UGI Central Penn Gas, Inc.; Notice of Compliance Filing, 45108 [2010-18842]

Download as PDF 45108 Federal Register / Vol. 75, No. 147 / Monday, August 2, 2010 / Notices If the project is not subject to section 15 of the FPA, notice is hereby given that Idaho Power Company is authorized to continue operation of the Swan Falls Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Kimberly D. Bose, Secretary. [FR Doc. 2010–18843 Filed 7–30–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Monday, August 9, 2010. Kimberly D. Bose, Secretary. [Docket No. PR10–63–000; Docket No. PR10–64–000; Docket No. PR10–66–000] BILLING CODE 6717–01–P erowe on DSK5CLS3C1PROD with NOTICES July 26, 2010. Take notice that on July 19, 2010, July 20, 2010, and July 23, 2010, respectively the applicants listed above submitted their baseline filing of its Statement of Operating Conditions for services provided under section 311 of the Natural Gas Policy Act of 1978 (NGPA). Any person desiring to participate in this rate proceeding must file a motion to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. VerDate Mar<15>2010 15:04 Jul 30, 2010 Jkt 220001 [Docket No. PR09–27–003] UGI Central Penn Gas, Inc.; Notice of Compliance Filing July 23, 2010. Take notice that on July 14, 2010, UGI Central Penn Gas, Inc. (Central Penn) filed its Statement Operating Conditions in compliance with the June 14, 2010 Letter Order approving a Stipulation and Agreement of Settlement and pursuant to section 284.123(e) of the Commission’s regulations. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. Fmt 4703 BILLING CODE 6717–01–P Sfmt 4703 Federal Energy Regulatory Commission East Tennessee Natural Gas, LLC; Notice of Availability of the Environmental Assessment for the Proposed Northeastern Tennessee Project Federal Energy Regulatory Commission Frm 00022 [FR Doc. 2010–18842 Filed 7–30–10; 8:45 am] [Docket No. CP10–89–000] DEPARTMENT OF ENERGY PO 00000 Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY [FR Doc. 2010–18846 Filed 7–30–10; 8:45 am] Enterprise Alabama Intrastate, LLC Yankee Gas Services Company Kinder Morgan Tejas Pipeline LLC (Not Consolidated); Notice of Baseline Filings There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Friday, July 30, 2010. July 23, 2010. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Northeastern Tennessee Project proposed by East Tennessee Natural Gas (ETNG) in the above referenced docket. ETNG requests authorization to construct, replace and abandon natural gas pipeline transmission facilities in southwestern Virginia and northeastern Tennessee to provide natural gas service for the Tennessee Valley Authority’s recently approved John Sevier Combined Cycle Plant. The EA assesses the potential environmental impacts resulting from construction and operation of the proposed Northeastern Tennessee Project in accordance with the requirements of the National Environmental Policy Act. The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The proposed Northeastern Tennessee Project includes: • Replacing approximately 11.5 miles of existing 12-inch- and 8-inch-diameter natural gas transmission pipeline with 24-inch-diameter natural gas transmission pipeline; • Installing approximately 16.4 miles of new 24-inch-diameter natural gas pipeline; E:\FR\FM\02AUN1.SGM 02AUN1

Agencies

[Federal Register Volume 75, Number 147 (Monday, August 2, 2010)]
[Notices]
[Page 45108]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-18842]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PR09-27-003]


UGI Central Penn Gas, Inc.; Notice of Compliance Filing

July 23, 2010.
    Take notice that on July 14, 2010, UGI Central Penn Gas, Inc. 
(Central Penn) filed its Statement Operating Conditions in compliance 
with the June 14, 2010 Letter Order approving a Stipulation and 
Agreement of Settlement and pursuant to section 284.123(e) of the 
Commission's regulations.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before 5 p.m. Eastern time on the specified comment 
date. Anyone filing a protest must serve a copy of that document on all 
the parties to the proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern time on Friday, July 30, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-18842 Filed 7-30-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.