Environmental Impacts Statements; Notice Of Availability, 49486-49487 [2010-20050]
Download as PDF
49486
Federal Register / Vol. 75, No. 156 / Friday, August 13, 2010 / Notices
(1) A private metered postmark.
(2) A mail receipt that is not dated by
the U.S. Postal Service.
If your application is postmarked after
the application deadline date, we will
not consider your application.
Note 1: The U.S. Postal Service does not
uniformly provide a dated postmark. Before
relying on this method, you should check
with your local post office.
Note 2: Materials mailed through the U.S.
Postal Service may be subject to damage due
to irradiation processes. Therefore, Arts
applicants are required to send their
applications by commercial carrier.
b. Submission of Applications by
Hand Delivery.
If you submit your application by
hand delivery, you (or a courier service)
must deliver the original and two copies
of your application by hand, on or
before the application deadline date, to
the Department at the following address:
U.S. Department of Education,
Application Control Center, Attention:
(CFDA Number 84.170A) 550 12th
Street, SW., Room 7041, Potomac Center
Plaza, Washington, DC 20202–4260.
The Application Control Center
accepts hand deliveries daily between
8:00 a.m. and 4:30:00 p.m., Washington,
DC time, except Saturdays, Sundays,
and Federal holidays.
emcdonald on DSK2BSOYB1PROD with NOTICES
Note for Mail or Hand Delivery of Paper
Applications: If you mail or hand deliver
your application to the Department—
(1) You must indicate on the envelope
and—if not provided by the Department—in
Item 11 of the SF 424 the CFDA Number,
including suffix letter, if any, of the
competition under which you are submitting
your application; and
(2) The Application Control Center will
mail to you a notification of receipt of your
grant application. If you do not receive this
notification within 15 business days from the
application deadline date, you should call
the U.S. Department of Education
Application Control Center at (202) 245–
6288.
V. Application Review Information
1. Selection Criteria: The selection
criteria for this program are established
by the JKJ Program Fellowship Board,
pursuant to section 702(a)(2) of the HEA
and 34 CFR 650.20(a). The selection
criteria for applications in the
humanities and social sciences are: (a)
Statement of purpose (150 points); (b)
Letters of recommendation (100 points);
(c) Academic record (100 points); and
(d) Scholarly awards/honors (50 points).
The selection criteria for applications in
the arts are: (a) Statement of purpose
(100 points); (b) Letters of
recommendation (100 points); (c)
Academic record (50 points); (d)
Scholarly awards/honors (50 points);
VerDate Mar<15>2010
16:35 Aug 12, 2010
Jkt 220001
and (e) Supporting arts materials (100
points).
2. Review and Selection Process: The
review and selection process for the JKJ
Fellowship Program consists of a twopart process. Eligible applications are
read and rated by a panel of
distinguished scholars and academics in
the arts, humanities, and social sciences
on the basis of demonstrated scholarly
achievements and exceptional promise.
The second part of the evaluation is a
determination of financial need.
VI. Award Administration Information
1. Award Notices: If your application
is successful, we will notify you by
telephone and we will send a Grant
Award Notice (GAN) directly to the
institution you will be attending.
If your application is not evaluated or
not selected for funding, we notify you.
2. Administrative and National Policy
Requirements: We identify
administrative and national policy
requirements in the application package
and reference these and other
requirements in the Applicable
Regulations section in this notice.
We reference the regulations outlining
the terms and conditions of an award in
the Applicable Regulations section of
this notice and include these and other
specific conditions in the GAN. The
GAN also incorporates your approved
application as part of your binding
commitments under the grant.
3. Reporting: On an annual basis,
fellows must submit their FAFSA to the
Javits Program Coordinator at their
institutions, as directed by the
Secretary, pursuant to 34 CFR 650.37. In
addition, Javits fellows are required to
submit an annual performance report.
The Department will contact fellows
regarding the completion of the annual
performance report.
4. Performance Measures: The
effectiveness of the JKJ Fellowship
Program will be measured by graduate
completion rates, time-to-degree
completion rates, and the costs per PhD
or master’s degree of talented graduate
students with demonstrated financial
need who are pursuing the highest
degree available in their designated
fields of study. Institutions of higher
education in which the fellows are
enrolled are required to submit an
annual report documenting the fellows’
satisfactory academic progress and the
determined financial need. Javits
fellows are also required to submit an
annual performance report to assist
program staff in tracking time-to-degree
completion rates, graduation rates, as
well as the employment status of
individual fellows. The Department will
use the reports to assess the program’s
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
success in assisting fellows in
completing their course of study and
receiving their degree.
VII. Agency Contacts
For Further Information Contact:
Carmen Gordon or Sara Starke, Jacob K.
Javits Fellowship Program, U.S.
Department of Education, Teacher and
Student Development Programs Service,
1990 K St., NW., room 6013,
Washington, DC 20006–8524.
Telephone: (202) 502–7542 or e-mail:
ope_javits_program@ed.gov.
If you use a TDD, call the FRS, toll
free, at 1–800–877–8339.
VIII. Other Information
Accessible Format: Individuals with
disabilities can obtain this document
and a copy of the application package in
an accessible format (e.g., braille, large
print, audiotape, or computer diskette)
on request to the program contact
person listed under For Further
Information Contact in section VII of
this notice.
Electronic Access to This Document:
You can view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF), on the Internet at the
following site: https://www.ed.gov/news/
fedregister. To use PDF, you must have
Adobe Acrobat Reader, which is
available free at this site.
Note: The official version of this document
is the document published in the Federal
Register. Free Internet access to the official
edition of the Federal Register and the Code
of Federal Regulations is available on GPO
Access at: https://www.gpoaccess.gov/nara/
index.html.
Dated: August 10, 2010.
Eduardo M. Ochoa,
Assistant Secretary for Postsecondary
Education.
[FR Doc. 2010–20062 Filed 8–12–10; 8:45 am]
BILLING CODE 4000–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8992–2]
Environmental Impacts Statements;
Notice Of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 08/02/2010 through 08/06/2010
pursuant to 40 CFR 1506.9.
E:\FR\FM\13AUN1.SGM
13AUN1
emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 75, No. 156 / Friday, August 13, 2010 / Notices
Notice:
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100304, Final EIS, USFS, 00,
Umatilla National Forest Invasive
Plants Treatment, Propose to Treat
Invasive Plants and Restore Treated
Sites, Asotin, Columbia, Garfield,
Walla Walla Counties, WA and Grant,
Morrow, Umatilla, Union, Wallowa,
Wheeler Counties, OR, Wait Period
Ends: 09/13/2010, Contact: Robert
Giannity, 541–278–3869.
EIS No. 20100305, Draft EIS, NPS, AK,
Nebesna Off-Road Vehicle
Management Plan, Implementation,
Wrangell-St. Elias National Park and
Preserve, AK, Comment Period Ends:
09/27/2010, Contact: Bruce Rogers,
907–822–7276.
EIS No. 20100306, Final EIS, USA, GA,
Fort Stewart Training Range and
Garrison Support Facilities
Construction and Operation, Liberty,
Long, Bryan, Evans and Tattnall
Counties, GA, Wait Period Ends: 09/
13/2010, Contact: Jennifer Shore, 703–
602–4238.
EIS No. 20100307, Revised Final EIS,
FHWA, MN, MN–371 North
Improvement Project, Reconstruction
from the Intersection of Crow Wing
County Road 18 in Nisswa to the
Intersection of Cass County Road 42
in Pine River, Funding, NPDES
Permit, and US Army COE Section
404 Permit Issuance, Crow Wing and
Cass Counties, MN, Wait Period Ends:
09/13/2010, Contact: Philip Forst,
651–291–6110.
EIS No. 20100308, Draft EIS, USFS, MN,
South Fowl Lake Snowmobile Access
Project, Proposing a Replacement
Snowmobile Trail between McFarland
Lake and South Fowl Lake, Gunflint
Ranger District, Superior National
Forest, Eastern Region, Cook County,
MN, Comment Period Ends: 09/27/
VerDate Mar<15>2010
16:35 Aug 12, 2010
Jkt 220001
2010, Contact: Peter Taylor, 218–626–
4368.
EIS No. 20100309, Final EIS, BLM, CO,
Little Snake Resource Management
Plan, Implementation, Moffat, Routt
and Rio Blanco Counties, Craig CO,
Wait Period Ends: 09/13/2010,
Contact: Jeremy Casterson, 970–836–
5071.
EIS No. 20100310, Final EIS, BLM, CA,
Chevron Energy Solutions Lucerne
Valley Solar Project, Proposing To
Develop a 45-megawatt (MW) Solar
Photovotaic (PV) Plant and Associated
Facilities on 516 Acres of Federal
Land Managed, California Desert
Conservation Area Plan Amendment,
San Bernardino County, CA, Wait
Period Ends: 09/13/2010, Contact:
Greg Thomsen, 951–697–5237.
EIS No. 20100311, Draft EIS, NRC, FL,
Levy Nuclear Plant Units 1 and 2,
Application for Combined Licenses
(COLs) for Construction Permits and
Operating Licenses, (NUREG–1941),
Levy County, FL Comment Period
Ends: 10/26/2010, Contact: Douglas
Bruner, 301–415–2730.
EIS No. 20100312, Draft EIS, NRC, TX,
Comanche Peak Nuclear Power Plant
Units 3 and 4, Application for
Combined Licenses (COLs) for
Construction Permits and Operating
Licenses, (NUREG–1943), Hood and
Somervell Counties, TX, Comment
Period Ends: 10/26/2010, Contact:
Michael H. Willingham, 301–415–
3924.
EIS No. 20100313, Final EIS, CDBG, 00,
Goethals Bridge Replacement Project,
Construction of Bridge across the
Arthur Kill between Staten Island
New York and Elizabeth, New Jersey,
Funding and USCG Bridge Permit, NY
and NJ, Wait Period Ends: 09/13/
2010, Contact: Shelly Sugarman, 202–
372–1521.
EIS No. 20100314, Final EIS, DOD, VT,
158th Fighter Wing Vermont Air
National Guard Project, Proposed
Realignment of National Guard
Avenue and Main Gate Construction,
Burlington International Airport in
South Burlington, VT, Wait Period
Ends: 09/13/2010, Contact: Robert
Dogan, 301–836–8859.
EIS No. 20100315, Final EIS, USFWS,
00, Lewis and Clark National Wildlife
Refuge and Julia Butler Hansen
Refuge for the Columbian Whitetailed Deer, Comprehensive
Conservation Plan, Implementation,
Wahkiakum County, WA and Clatsop
and Columbia Counties, OR, Wait
Period Ends: 09/13/2010, Contact:
Charlie Stenvall, 360–484–3482.
EIS No. 20100316, Final EIS, BIA, CA,
Ione Band of Miwok Indians Project,
Proposed 228.04 Acre Fee-to-Trust
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
49487
Land Transfer and Casino Project,
Amador County, CA, Wait Period
Ends: 09/13/2010, Contact: John
Rydzik, 916–978–6051.
Dated: August 10, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–20050 Filed 8–12–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9189–3; Docket ID No. EPA–HQ–ORD–
2010–0658]
Nanomaterial Case Study: Nanoscale
Silver in Disinfectant Spray
Environmental Protection
Agency (EPA).
ACTION: Notice of public comment
period.
AGENCY:
EPA is announcing a 45-day
public comment period for the draft
document ‘‘Nanomaterial Case Study:
Nanoscale Silver in Disinfectant Spray’’
(EPA/600/R–10/081). The document is
being issued by the National Center for
Environmental Assessment within
EPA’s Office of Research and
Development. The draft is intended to
serve as part of a process to help
identify and prioritize scientific and
technical information that could be used
in conducting comprehensive
environmental assessments of selected
nanomaterials. It does not attempt to
draw conclusions regarding potential
environmental risks of nanoscale silver;
rather, it aims to identify what is known
and unknown about nanoscale silver to
support future assessment efforts.
When finalizing the draft document,
EPA intends to consider any public
comments that EPA receives in
accordance with this notice.
EPA is releasing this draft document
solely for the purpose of predissemination review under applicable
information quality guidelines. This
document has not been formally
disseminated by EPA. It does not
represent and should not be construed
to represent any Agency policy or
determination.
The draft document is available via
the Internet on the NCEA home page
under the Recent Additions and the
Data and Publications menus at https://
www.epa.gov/ncea.
DATES: The 45-day public comment
period begins August 13, 2010, and ends
September 27, 2010. Technical
comments should be in writing and
must be received by EPA by September
27, 2010.
SUMMARY:
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 75, Number 156 (Friday, August 13, 2010)]
[Notices]
[Pages 49486-49487]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-20050]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8992-2]
Environmental Impacts Statements; Notice Of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 08/02/2010 through 08/06/2010 pursuant to 40 CFR 1506.9.
[[Page 49487]]
Notice:
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA has met this mandate by publishing weekly
notices of availability of EPA comments, which includes a brief summary
of EPA's comment letters, in the Federal Register. Since February 2008,
EPA has been including its comment letters on EISs on its Web site at:
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire
EIS comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20100304, Final EIS, USFS, 00, Umatilla National Forest
Invasive Plants Treatment, Propose to Treat Invasive Plants and Restore
Treated Sites, Asotin, Columbia, Garfield, Walla Walla Counties, WA and
Grant, Morrow, Umatilla, Union, Wallowa, Wheeler Counties, OR, Wait
Period Ends: 09/13/2010, Contact: Robert Giannity, 541-278-3869.
EIS No. 20100305, Draft EIS, NPS, AK, Nebesna Off-Road Vehicle
Management Plan, Implementation, Wrangell-St. Elias National Park and
Preserve, AK, Comment Period Ends: 09/27/2010, Contact: Bruce Rogers,
907-822-7276.
EIS No. 20100306, Final EIS, USA, GA, Fort Stewart Training Range and
Garrison Support Facilities Construction and Operation, Liberty, Long,
Bryan, Evans and Tattnall Counties, GA, Wait Period Ends: 09/13/2010,
Contact: Jennifer Shore, 703-602-4238.
EIS No. 20100307, Revised Final EIS, FHWA, MN, MN-371 North Improvement
Project, Reconstruction from the Intersection of Crow Wing County Road
18 in Nisswa to the Intersection of Cass County Road 42 in Pine River,
Funding, NPDES Permit, and US Army COE Section 404 Permit Issuance,
Crow Wing and Cass Counties, MN, Wait Period Ends: 09/13/2010, Contact:
Philip Forst, 651-291-6110.
EIS No. 20100308, Draft EIS, USFS, MN, South Fowl Lake Snowmobile
Access Project, Proposing a Replacement Snowmobile Trail between
McFarland Lake and South Fowl Lake, Gunflint Ranger District, Superior
National Forest, Eastern Region, Cook County, MN, Comment Period Ends:
09/27/2010, Contact: Peter Taylor, 218-626-4368.
EIS No. 20100309, Final EIS, BLM, CO, Little Snake Resource Management
Plan, Implementation, Moffat, Routt and Rio Blanco Counties, Craig CO,
Wait Period Ends: 09/13/2010, Contact: Jeremy Casterson, 970-836-5071.
EIS No. 20100310, Final EIS, BLM, CA, Chevron Energy Solutions Lucerne
Valley Solar Project, Proposing To Develop a 45-megawatt (MW) Solar
Photovotaic (PV) Plant and Associated Facilities on 516 Acres of
Federal Land Managed, California Desert Conservation Area Plan
Amendment, San Bernardino County, CA, Wait Period Ends: 09/13/2010,
Contact: Greg Thomsen, 951-697-5237.
EIS No. 20100311, Draft EIS, NRC, FL, Levy Nuclear Plant Units 1 and 2,
Application for Combined Licenses (COLs) for Construction Permits and
Operating Licenses, (NUREG-1941), Levy County, FL Comment Period Ends:
10/26/2010, Contact: Douglas Bruner, 301-415-2730.
EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant
Units 3 and 4, Application for Combined Licenses (COLs) for
Construction Permits and Operating Licenses, (NUREG-1943), Hood and
Somervell Counties, TX, Comment Period Ends: 10/26/2010, Contact:
Michael H. Willingham, 301-415-3924.
EIS No. 20100313, Final EIS, CDBG, 00, Goethals Bridge Replacement
Project, Construction of Bridge across the Arthur Kill between Staten
Island New York and Elizabeth, New Jersey, Funding and USCG Bridge
Permit, NY and NJ, Wait Period Ends: 09/13/2010, Contact: Shelly
Sugarman, 202-372-1521.
EIS No. 20100314, Final EIS, DOD, VT, 158th Fighter Wing Vermont Air
National Guard Project, Proposed Realignment of National Guard Avenue
and Main Gate Construction, Burlington International Airport in South
Burlington, VT, Wait Period Ends: 09/13/2010, Contact: Robert Dogan,
301-836-8859.
EIS No. 20100315, Final EIS, USFWS, 00, Lewis and Clark National
Wildlife Refuge and Julia Butler Hansen Refuge for the Columbian White-
tailed Deer, Comprehensive Conservation Plan, Implementation, Wahkiakum
County, WA and Clatsop and Columbia Counties, OR, Wait Period Ends: 09/
13/2010, Contact: Charlie Stenvall, 360-484-3482.
EIS No. 20100316, Final EIS, BIA, CA, Ione Band of Miwok Indians
Project, Proposed 228.04 Acre Fee-to-Trust Land Transfer and Casino
Project, Amador County, CA, Wait Period Ends: 09/13/2010, Contact: John
Rydzik, 916-978-6051.
Dated: August 10, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-20050 Filed 8-12-10; 8:45 am]
BILLING CODE 6560-50-P