Notice of Intent To Prepare an Environmental Impact Statement and Resource Management Plan Amendment for the Proposed Modification to the Thompson Creek Mine Plan of Operations, Section 404 Clean Water Act Permit Application, and Public Land Disposal, Custer and Bannock Counties, ID, 45652-45653 [2010-19054]
Download as PDF
45652
Federal Register / Vol. 75, No. 148 / Tuesday, August 3, 2010 / Notices
The BLM will evaluate identified
issues to be addressed in the plan, and
will place them into one of three
categories:
1. Issues to be resolved in the plan;
2. Issues to be resolved through policy
or administrative action; or
3. Issues beyond the scope of this
plan. A public comment that suggests
developing management for one of the
resource uses from which the area was
withdrawn by the legislation would
likely fall within this category.
The BLM will provide an explanation
in the Draft RMP/EIS as to why an issue
was placed in category two or three. The
public is also encouraged to help
identify any management questions and
concerns that should be addressed in
the plan. The BLM will work
collaboratively with interested parties to
identify the management decisions that
are best suited to local, regional, and
national needs and concerns.
The BLM will use an interdisciplinary
approach to develop the plan in order
to consider the variety of resource issues
and concerns identified. Specialists
with expertise in the following
disciplines will be involved in the
planning process: rangeland
management, minerals and geology,
forestry, outdoor recreation, wilderness,
archaeology, paleontology, wildlife and
fisheries, lands and realty, hydrology,
soils, sociology and economics.
Authority: 40 CFR 1501.7, 43 CFR 1610.
Lynn E. Rust,
Acting State Director.
[FR Doc. 2010–19060 Filed 8–2–10; 8:45 am]
BILLING CODE 4310–JB–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLIDI03000.L71220000.EX0000.
XXXX.LVTFD0977180; IDI–33145, IDI–35728]
Notice of Intent To Prepare an
Environmental Impact Statement and
Resource Management Plan
Amendment for the Proposed
Modification to the Thompson Creek
Mine Plan of Operations, Section 404
Clean Water Act Permit Application,
and Public Land Disposal, Custer and
Bannock Counties, ID
Bureau of Land Management,
Interior.
ACTION: Notice of Intent.
erowe on DSK5CLS3C1PROD with NOTICES
AGENCY:
In compliance with the
National Environmental Policy Act of
1969, as amended (NEPA), and the
Federal Land Policy and Management
Act of 1976, as amended (FLPMA), the
SUMMARY:
VerDate Mar<15>2010
14:41 Aug 02, 2010
Jkt 220001
Bureau of Land Management (BLM),
Challis Field Office, Idaho intends to
prepare an Environmental Impact
Statement (EIS) to analyze the potential
environmental effects of the proposed
approval by the BLM and U.S. Forest
Service (Forest Service) of a modified
mining plan of operations (MMPO) for
the Thompson Creek molybdenum mine
in Custer County, Idaho and the
potential for disposal of BLMadministered public lands. The MMPO
would allow an approximate 15-year
extension of the mine life and an
expansion of some facilities, requiring
additional surface disturbance on
approximately 350 acres of Federal
lands and approximately 80 acres of
private land. The EIS will include
analysis of the potential environmental
effects to waters of the United States
that could occur under the MMPO. The
Thompson Creek Mining Company
(TCMC), has also proposed to exchange
900 acres of private lands owned by
TCMC in Custer and Bannock counties
for 5,000 acres of BLM-administered
public land in the vicinity of the mine
in Custer County, including the BLMadministered public land involved in
the MMPO. The EIS will also evaluate
a proposed amendment to the BLM
Challis Field Office 1999 Resource
Management Plan (RMP), to identify if
the public land involved would be
available for disposal pursuant to the
FLPMA.
DATES: This notice initiates the public
scoping process for the EIS. To be
included in the Draft EIS comments
must be submitted in writing using any
of the methods described in the
ADDRESSES section below until 30 days
after publication of this notice in the
Federal Register or 30 days after the last
public meeting held to obtain scoping
input, whichever is later. When a public
meeting is held, documentation of that
meeting and the list of attendees will be
available to the public for 30 days so
that any participant who wishes to
clarify the views he or she expressed
may do so. The date(s) and location(s)
of any public scoping meetings will be
announced at least 15 days in advance
of the meetings through local media,
newspapers, individual mailing, and the
following BLM Web site: https://www.
blm.gov/id/st/en/info/nepa/nepa/
thompson_creek_mine.html. Additional
opportunities for public participation
will be provided upon publication of
the Draft EIS.
ADDRESSES: You may submit comments
regarding the proposed actions and
planning criteria, and request to have
your name added to the mailing list for
the EIS by any of the following methods:
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
• E-mail: tcm_eis@jbr.com;
• Fax: (801) 942–1852, attention
Brian Buck; or
• Mail: Thompson Creek Mine EIS,
c/o Brian Buck, JBR Environmental
Consultants, 8160 South Highland
Drive, Sandy, Utah 84093.
The public may also examine
documents pertinent to the proposed
actions at the BLM Challis Field Office,
1151 Blue Mountain Road, Challis,
Idaho 83226 during regular business
hours (7:45 a.m. to 4:30 p.m.), Monday
through Friday, except Federal holidays.
Project information and documents will
also be available on the following Web
site: https://www.blm.gov/id/st/en/info/
nepa/nepa/thompson_creek_mine.html.
FOR FURTHER INFORMATION CONTACT:
BLM Challis Field Office, telephone
(208) 879–6200; address 1151 Blue
Mountain Road, Challis, Idaho 83226.
Individuals who use telecommunication
devices for the deaf (TDD) may call the
Federal Information Relay Service
(FIRS) at (800) 877–8339 between 8 a.m.
and 8 p.m., Eastern Time, Monday
through Friday.
SUPPLEMENTARY INFORMATION: TCMC
owns and operates the Thompson Creek
molybdenum mine, located 7 miles
northwest of Clayton and 21 miles
southwest of Challis in Custer County,
Idaho. The mine has been in operation
since 1981 and is permitted for about
3,400 acres of surface disturbance, of
which approximately 2,300 acres are
private land and approximately 1,100
acres are Federal lands administered by
the BLM and the Forest Service.
TCMC has proposed to modify its
mining plan of operations. The
proposed MMPO would allow mining to
be extended by about 15 years, ending
around 2030. The MMPO would expand
two waste rock storage facilities and the
tailings impoundment, requiring
additional surface disturbance on about
350 acres of Federal lands, and 80 acres
of private land. As a separate action
TCMC has proposed to exchange 900
acres of private land owned by TCMC in
Custer and Bannock counties for 5,000
acres of BLM-administered land near
the mine in Custer County. The BLM is
currently conducting a feasibility
analysis of the proposed exchange.
Upon completion of the feasibility
analysis, the BLM may enter into an
Agreement to Initiate a Land Exchange
with TCMC and subsequently publish a
separate Notice of Exchange Proposal
(NOEP) in the newspapers servicing
Custer and Bannock counties. Public
comments received in response to the
NOEP would be considered in the EIS
if the NOEP is issued.
E:\FR\FM\03AUN1.SGM
03AUN1
erowe on DSK5CLS3C1PROD with NOTICES
Federal Register / Vol. 75, No. 148 / Tuesday, August 3, 2010 / Notices
In response to these proposals (1) The
BLM will decide whether to approve the
portion of the MMPO involving BLMadministered public land under BLM
regulations at 43 CFR 3809; (2) the
Forest Service will decide whether to
approve the portion of the MMPO
involving National Forest System lands
under Forest Service regulations at 36
CFR part 228 subpart A; (3) the USACE
will decide whether to issue a permit
under section 404 of the CWA and
USACE regulations at 33 CFR part 320
to discharge fill materials into waters of
the United States; (4) the BLM will
decide whether to amend the Challis
RMP pursuant to Section 202 of FLPMA
and BLM regulations at 43 CFR part
1600, and identify the public land
involved for disposal; and (5) the BLM
will decide whether to approve a land
disposal action.
The authorizations by the Forest
Service for National Forest System lands
and USACE may be required to
implement the MMPO regardless of
whether the BLM approves a land
disposal action. If TCMC obtains title to
all of the BLM-administered land within
the mine area, the BLM’s approval of the
MMPO would no longer be necessary
because the BLM does not regulate
mining operations on private land. On
the other hand, if TCMC obtains title to
only some of the BLM-administered
land involved with the MMPO, then any
continuing mining operations on BLMadministered land would require BLM
authorization under 43 CFR part 3809.
The purpose and need of the
proposed actions are for (1) The BLM to
respond to TCMC’s proposed MMPO,
which would enable TCMC to continue
reasonable development of the existing
mine in compliance with BLM laws and
regulations (FLPMA, 43 CFR 3809); (2)
the Forest Service to similarly respond
to the MMPO in compliance with Forest
Service laws and regulations (Organic
Act of 1897; 36 CFR 228, Subpart A); (3)
the USACE to respond to TCMC’s
application for a permit to discharge fill
materials into waters of the United
States, as necessary in the MMPO, in
compliance with USACE laws and
regulations (CWA, 33 CFR 320); (4) the
BLM to consider amending the Challis
RMP to allow a land disposal in
compliance with Section 102 of FLPMA,
and (5) the BLM to respond to TCMC’s
proposal for a land exchange and
determine if a public land disposal
would be in the public interest pursuant
to FLPMA.
The No Action alternative (i.e.,
completion of mining and reclamation
under the current mining plan of
operations) and alternatives that
consider the RMP amendment and
VerDate Mar<15>2010
14:41 Aug 02, 2010
Jkt 220001
various aspects of the proposed MMPO
and public land disposal will be
analyzed. Alternatives identified to date
for the MMPO include using different
locations for waste rock storage and
alternative reclamation measures.
Alternatives identified to date for the
possible public land disposal include
exchange of private land for public land;
how the public and private lands would
be managed if these lands were
exchanged, including analysis of
potential impacts of conducting the
mining operations identified in the
proposed MMPO under the applicable
statutory and regulatory authority; and
possible variations in the amount of
public land and/or restrictions on the
public land that might be exchanged.
The planning criteria for the RMP
amendment would include that lands
identified for disposal would serve the
national interest and that newly
acquired lands or interests in lands
would be managed for their highest
potential or for the purposes for which
they were acquired.
By this notice, the BLM is complying
with the requirements in 43 CFR
1610.2(c) to notify the public of
potential amendments to land use plans,
predicated on the analysis in the EIS.
The BLM will integrate the land use
planning process with the NEPA
process for the EIS. The BLM will
utilize and coordinate the NEPA
commenting process to satisfy the
public involvement for section 106 of
the National Historic Preservation Act
(16 U.S.C. 470f) as provided for in 36
CFR 800.2(d)(3).
The BLM is the lead Federal agency
for the NEPA analysis process and
preparation of the EIS. The BLM
anticipates that the Forest Service, the
USACE; the U.S. Environmental
Protection Agency, the Idaho
Department of Environmental Quality,
and the Idaho Department of will be
cooperating agencies. Other cooperating
agencies may be identified during the
scoping process.
Native American tribal consultation
will be conducted in accordance with
policy, and tribal concerns will be given
due consideration, including impacts on
Indian trust assets. Federal, State, and
local agencies, along with other
stakeholders that may be interested or
affected by the proposed actions subject
to the EIS are invited to participate in
the scoping process and, if eligible, may
request or be requested by the BLM to
participate as a cooperating agency.
The public is invited to submit
comments and resource information as
well as identify issues, concerns and
alternatives to be analyzed in the EIS.
Public input should be as specific as
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
45653
possible (i.e., clearly articulate concerns
and contentions) to best assist in the
NEPA process. Before including your
address, phone number, e-mail address,
or other personal identifying
information in your comment, you
should be aware that your entire
comment—including your personal
identifying information—may be made
publicly available at any time. While
you may ask us in your comment to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 42 U.S.C. 4321 et seq.; 33 CFR
325.3; 43 CFR 1610.2.
David Rosenkrance,
Field Manager.
[FR Doc. 2010–19054 Filed 8–2–10; 8:45 am]
BILLING CODE 4310–GG–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLCAD070000 L16100000.DP0000]
Notice of Re-Opening of Comment
Period for the Draft Imperial Sand
Dunes Recreation Area Management
Plan and Draft Environmental Impact
Statement, California
Bureau of Land Management,
Interior.
ACTION: Notice.
AGENCY:
The Bureau of Land
Management (BLM) announces the reopening of the comment period on the
Draft Imperial Sand Dunes Recreation
Area Management Plan (RAMP) and
Draft Environmental Impact Statement
(EIS). The original notice published in
the Federal Register on March 26, 2010
[75 FR 14623] provided for a comment
period ending on June 24, 2010. The
BLM is re-opening the comment period
to end on August 9, 2010.
DATES: To assure that comments will be
considered, the BLM must receive
written comments on the Draft RAMP/
EIS by August 9, 2010.
ADDRESSES: You may submit comments
at the public meetings or by any of the
following methods:
• E-mail: caisdrmp@ca.blm.gov.
• Fax: (760) 337–4490.
• Mail: 1661 So. 4th St., El Centro,
California 92243.
Copies of the Draft Imperial Sand
Dunes RAMP/EIS are available in the El
Centro Field Office at the above address
and at the BLM California State Office,
2800 Cottage Way, Sacramento,
California 95825. Interested persons
may also review the Draft Resource
SUMMARY:
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 75, Number 148 (Tuesday, August 3, 2010)]
[Notices]
[Pages 45652-45653]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-19054]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLIDI03000.L71220000.EX0000.XXXX.LVTFD0977180; IDI-33145, IDI-35728]
Notice of Intent To Prepare an Environmental Impact Statement and
Resource Management Plan Amendment for the Proposed Modification to the
Thompson Creek Mine Plan of Operations, Section 404 Clean Water Act
Permit Application, and Public Land Disposal, Custer and Bannock
Counties, ID
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of Intent.
-----------------------------------------------------------------------
SUMMARY: In compliance with the National Environmental Policy Act of
1969, as amended (NEPA), and the Federal Land Policy and Management Act
of 1976, as amended (FLPMA), the Bureau of Land Management (BLM),
Challis Field Office, Idaho intends to prepare an Environmental Impact
Statement (EIS) to analyze the potential environmental effects of the
proposed approval by the BLM and U.S. Forest Service (Forest Service)
of a modified mining plan of operations (MMPO) for the Thompson Creek
molybdenum mine in Custer County, Idaho and the potential for disposal
of BLM-administered public lands. The MMPO would allow an approximate
15-year extension of the mine life and an expansion of some facilities,
requiring additional surface disturbance on approximately 350 acres of
Federal lands and approximately 80 acres of private land. The EIS will
include analysis of the potential environmental effects to waters of
the United States that could occur under the MMPO. The Thompson Creek
Mining Company (TCMC), has also proposed to exchange 900 acres of
private lands owned by TCMC in Custer and Bannock counties for 5,000
acres of BLM-administered public land in the vicinity of the mine in
Custer County, including the BLM-administered public land involved in
the MMPO. The EIS will also evaluate a proposed amendment to the BLM
Challis Field Office 1999 Resource Management Plan (RMP), to identify
if the public land involved would be available for disposal pursuant to
the FLPMA.
DATES: This notice initiates the public scoping process for the EIS. To
be included in the Draft EIS comments must be submitted in writing
using any of the methods described in the ADDRESSES section below until
30 days after publication of this notice in the Federal Register or 30
days after the last public meeting held to obtain scoping input,
whichever is later. When a public meeting is held, documentation of
that meeting and the list of attendees will be available to the public
for 30 days so that any participant who wishes to clarify the views he
or she expressed may do so. The date(s) and location(s) of any public
scoping meetings will be announced at least 15 days in advance of the
meetings through local media, newspapers, individual mailing, and the
following BLM Web site: https://www.blm.gov/id/st/en/info/nepa/nepa/thompson_creek_mine.html. Additional opportunities for public
participation will be provided upon publication of the Draft EIS.
ADDRESSES: You may submit comments regarding the proposed actions and
planning criteria, and request to have your name added to the mailing
list for the EIS by any of the following methods:
E-mail: tcm_eis@jbr.com;
Fax: (801) 942-1852, attention Brian Buck; or
Mail: Thompson Creek Mine EIS, c/o Brian Buck, JBR
Environmental Consultants, 8160 South Highland Drive, Sandy, Utah
84093.
The public may also examine documents pertinent to the proposed
actions at the BLM Challis Field Office, 1151 Blue Mountain Road,
Challis, Idaho 83226 during regular business hours (7:45 a.m. to 4:30
p.m.), Monday through Friday, except Federal holidays. Project
information and documents will also be available on the following Web
site: https://www.blm.gov/id/st/en/info/nepa/nepa/thompson_creek_mine.html.
FOR FURTHER INFORMATION CONTACT: BLM Challis Field Office, telephone
(208) 879-6200; address 1151 Blue Mountain Road, Challis, Idaho 83226.
Individuals who use telecommunication devices for the deaf (TDD) may
call the Federal Information Relay Service (FIRS) at (800) 877-8339
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday.
SUPPLEMENTARY INFORMATION: TCMC owns and operates the Thompson Creek
molybdenum mine, located 7 miles northwest of Clayton and 21 miles
southwest of Challis in Custer County, Idaho. The mine has been in
operation since 1981 and is permitted for about 3,400 acres of surface
disturbance, of which approximately 2,300 acres are private land and
approximately 1,100 acres are Federal lands administered by the BLM and
the Forest Service.
TCMC has proposed to modify its mining plan of operations. The
proposed MMPO would allow mining to be extended by about 15 years,
ending around 2030. The MMPO would expand two waste rock storage
facilities and the tailings impoundment, requiring additional surface
disturbance on about 350 acres of Federal lands, and 80 acres of
private land. As a separate action TCMC has proposed to exchange 900
acres of private land owned by TCMC in Custer and Bannock counties for
5,000 acres of BLM-administered land near the mine in Custer County.
The BLM is currently conducting a feasibility analysis of the proposed
exchange. Upon completion of the feasibility analysis, the BLM may
enter into an Agreement to Initiate a Land Exchange with TCMC and
subsequently publish a separate Notice of Exchange Proposal (NOEP) in
the newspapers servicing Custer and Bannock counties. Public comments
received in response to the NOEP would be considered in the EIS if the
NOEP is issued.
[[Page 45653]]
In response to these proposals (1) The BLM will decide whether to
approve the portion of the MMPO involving BLM-administered public land
under BLM regulations at 43 CFR 3809; (2) the Forest Service will
decide whether to approve the portion of the MMPO involving National
Forest System lands under Forest Service regulations at 36 CFR part 228
subpart A; (3) the USACE will decide whether to issue a permit under
section 404 of the CWA and USACE regulations at 33 CFR part 320 to
discharge fill materials into waters of the United States; (4) the BLM
will decide whether to amend the Challis RMP pursuant to Section 202 of
FLPMA and BLM regulations at 43 CFR part 1600, and identify the public
land involved for disposal; and (5) the BLM will decide whether to
approve a land disposal action.
The authorizations by the Forest Service for National Forest System
lands and USACE may be required to implement the MMPO regardless of
whether the BLM approves a land disposal action. If TCMC obtains title
to all of the BLM-administered land within the mine area, the BLM's
approval of the MMPO would no longer be necessary because the BLM does
not regulate mining operations on private land. On the other hand, if
TCMC obtains title to only some of the BLM-administered land involved
with the MMPO, then any continuing mining operations on BLM-
administered land would require BLM authorization under 43 CFR part
3809.
The purpose and need of the proposed actions are for (1) The BLM to
respond to TCMC's proposed MMPO, which would enable TCMC to continue
reasonable development of the existing mine in compliance with BLM laws
and regulations (FLPMA, 43 CFR 3809); (2) the Forest Service to
similarly respond to the MMPO in compliance with Forest Service laws
and regulations (Organic Act of 1897; 36 CFR 228, Subpart A); (3) the
USACE to respond to TCMC's application for a permit to discharge fill
materials into waters of the United States, as necessary in the MMPO,
in compliance with USACE laws and regulations (CWA, 33 CFR 320); (4)
the BLM to consider amending the Challis RMP to allow a land disposal
in compliance with Section 102 of FLPMA, and (5) the BLM to respond to
TCMC's proposal for a land exchange and determine if a public land
disposal would be in the public interest pursuant to FLPMA.
The No Action alternative (i.e., completion of mining and
reclamation under the current mining plan of operations) and
alternatives that consider the RMP amendment and various aspects of the
proposed MMPO and public land disposal will be analyzed. Alternatives
identified to date for the MMPO include using different locations for
waste rock storage and alternative reclamation measures. Alternatives
identified to date for the possible public land disposal include
exchange of private land for public land; how the public and private
lands would be managed if these lands were exchanged, including
analysis of potential impacts of conducting the mining operations
identified in the proposed MMPO under the applicable statutory and
regulatory authority; and possible variations in the amount of public
land and/or restrictions on the public land that might be exchanged.
The planning criteria for the RMP amendment would include that lands
identified for disposal would serve the national interest and that
newly acquired lands or interests in lands would be managed for their
highest potential or for the purposes for which they were acquired.
By this notice, the BLM is complying with the requirements in 43
CFR 1610.2(c) to notify the public of potential amendments to land use
plans, predicated on the analysis in the EIS. The BLM will integrate
the land use planning process with the NEPA process for the EIS. The
BLM will utilize and coordinate the NEPA commenting process to satisfy
the public involvement for section 106 of the National Historic
Preservation Act (16 U.S.C. 470f) as provided for in 36 CFR
800.2(d)(3).
The BLM is the lead Federal agency for the NEPA analysis process
and preparation of the EIS. The BLM anticipates that the Forest
Service, the USACE; the U.S. Environmental Protection Agency, the Idaho
Department of Environmental Quality, and the Idaho Department of will
be cooperating agencies. Other cooperating agencies may be identified
during the scoping process.
Native American tribal consultation will be conducted in accordance
with policy, and tribal concerns will be given due consideration,
including impacts on Indian trust assets. Federal, State, and local
agencies, along with other stakeholders that may be interested or
affected by the proposed actions subject to the EIS are invited to
participate in the scoping process and, if eligible, may request or be
requested by the BLM to participate as a cooperating agency.
The public is invited to submit comments and resource information
as well as identify issues, concerns and alternatives to be analyzed in
the EIS. Public input should be as specific as possible (i.e., clearly
articulate concerns and contentions) to best assist in the NEPA
process. Before including your address, phone number, e-mail address,
or other personal identifying information in your comment, you should
be aware that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you may
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 42 U.S.C. 4321 et seq.; 33 CFR 325.3; 43 CFR 1610.2.
David Rosenkrance,
Field Manager.
[FR Doc. 2010-19054 Filed 8-2-10; 8:45 am]
BILLING CODE 4310-GG-P