New York Tidal Energy Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 47586-47587 [2010-19380]
Download as PDF
47586
Federal Register / Vol. 75, No. 151 / Friday, August 6, 2010 / Notices
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Vermont State
Historic Preservation Officer (SHPO), as
required by § 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36, CFR, at 800.4.
q. Procedural schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate (i.e. if scoping
is waived, the schedule would be
shortened).
Issue Deficiency Letter—October 2010
Issue Acceptance letter—January 2011
Issue Scoping Document—February
2011
Notice of application is ready for
environmental analysis—April 2011
Notice of the availability of the EA—
November 2011
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–19381 Filed 8–5–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13730–000]
New York Tidal Energy Company;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
sroberts on DSKD5P82C1PROD with NOTICES
July 30, 2010.
On May 12, 2010, New York Tidal
Energy Company filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Astoria Tidal Energy Project, located on
the East River, in New York City, New
York. The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) 50 to 150 Tidal In
Stream Energy Conversion (TISEC)
devices consisting of, (2) rotating
VerDate Mar<15>2010
16:35 Aug 05, 2010
Jkt 220001
propeller blades, (3) integrated
generators with a capacity of 0.5 to 2.0
MW, (4) anchoring systems, (5) mooring
lines, and (6) interconnection
transmission lines. The project is
estimated to have an annual generation
of 8.76 gigawatt-hours per-unit per-year,
which would be sold to a local utility.
Applicant Contact: Daniel Power,
Oceana Energy Company, 1785
Massachusetts Avenue, NW., Suite 100,
Washington, DC 20036; phone: (202)
465–6405.
FERC Contact: Timothy Konnert, 202–
502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘eComment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13730) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–19382 Filed 8–5–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12665–004]
New York Tidal Energy Company;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
July 30, 2010.
On May 12, 2010, New York Tidal
Energy Company filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
East River Tidal Energy Pilot Project,
located on the East River, in New York
City, New York. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A 2-meter-diameter 20
kW capacity hydrokinetic device during
Phase 1, which would be replaced by a
6-meter-diameter 200 kW device in
Phase 2; (2) a 1,300-foot transmission
cable that would interconnect with the
existing Wards Island Park System; and
(3) appurtenant facilities for operating
and maintaining the project. Based on
the proposed 250 hours of testing
operation per-year, the project is
estimated to have an annual generation
of 5 megawatt-hours per-year, which
would be sold to a local utility.
Applicant Contact: Daniel Power,
Oceana Energy Company, 1785
Massachusetts Avenue, NW., Suite 100,
Washington, DC 20036; phone: (202)
465–6405.
FERC Contact: Timothy Konnert, 202–
502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘eComment.’’
E:\FR\FM\06AUN1.SGM
06AUN1
Federal Register / Vol. 75, No. 151 / Friday, August 6, 2010 / Notices
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–12665) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–19380 Filed 8–5–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–475–000]
Wabash Gas Storage LLC; Notice of
Application
sroberts on DSKD5P82C1PROD with NOTICES
July 30, 2010.
Take notice that on July 29, 2010,
Wabash Gas Storage LLC (Petitioner),
1044 North 115th Street, Suite 400,
Omaha, NE 68154–4446, filed in Docket
No. CP10–475–000, a petition for
Exemption of Temporary Acts and
Operations from Certificate
Requirements, pursuant to Rule
207(a)(5) of the Commission’s Rules of
Practice and Procedure, and section
7(c)(1)(B) of the Natural Gas Act (NGA),
to perform specific temporary activity
related to drill site preparation and the
drilling of two stratigraphic test wells
located in Edgar County, Illinois to
determine the feasibility of redeveloping
the currently abandoned Elbridge and
Nevins storage facilities for natural gas
storage, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, call (202)
502–8659 or TTY, (202) 208–3676.
Any questions regarding this
application should be directed to
VerDate Mar<15>2010
16:35 Aug 05, 2010
Jkt 220001
Douglas B. Lauver, Vice President,
Wabash Gas Storage LLC, 1044 North
115th Street, Suite 400, Omaha, NE
68154–4446, or by calling (402) 691–
9711 (telephone) or (402) 691–9727
(fax), dlauver@tenaska.com, or to J.
Patrick Nevins or Christopher A.
Schindler, Hogan Lovells US LLP,
Columbia Square, 555 13th Street, NW.,
Washington, DC 20004, or by calling
(202) 637–6441 (telephone) or (202)
637–5910 (fax),
jpnevins@hoganlovells.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
PO 00000
Frm 00065
Fmt 4703
Sfmt 9990
47587
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: August 13, 2010.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–19378 Filed 8–5–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 75, Number 151 (Friday, August 6, 2010)]
[Notices]
[Pages 47586-47587]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-19380]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12665-004]
New York Tidal Energy Company; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
July 30, 2010.
On May 12, 2010, New York Tidal Energy Company filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act, proposing to study the feasibility of the East River Tidal Energy
Pilot Project, located on the East River, in New York City, New York.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A 2-meter-
diameter 20 kW capacity hydrokinetic device during Phase 1, which would
be replaced by a 6-meter-diameter 200 kW device in Phase 2; (2) a
1,300-foot transmission cable that would interconnect with the existing
Wards Island Park System; and (3) appurtenant facilities for operating
and maintaining the project. Based on the proposed 250 hours of testing
operation per-year, the project is estimated to have an annual
generation of 5 megawatt-hours per-year, which would be sold to a local
utility.
Applicant Contact: Daniel Power, Oceana Energy Company, 1785
Massachusetts Avenue, NW., Suite 100, Washington, DC 20036; phone:
(202) 465-6405.
FERC Contact: Timothy Konnert, 202-502-6359.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the
``eFiling'' link. For a simpler method of submitting text only
comments, click on ``eComment.''
[[Page 47587]]
For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, for
TTY, contact (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and eight copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12665) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Nathaniel J. Davis, Sr.,
Deputy Secretary.