Environmental Impacts Statements; Notice Of Availability, 47591-47592 [2010-19430]

Download as PDF sroberts on DSKD5P82C1PROD with NOTICES Federal Register / Vol. 75, No. 151 / Friday, August 6, 2010 / Notices correction mechanism ensures the accuracy of the Inventory without imposing an unreasonable burden on the chemical industry. Without the Inventory correction mechanism, a company that submitted incorrect information would have to file a premanufacture notification (PMN) under TSCA section 5 to place the correct chemical substance on the Inventory whenever the previously reported substance is found to be misidentified. This would impose a much greater burden on both EPA and the submitter than the existing correction mechanism. This information collection applies to reporting and recordkeeping activities associated with the correction of misreported chemical substances found on the TSCA Inventory. Responses to the collection of information are voluntary. Respondents may claim all or part of a notice confidential. EPA will disclose information that is covered by a claim of confidentiality only to the extent permitted by, and in accordance with, the procedures in TSCA section 14 and 40 CFR part 2. Burden statement: The annual public reporting and recordkeeping burden for this collection of information is estimated to average 2.25 hours per response. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements which have subsequently changed; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. The ICR provides a detailed explanation of this estimate, which is only briefly summarized here: Estimated total number of potential respondents: 9. Frequency of response: On occasion. Estimated total average number of responses for each respondent: 1. Estimated total annual burden hours: 20 hours. Estimated total annual costs: $1,174. This includes an estimated burden cost of $1,174 and an estimated cost of $0 for capital investment or maintenance and operational costs. VerDate Mar<15>2010 16:35 Aug 05, 2010 Jkt 220001 IV. Are There Changes in the Estimates from the Last Approval? There is no change in the total estimated respondent burden compared with that identified in the ICR currently approved by OMB. V. What is the Next Step in the Process for this ICR? EPA will consider the comments received and amend the ICR as appropriate. The final ICR package will then be submitted to OMB for review and approval pursuant to 5 CFR 1320.12. EPA will issue another Federal Register notice pursuant to 5 CFR 1320.5(a)(1)(iv) to announce the submission of the ICR to OMB and the opportunity to submit additional comments to OMB. If you have any questions about this ICR or the approval process, please contact the technical person listed under FOR FURTHER INFORMATION CONTACT. List of Subjects Environmental protection, Reporting and recordkeeping requirements. Dated: July 30, 2010. Stephen A. Owens, Assistant Administrator, Office of Chemical Safety and Pollution Prevention. [FR Doc. 2010–19440 Filed 8–5–10; 8:45 am] BILLING CODE 6560–50–S ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8992–1] Environmental Impacts Statements; Notice Of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 07/26/2010 Through 07/30/2010 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 47591 comment letters on the website satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100283, Draft EIS, USFS, NM, Santa Fe National Forest Travel Management, Proposes to Provide for a System of Road, Trails, and Areas Designated for Motorized Use, Santa Fe, NM, Comment Period Ends: 09/ 30/2010, Contact: Julie Bain 505–438– 5443. EIS No. 20100284, Final EIS, USFS, MT, Lower West Fork Project, To Treat Units in and Adjacent to the Wildland-Urban-Interface (WUI) with Prescribed Fire, and Commercial and Pre-Commercial Thins, West Fork Ranger District, Bitterroot National Forest, Ravalli County, MT, Wait Period Ends: 09/07/2010, Contact: Dave M. Campbell 406–821–3269 EIS No. 20100285, Draft EIS, WAPA, SD, Groton Generation Station (GGS) Project, Proposes to Modify its Interconnection Agreement, Basin Electric Power Cooperative, for the (GGS) to Eliminate 50–Megawatts (MW) Annual Average Operating Limit, Brown County, SD, Comment Period Ends: 09/20/2010, Contact: Erika Walters 720–962–7279. EIS No. 20100286, Draft EIS, FHWA, SC, Mark Clark Expressway Extension Project, Proposed Construction from the Interchange at I–526 and U.S. 17 to the James Island Connector, Charleston County, SC, Comment Period Ends: 09/30/2010, Contact: Patrick Tyndall 803–765–5460. EIS No. 20100287, Final EIS, NPS, NY, Roosevelt-Vanderbilt National Historic Sites, General Management Plan, Implementation, Hyde Park, NY, Wait Period Ends: 09/07/2010, Contact: Marjorie Smith 339–223– 0131. EIS No. 20100288, Final EIS, BIA, OR, Cascade Locks Resort and Casino Project, Application for the Fee-toTrust Transfer of 25 Acres of Land within the City of Cascade Locks, Confederated Tribes of the Warn Springs Reservation of Oregon, Cascade Locks, Hood River County, OR, Wait Period Ends: 09/07/2010, Contact: Scott Aikin 503–231–6883. EIS No. 20100289, Draft EIS, USACE, CA, San Clemente Shoreline Protection Project, To Provide Shore Protection Through Nourishment of the Beach at the San Clemente Pier, San Clemente, CA, Comment Period Ends: 09/20/2010, Contact: Thomas W. Keeney 213–452–3875. E:\FR\FM\06AUN1.SGM 06AUN1 sroberts on DSKD5P82C1PROD with NOTICES 47592 Federal Register / Vol. 75, No. 151 / Friday, August 6, 2010 / Notices EIS No. 20100290, Final EIS, FHWA, MN, Trunk Highway 23 and US Highway 71 Project, Construction of One or More Grade-Separated Bridge Crossings, Dovre Township, Northeast of Wilmar County, Kandiyohi, MN, Wait Period Ends: 09/07/2010, Contact: Philip Forst 651–291–6110. EIS No. 20100291, Draft EIS, USFS, CA, Sequoia National Forest Plan Amendment, Giant Sequoia National Monument, Comprehensive Management Plan, Implementation, CA, Comment Period Ends: 11/03/ 2010, Contact: Anne Thomas 559– 784–1500 ext. 1164. EIS No. 20100292, Final EIS, BLM, CA, Ivanpah Solar Electric Generating System (07–AFC–5) Project, Proposal to Construct a 400-m Megawatt Concentrated Solar Power Tower, Thermal-Electric Power Plant, San Bernardino County, CA, Wait Period Ends: 09/07/2010, Contact: Tom Hurshman 970–240–5345. EIS No. 20100293, Final EIS, USN, CA, Marine Corps Base Camp Pendleton Basewide Utilities Infrastructure Construct and Operate Six Utility Infrastructure Project, San Diego County, CA, Wait Period Ends: 09/07/ 2010, Contact: Jesse Martinez 619– 532–3844. EIS No. 20100294, Final EIS, USN, FL, Renewal of Authorization to Use Pinecastle Range, New Information that was not Available in the 2002 FEIS, Continued Use of the Range for a 20 Year Period, Special Use Permit Issuance, Ocala National Forest, Marion and Lake Counties, FL, Wait Period Ends: 09/07/2010, Contact: Tom Currin 904–542–6301. EIS No. 20100295, Final EIS, FHWA, OR, Sellwood Bridge Project, Rehabilitate or Replace the Bridge Crosses the Willamette River on Southeast Tacoma Street and Oregon State Highway 43, Funding, Multnomah County, OR, Wait Period Ends: 09/07/2010, Contact: Jeffrey Graham 503–587–4727. EIS No. 20100296, Draft EIS, NOAA, 00, Columbia River Basin Hatchery Operations and the Funding of Mitchell Act Hatchery Program, To Authorize the Establishment, Operation and Maintenance of One or More Hatchery Facilities, OR, WA and ID, Comment Period Ends: 11/04/ 2010, Contact: Allyson Purcell 503– 736–4736. EIS No. 20100297, Final EIS, NRC, NE, Generic—License Renewal of Nuclear Plants, Regarding Cooper Nuclear Station, Unit 1, Supplement 41 to NUREG–1437, Nemaha County, NE, Wait Period Ends: 09/07/2010, VerDate Mar<15>2010 16:35 Aug 05, 2010 Jkt 220001 Contact: Bennett M. Brady 301–415– 2981. EIS No. 20100298, Final EIS, USFS, WV, Allegheny Wood Product Easement, Proposes to Convey an Easement of Right-of-Way along the Railroad Grade located in the Blackwater Canyon Area, Monongahela National Forest, Tucker County, WV, Wait Period Ends: 09/07/2010, Contact: David Ede 304–636–1800 Ext 233. EIS No. 20100299, Draft EIS, FERC, CA, McCloud-Pit Hydroelectric Project, (Project No. 2106) Application to Relicense its 368-Megawatt (MW), McCloud and Pit Rivers, Shasta County, CA, Comment Period Ends: 09/28/2010, Contact: Mary O’Driscoll 1–866–208–3372. EIS No. 20100300, Draft EIS, BIA, CA, Cloverdale Rancheria of Pomo Indians (Tribe) Fee-to-Trust and Resort Casino Project, Taking Six Parcels into Federal Trust, Implementation, Sonoma County, CA, Comment Period Ends: 10/20/2010, Contact: John Rydzik 916–978–6051. EIS No. 20100301, Final EIS, BIA, CA, Enterprise Rancheria Gaming Facility and Hotel Fee-To-Trust Acquisition Project, Implementation, Federal Trust, Estom Yumeka Maida Tribe, Yuba County, CA, Wait Period Ends: 09/07/2010, Contact: John Rydzik 916–978–6051. EIS No. 20100302, Final EIS, BIA, CA, North Fork Rancheria of Mono Indians Fee-to-Trust and Casino/Hotel Project, Proposed 305-Acres-Fee-toTrust Land Acquisition in Unincorporated Madera County, CA, Wait Period Ends: 09/07/2010, Contact: John Rydzik 916–978–6051. EIS No. 20100303, Final EIS, BLM, CA, Calico Solar Project, Proposed Solar Thermal Electricity Generation Facility Located Public Lands, Construction and Operation, Right-ofWay Grant, San Bernardino County, CA, Wait Period Ends: 09/07/2010, Contact: Jim Stobaugh 775–861–6478. Amended Notices EIS No. 20100259, Draft EIS, FAA, RI, Theodore Francis Green Airport Improvement Program, Proposing Improvements to Enhance Safety and the Efficiency of the Airport and the New England Regional Airport System, City of Warwick, Kent County, RI, Comment Period Ends: 09/15/2010, Contact: Richard Doucette 781–238–7613. Revision to FR Notice Published 07/ 26/2010: Extending Comment Period from 08/30/2010 to 9/15/2010. EIS No. 20100274, Draft EIS, BLM, UT, VOIDED—Kerr-McGee Oil & Gas Onshore LP (KMG), Proposes to PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 Conduit Infill Drilling to Develop the Hydrocarbon Resources Oil and Gas Leases, Application for Permit to Drill and Approval Right-of-Way Grants, Uintah County, UT, Comment Period Ends: 09/13/2010, Contact: Stephanie Howard 435–781–4400. Revision to FR Notice Published 07/ 30/2010: The above DEIS was inadvertently published in 07/30/2010. The Official Filing was Published in FR on 07/16/2010 CEQ# 20100253. Dated: August 3, 2010. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–19430 Filed 8–5–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2009–0255; FRL–8412–4] Final Test Guideline; Product Performance of Skin-applied Insect Repellents of Insect and Other Arthropods (OPPTS Test Guideline No. 810.3700); Notice of Availability Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: EPA is announcing the availability of the final test guideline for Product Performance of Skin-applied Insect Repellents of Insect and Other Arthropods Test Guidelines (OPPTS Test Guideline No. 810.3700). FOR FURTHER INFORMATION CONTACT: For general information contact: Melissa Chun, Regulatory Coordination Staff (7101M), Office of Chemical Safety and Pollution Prevention, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460– 0001; telephone number: (202) 564– 1605; e-mail address: chun.melissa@epa.gov. For technical information contact: Clara Fuentes, Biopesticides and Pollution Prevention Division (7511P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001; telephone number: (703) 308–0171; e-mail address: fuentes.clara@epa.gov. SUPPLEMENTARY INFORMATION: SUMMARY: I. Introduction This test guideline is part of a series of test guidelines (referred to hereinafter as the harmonized test guidelines) established by the Office of Chemical Safety and Pollution Prevention (OCSPP) (formerly the Office of E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 75, Number 151 (Friday, August 6, 2010)]
[Notices]
[Pages 47591-47592]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-19430]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8992-1]


Environmental Impacts Statements; Notice Of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 07/26/2010 Through 07/30/2010
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the website satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100283, Draft EIS, USFS, NM, Santa Fe National Forest Travel 
Management, Proposes to Provide for a System of Road, Trails, and Areas 
Designated for Motorized Use, Santa Fe, NM, Comment Period Ends: 09/30/
2010, Contact: Julie Bain 505-438-5443.
EIS No. 20100284, Final EIS, USFS, MT, Lower West Fork Project, To 
Treat Units in and Adjacent to the Wildland-Urban-Interface (WUI) with 
Prescribed Fire, and Commercial and Pre-Commercial Thins, West Fork 
Ranger District, Bitterroot National Forest, Ravalli County, MT, Wait 
Period Ends: 09/07/2010, Contact: Dave M. Campbell 406-821-3269
EIS No. 20100285, Draft EIS, WAPA, SD, Groton Generation Station (GGS) 
Project, Proposes to Modify its Interconnection Agreement, Basin 
Electric Power Cooperative, for the (GGS) to Eliminate 50-Megawatts 
(MW) Annual Average Operating Limit, Brown County, SD, Comment Period 
Ends: 09/20/2010, Contact: Erika Walters 720-962-7279.
EIS No. 20100286, Draft EIS, FHWA, SC, Mark Clark Expressway Extension 
Project, Proposed Construction from the Interchange at I-526 and U.S. 
17 to the James Island Connector, Charleston County, SC, Comment Period 
Ends: 09/30/2010, Contact: Patrick Tyndall 803-765-5460.
EIS No. 20100287, Final EIS, NPS, NY, Roosevelt-Vanderbilt National 
Historic Sites, General Management Plan, Implementation, Hyde Park, NY, 
Wait Period Ends: 09/07/2010, Contact: Marjorie Smith 339-223-0131.
EIS No. 20100288, Final EIS, BIA, OR, Cascade Locks Resort and Casino 
Project, Application for the Fee-to-Trust Transfer of 25 Acres of Land 
within the City of Cascade Locks, Confederated Tribes of the Warn 
Springs Reservation of Oregon, Cascade Locks, Hood River County, OR, 
Wait Period Ends: 09/07/2010, Contact: Scott Aikin 503-231-6883.
EIS No. 20100289, Draft EIS, USACE, CA, San Clemente Shoreline 
Protection Project, To Provide Shore Protection Through Nourishment of 
the Beach at the San Clemente Pier, San Clemente, CA, Comment Period 
Ends: 09/20/2010, Contact: Thomas W. Keeney 213-452-3875.

[[Page 47592]]

EIS No. 20100290, Final EIS, FHWA, MN, Trunk Highway 23 and US Highway 
71 Project, Construction of One or More Grade-Separated Bridge 
Crossings, Dovre Township, Northeast of Wilmar County, Kandiyohi, MN, 
Wait Period Ends: 09/07/2010, Contact: Philip Forst 651-291-6110.
EIS No. 20100291, Draft EIS, USFS, CA, Sequoia National Forest Plan 
Amendment, Giant Sequoia National Monument, Comprehensive Management 
Plan, Implementation, CA, Comment Period Ends: 11/03/2010, Contact: 
Anne Thomas 559-784-1500 ext. 1164.
EIS No. 20100292, Final EIS, BLM, CA, Ivanpah Solar Electric Generating 
System (07-AFC-5) Project, Proposal to Construct a 400-m Megawatt 
Concentrated Solar Power Tower, Thermal-Electric Power Plant, San 
Bernardino County, CA, Wait Period Ends: 09/07/2010, Contact: Tom 
Hurshman 970-240-5345.
EIS No. 20100293, Final EIS, USN, CA, Marine Corps Base Camp Pendleton 
Basewide Utilities Infrastructure Construct and Operate Six Utility 
Infrastructure Project, San Diego County, CA, Wait Period Ends: 09/07/
2010, Contact: Jesse Martinez 619-532-3844.
EIS No. 20100294, Final EIS, USN, FL, Renewal of Authorization to Use 
Pinecastle Range, New Information that was not Available in the 2002 
FEIS, Continued Use of the Range for a 20 Year Period, Special Use 
Permit Issuance, Ocala National Forest, Marion and Lake Counties, FL, 
Wait Period Ends: 09/07/2010, Contact: Tom Currin 904-542-6301.
EIS No. 20100295, Final EIS, FHWA, OR, Sellwood Bridge Project, 
Rehabilitate or Replace the Bridge Crosses the Willamette River on 
Southeast Tacoma Street and Oregon State Highway 43, Funding, Multnomah 
County, OR, Wait Period Ends: 09/07/2010, Contact: Jeffrey Graham 503-
587-4727.
EIS No. 20100296, Draft EIS, NOAA, 00, Columbia River Basin Hatchery 
Operations and the Funding of Mitchell Act Hatchery Program, To 
Authorize the Establishment, Operation and Maintenance of One or More 
Hatchery Facilities, OR, WA and ID, Comment Period Ends: 11/04/2010, 
Contact: Allyson Purcell 503-736-4736.
EIS No. 20100297, Final EIS, NRC, NE, Generic--License Renewal of 
Nuclear Plants, Regarding Cooper Nuclear Station, Unit 1, Supplement 41 
to NUREG-1437, Nemaha County, NE, Wait Period Ends: 09/07/2010, 
Contact: Bennett M. Brady 301-415-2981.
EIS No. 20100298, Final EIS, USFS, WV, Allegheny Wood Product Easement, 
Proposes to Convey an Easement of Right-of-Way along the Railroad Grade 
located in the Blackwater Canyon Area, Monongahela National Forest, 
Tucker County, WV, Wait Period Ends: 09/07/2010, Contact: David Ede 
304-636-1800 Ext 233.
EIS No. 20100299, Draft EIS, FERC, CA, McCloud-Pit Hydroelectric 
Project, (Project No. 2106) Application to Relicense its 368-Megawatt 
(MW), McCloud and Pit Rivers, Shasta County, CA, Comment Period Ends: 
09/28/2010, Contact: Mary O'Driscoll 1-866-208-3372.
EIS No. 20100300, Draft EIS, BIA, CA, Cloverdale Rancheria of Pomo 
Indians (Tribe) Fee-to-Trust and Resort Casino Project, Taking Six 
Parcels into Federal Trust, Implementation, Sonoma County, CA, Comment 
Period Ends: 10/20/2010, Contact: John Rydzik 916-978-6051.
EIS No. 20100301, Final EIS, BIA, CA, Enterprise Rancheria Gaming 
Facility and Hotel Fee-To-Trust Acquisition Project, Implementation, 
Federal Trust, Estom Yumeka Maida Tribe, Yuba County, CA, Wait Period 
Ends: 09/07/2010, Contact: John Rydzik 916-978-6051.
EIS No. 20100302, Final EIS, BIA, CA, North Fork Rancheria of Mono 
Indians Fee-to-Trust and Casino/Hotel Project, Proposed 305-Acres-Fee-
to-Trust Land Acquisition in Unincorporated Madera County, CA, Wait 
Period Ends: 09/07/2010, Contact: John Rydzik 916-978-6051.
EIS No. 20100303, Final EIS, BLM, CA, Calico Solar Project, Proposed 
Solar Thermal Electricity Generation Facility Located Public Lands, 
Construction and Operation, Right-of-Way Grant, San Bernardino County, 
CA, Wait Period Ends: 09/07/2010, Contact: Jim Stobaugh 775-861-6478.

Amended Notices

EIS No. 20100259, Draft EIS, FAA, RI, Theodore Francis Green Airport 
Improvement Program, Proposing Improvements to Enhance Safety and the 
Efficiency of the Airport and the New England Regional Airport System, 
City of Warwick, Kent County, RI, Comment Period Ends: 09/15/2010, 
Contact: Richard Doucette 781-238-7613.

    Revision to FR Notice Published 07/26/2010: Extending Comment 
Period from 08/30/2010 to 9/15/2010.
EIS No. 20100274, Draft EIS, BLM, UT, VOIDED--Kerr-McGee Oil & Gas 
Onshore LP (KMG), Proposes to Conduit Infill Drilling to Develop the 
Hydrocarbon Resources Oil and Gas Leases, Application for Permit to 
Drill and Approval Right-of-Way Grants, Uintah County, UT, Comment 
Period Ends: 09/13/2010, Contact: Stephanie Howard 435-781-4400.
    Revision to FR Notice Published 07/30/2010: The above DEIS was 
inadvertently published in 07/30/2010. The Official Filing was 
Published in FR on 07/16/2010 CEQ 20100253.

    Dated: August 3, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-19430 Filed 8-5-10; 8:45 am]
BILLING CODE 6560-50-P