environmental Protection Agency-Region 1 (EPA), issued a Notice of Availability of a draft NPDES general permit for storm water discharges in the Charles River watershed within Milford, Bellingham and Franklin, Massachusetts, from sites that are proposed for final designation for NPDES permitting pursuant to EPA’s residual designation authority, and a Notice of Availability of Proposed Amendments to the Preliminary Residual Designation issued by EPA on November 12, 2008 (see FRL–9139–4). Today EPA is extending the public comment period for the draft permit and proposed Residual Designation until September 30, 2010. The draft general permit, appendices, and fact sheet are available at: https://www.epa.gov/ region1/npdes/stormwater. DATES: The public comment period is extended to September 30, 2010. Interested persons may submit comments on the draft general permit SUMMARY: E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 75, Number 161 (Friday, August 20, 2010)]
[Notices]
[Pages 51457-51458]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20651]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AC10-146-000]


Delaware Pipeline Company LLC; Notice of Filing

August 13, 2010.
    Take notice that on July 13, 2010, Delaware Pipeline Company LLC 
(DPC) submitted a request for waiver of the requirement to file the 
FERC Form No. 6-Q for the second quarter of 2010.
    On June 1, 2010, DPC acquired oil pipeline assets associated with 
an idled refinery in Delaware City, Delaware from The Premcor Refining 
Group, Inc., a subsidiary of Valero Energy Corporation. For the thirty 
days in June 2010 during which the pipeline was under DPC's ownership, 
the pipeline was not in operation and DPC had no revenue. The pipeline 
is currently in standby mode while the refinery, which is the origin 
for products shipped on the pipeline, is shutdown for a complete 
turnaround until early next year, and the pipeline also undergoes 
checks of certain operational systems.
    On July 1, 2010, Delaware Pipeline Company adopted the tariffs of 
The Premcor Pipeline Co. (``Premcor'') including FERC Nos. 2.0, 3.0 and 
4.0 in their entirety. FERC Nos. 2.0.0, 3.0.0, and 4.0.0 implement a 
change in ownership effective June 1, 2010 of the pipeline facilities 
used to perform the services stated in the Premcor tariffs that are 
being adopted and brought forward under DPC's name. DPC is adopting 
these tariffs to reflect its purchase of the Premcor pipeline system 
associated with the Delaware City Refinery, located in New Castle 
County, Delaware, which originates at the Delaware City Refinery and 
extends to Sunoco Pipeline L.P.'s Twin Oaks Pump Station, located in 
Delaware County, Pennsylvania.
    Since DPC had no operations during the 30-day period in June, it 
requests waiver of the quarter 2 6-Q reporting requirement of 18 CFR 
357.4.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 or 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

[[Page 51458]]

    Comment Date: August 31, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-20651 Filed 8-19-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.