City of Kaukauna, WI; Notice of Availability of Environmental Assessment, 51032 [2010-20461]
Download as PDF
51032
Federal Register / Vol. 75, No. 159 / Wednesday, August 18, 2010 / Notices
information, contact John Smith at (202)
502–8972.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–20460 Filed 8–17–10; 8:45 am]
[Project No. 739–022–VA]
DEPARTMENT OF ENERGY
[Docket No. PR10–79–000]
BILLING CODE 6717–01–P
Appalachian Power Company; Notice
of Availability of Environmental
Assessment
sroberts on DSKD5P82C1PROD with NOTICES
August 12, 2010.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR
47879), the Office of Energy Projects has
reviewed the application for a new
license for the Claytor Hydroelectric
Project, located on the New River in
Pulaski County, Virginia, and prepared
a draft environmental assessment (DEA).
In the DEA, Commission staff analyze
the potential environmental effects of
licensing the project and conclude that
issuing a license for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Claytor Project No. 739–
022’’ to all comments. Comments may be
filed electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
VerDate Mar<15>2010
18:40 Aug 17, 2010
Jkt 220001
National Fuel Gas Distribution
Corporation; Notice of Baseline Filing
DEPARTMENT OF ENERGY
August 12, 2010.
Federal Energy Regulatory
Commission
[Project No. 2677–019]
City of Kaukauna, WI; Notice of
Availability of Environmental
Assessment
August 12, 2010.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47897), the
Office of Energy Projects has reviewed
the application for a new license for the
8-megawatt (MW) Badger-Rapide Croche
Hydroelectric Project located on the Fox
River in Outagamie County, Wisconsin,
and has prepared a Final Environmental
Assessment (EA) in cooperation with
the U.S. Army Corps of Engineers. In the
EA, Commission staff analyzes the
potential environmental effects of
relicensing the project and conclude
that issuing a new license for the
project, with appropriate environmental
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The final EA may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. For further information,
contact John Smith at (202) 502–8972.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–20461 Filed 8–17–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
Take notice that on August 10, 2010,
National fuel Gas Distribution
Corporation submitted a baseline filing
of its Statement of Operating Conditions
for services provided under Section 311
of the Natural Gas Policy Act of 1978
(‘‘NGPA’’).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\18AUN1.SGM
18AUN1
Agencies
[Federal Register Volume 75, Number 159 (Wednesday, August 18, 2010)]
[Notices]
[Page 51032]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20461]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2677-019]
City of Kaukauna, WI; Notice of Availability of Environmental
Assessment
August 12, 2010.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has
reviewed the application for a new license for the 8-megawatt (MW)
Badger-Rapide Croche Hydroelectric Project located on the Fox River in
Outagamie County, Wisconsin, and has prepared a Final Environmental
Assessment (EA) in cooperation with the U.S. Army Corps of Engineers.
In the EA, Commission staff analyzes the potential environmental
effects of relicensing the project and conclude that issuing a new
license for the project, with appropriate environmental measures, would
not constitute a major federal action significantly affecting the
quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The final EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. For further information,
contact John Smith at (202) 502-8972.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-20461 Filed 8-17-10; 8:45 am]
BILLING CODE 6717-01-P