Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 50760 [2010-20203]

Download as PDF 50760 Federal Register / Vol. 75, No. 158 / Tuesday, August 17, 2010 / Notices (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website at https:// www.ferc.gov under the link to Documents and Filings. With eFiling you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). jdjones on DSK8KYBLC1PROD with NOTICES Kimberly D. Bose, Secretary. [FR Doc. 2010–20207 Filed 8–16–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 15:16 Aug 16, 2010 Jkt 220001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process August 10, 2010. a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 13318–000. c. Date Filed: June 9, 2010. d. Submitted by: Swan Lake North Hydro, LLC. e. Name of Project: Swan Lake North Hydroelectric Project. f. Location: Approximately 11 miles northeast of Klamath Falls in Klamath County, Oregon. The project would be a closed-loop pumped storage project utilizing ground water, and would not be built on any existing body of water. The project would occupy United States lands administered by the U.S. Bureau of Land Management. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Brent Smith; Symbiotics LLC; P.O. Box 535; Rigby, Idaho 83442; (208) 745– 0834; or e-mail at brent.smith@symbioticsenergy.com. i. FERC Contact: Dianne Rodman at (202) 502–6077; or e-mail at dianne.rodman@ferc.gov. j. Swan Lake North Hydro filed its request to use the Traditional Licensing Process on June 9, 2010. Swan Lake North Hydro provided public notice of its request on June 25 through July 29, 2010. In a letter dated August 6, 2010, the Director of the Division of Hydropower Licensing approved Swan Lake North Hydro’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and (b) the Oregon State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. Swan Lake North Hydro filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. n. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–20203 Filed 8–16–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10–78–000] Crosstex LIG, LLC; Notice of Filing August 10, 2010. Take notice that on August 5, 2010, Crosstex LIG, LLC (Crosstex) filed to revise its Statement of Operating Conditions to provide additional options for contracting transportation services, change the manner in which Crosstex addresses capacity and priority determinations, clarify the nature in which certain gas accounting will be managed, and to change certain situational financial requirements. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. E:\FR\FM\17AUN1.SGM 17AUN1

Agencies

[Federal Register Volume 75, Number 158 (Tuesday, August 17, 2010)]
[Notices]
[Page 50760]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20203]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing 
Process

August 10, 2010.
    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 13318-000.
    c. Date Filed: June 9, 2010.
    d. Submitted by: Swan Lake North Hydro, LLC.
    e. Name of Project: Swan Lake North Hydroelectric Project.
    f. Location: Approximately 11 miles northeast of Klamath Falls in 
Klamath County, Oregon. The project would be a closed-loop pumped 
storage project utilizing ground water, and would not be built on any 
existing body of water. The project would occupy United States lands 
administered by the U.S. Bureau of Land Management.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Mr. Brent Smith; Symbiotics LLC; 
P.O. Box 535; Rigby, Idaho 83442; (208) 745-0834; or e-mail at 
brent.smith@symbioticsenergy.com.
    i. FERC Contact: Dianne Rodman at (202) 502-6077; or e-mail at 
dianne.rodman@ferc.gov.
    j. Swan Lake North Hydro filed its request to use the Traditional 
Licensing Process on June 9, 2010. Swan Lake North Hydro provided 
public notice of its request on June 25 through July 29, 2010. In a 
letter dated August 6, 2010, the Director of the Division of Hydropower 
Licensing approved Swan Lake North Hydro's request to use the 
Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service under section 7 of the 
Endangered Species Act and the joint agency regulations thereunder at 
50 CFR, Part 402; and (b) the Oregon State Historic Preservation 
Officer, as required by section 106, National Historical Preservation 
Act, and the implementing regulations of the Advisory Council on 
Historic Preservation at 36 CFR 800.2.
    l. Swan Lake North Hydro filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    m. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field, to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    n. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-20203 Filed 8-16-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.