Electric Quarterly Reports; Strategic Energy Management Corp.; Solaro Energy Marketing Corporation; Notice of Revocation of Market-Based Rate Tariff, 45111-45112 [2010-18840]

Download as PDF Federal Register / Vol. 75, No. 147 / Monday, August 2, 2010 / Notices interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Monday, August 9, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–18848 Filed 7–30–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–472–000] Kinder Morgan Interstate Gas Transmission LLC; Notice of Request Under Blanket Authorization erowe on DSK5CLS3C1PROD with NOTICES July 26, 2010. Take notice that on July 20, 2010, Kinder Morgan Interstate Gas Transmission LLC (KMIGT), PO Box 281304, Lakewood, Colorado 80228– 8304, filed a prior notice request pursuant to sections 157.205, 157.208, and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to replace, construct and operate certain mainline pipeline and ancillary facilities primarily to serve a new ethanol plant in Adams County, Nebraska, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. KMIGT states that as a result of wrinkle bends, which have caused the VerDate Mar<15>2010 15:04 Jul 30, 2010 Jkt 220001 pipeline to become physically deteriorated, approximately 11.4 miles of its 16-inch Franklin to Hastings Pipeline needs to be replaced. KMIGT asserts that, in response to the developing market for natural gas and to develop firm transportation to serve ethanol production facilities in the Midwest, KMIGT held an open season from July 2, 2010 through July 9, 2010 seeking support to expand its firm transportation capacity. As a result of the open season, KMIGT states that it has entered into a binding precedent agreement with Aventine Renewable Energy—Aurora West, LLC to provide up to 10,000 dekatherms per day of natural gas to serve its new ethanol plant located near Aurora, Nebraska. Accordingly, KMIGT proposes to replace 11.4 miles of the Franklin to Hastings Pipeline with 20-inch pipe to serve the increase in firm load. In addition, KMIGT proposes to construct and operate certain ancillary facilities. KMIGT estimates cost of constructing the proposed facilities is $23,511,100. Any questions regarding the application should be directed to Robert F. Harrington, Vice President, Regulatory, Kinder Morgan Interstate Gas Transmission LLC, 370 Van Gordon Street, Lakewood, Colorado 80228– 8304, by telephone (303) 763–3258, or by facsimile at (303) 984–3272, or by email at Robert_Harrington@kindermorgan.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 45111 Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. 2010–18845 Filed 7–30–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER02–2001–015; Docket No. ER00–167–000; Docket No. ER03–752–000] Electric Quarterly Reports; Strategic Energy Management Corp.; Solaro Energy Marketing Corporation; Notice of Revocation of Market-Based Rate Tariff July 23, 2010. On June 25, 2010, the Commission issued an order announcing its intent to revoke the market-based rate authority of the above captioned public utilities, which had failed to file their required Electric Quarterly Reports.1 The Commission provided the utilities fifteen days in which to file their overdue Electric Quarterly Reports or face revocation of their market-based rate tariffs. In Order No. 2001, the Commission revised its public utility filing requirements and established a requirement for public utilities, including power marketers, to file Electric Quarterly Reports summarizing the contractual terms and conditions in their agreements for all jurisdictional services (including market-based power sales, cost-based power sales, and transmission service) and providing transaction information (including rates) for short-term and long-term power sales during the most recent calendar quarter.2 In the June 25 Order, the Commission directed Strategic Energy Management Corp. and Solaro Energy Marketing Corporation to file the required Electric Quarterly Reports within 15 days of the date of issuance of the order or face revocation of their authority to sell power at market-based rates and termination of their electric marketbased rate tariffs.3 1 Electric Quarterly Reports, 131 FERC ¶ 61,272 (2010) (June 25 Order). 2 Revised Public Utility Filing Requirements, Order No. 2001, 67 Fed. Reg. 31,043, FERC Stats. & Regs. ¶ 31,127, reh’g denied, Order No. 2001–A, 100 FERC ¶ 61,074, reconsideration and clarification denied, Order No. 2001–B, 100 FERC ¶ 61,342, order directing filings, Order No. 2001–C, 101 FERC ¶ 61,314 (2002), order directing filing, Order No. 2001–D, 102 FERC ¶ 61,334 (2003). 3 June 25 Order at Ordering Paragraph A. E:\FR\FM\02AUN1.SGM 02AUN1 45112 Federal Register / Vol. 75, No. 147 / Monday, August 2, 2010 / Notices The time period for compliance with the June 25 Order has elapsed. The two companies identified in the June 25 Order (Strategic Energy Management Corp. and Solaro Energy Marketing Corporation) have failed to file their delinquent Electric Quarterly Reports. The Commission hereby revokes the market-based rate authority and terminates the electric market-based rate tariffs of the above-captioned public utilities. Kimberly D. Bose, Secretary. [FR Doc. 2010–18840 Filed 7–30–10; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2010–0560; FRL–9184–4] Call for Information: Information on Greenhouse Gas Emissions Associated With Bioenergy and Other Biogenic Sources Environmental Protection Agency (EPA). ACTION: Call for Information; correction. AGENCY: The Environmental Protection Agency published in the Federal Register on July 15, 2010 a Call for Information to solicit information and viewpoints from interested parties on approaches to accounting for greenhouse gas emissions from bioenergy and other biogenic sources. Inadvertently, incorrect text was published for one of the items on which EPA seeks comment in Section I.D. This document corrects both that text and a typographical error in a separate reference to the Clean Air Act in Section I.D. FOR FURTHER INFORMATION CONTACT: Jennifer Jenkins, Climate Change Division, Office of Atmospheric Programs (MC–6207J), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460; telephone number: (202) 343–9361; fax number: (202) 343–2359; e-mail address: jenkins.jennifer@epa.gov. SUPPLEMENTARY INFORMATION: SUMMARY: erowe on DSK5CLS3C1PROD with NOTICES Corrections EPA published a Call for Information in the Federal Register (75 FR 41173) on July 15, 2010. In the published document, the text of the first bulleted item in Section I.D (beginning on page 41175, third column) was incorrect. The correct text for that item is as follows: • Biomass under PSD/BACT. What criteria might be used to consider biomass fuels and VerDate Mar<15>2010 15:04 Jul 30, 2010 Jkt 220001 the emissions resulting from their combustion differently with regard to applicability under PSD and with regard to the Best Available Control Technology (BACT) review process under PSD? comments at the workshop regarding the draft assessment under review. Space is limited, and reservations will be accepted on a first-come, first-served basis. In preparing a final report, EPA In addition, the first full sentence of will consider Versar, Inc.’s report of the the third bulleted item in Section I.D comments and recommendations from (first column, page 41176) contained a the external peer review workshop and typographical error. The correct text for any written public comments that EPA that sentence is: ‘‘The Clean Air Act receives in accordance with this notice. (CAA) provisions typically apply at the DATES: The peer review panel workshop unit, process, or facility scale, whereas on the draft assessment for the IPCC Guidance on accounting for hexachloroethane will be held on GHG emissions from bioenergy sources September 21, 2010, beginning at 9 a.m. was written to be applicable at the and ending at 4 p.m., Eastern Daylight national scale.’’ Time. Registration will begin at 8:30 a.m. Dated: July 27, 2010. Brian McLean, ADDRESSES: The draft ‘‘Toxicological Review of Hexachloroethane: In Support Director, Office of Atmospheric Programs. of Summary Information on the [FR Doc. 2010–19031 Filed 7–30–10; 8:45 am] Integrated Risk Information System BILLING CODE 6560–50–P (IRIS)’’ is available primarily via the Internet on the NCEA home page under the Recent Additions and Publications ENVIRONMENTAL PROTECTION menus at https://www.epa.gov/ncea. A AGENCY limited number of paper copies are [FRL–9184–1; Docket ID No. EPA–HQ–ORD– available from the Information 2010–0403] Management Team (Address: Information Management Team, Draft Toxicological Review of National Center for Environmental Hexachloroethane: In Support of Assessment [Mail Code: 8601P], U.S. Summary Information on the Environmental Protection Agency, 1200 Integrated Risk Information System Pennsylvania Avenue, NW., (IRIS) Washington, DC 20460; telephone: 703– AGENCY: Environmental Protection 347–8561; facsimile: 703–347–8691). If Agency (EPA). you request a paper copy, please ACTION: Notice of peer review workshop. provide your name, mailing address, and the draft assessment title. SUMMARY: EPA is announcing that The peer review workshop on the Versar, Inc., an EPA contractor for draft hexachloroethane assessment will external scientific peer review, will be held at the Radisson Hotel Reagan convene an independent panel of National Airport, 2020 Jefferson Davis experts and organize and conduct an Highway, Arlington, VA 22202. To external peer review workshop to attend the workshop, register no later review the draft human health than September 15, 2010, via e-mail at assessment titled, ‘‘Toxicological Review saundkat@versar.com (subject line: of Hexachloroethane: In Support of Hexachloroethane Peer Review Summary Information on the Integrated Workshop), by phone: 703–750–3000, Risk Information System (IRIS)’’ (EPA/ ext. 545, or toll free at 1–800–2– 635/R–09/007). The draft assessment VERSAR (1–800–283–7727), ask for was prepared by the National Center for Kathy Coon, the Hexachloroethane Peer Environmental Assessment (NCEA) Review Workshop Coordinator, or by within the EPA Office of Research and faxing a registration request to 703–642– Development. 6809 (please reference the EPA is releasing this draft assessment ‘‘Hexachloroethane Workshop’’ and solely for the purpose of preinclude your name, title, affiliation, full dissemination peer review under address and contact information). Space applicable information quality is limited, and reservations will be guidelines. This draft assessment has accepted on a first-come, first-served not been formally disseminated by EPA. basis. There will be a limited time at the It does not represent and should not be peer review workshop for comments construed to represent any Agency from the public. Please inform Versar, policy or determination. Inc., if you wish to make comments Versar, Inc., invites the public to during the workshop. Information on Services for register to attend this workshop as Individuals with Disabilities: EPA observers. In addition, Versar, Inc., welcomes public attendance at the invites the public to give brief oral ‘‘Hexachloroethane Peer Review comments and/or provide written PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\02AUN1.SGM 02AUN1

Agencies

[Federal Register Volume 75, Number 147 (Monday, August 2, 2010)]
[Notices]
[Pages 45111-45112]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-18840]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER02-2001-015; Docket No. ER00-167-000; Docket No. ER03-
752-000]


Electric Quarterly Reports; Strategic Energy Management Corp.; 
Solaro Energy Marketing Corporation; Notice of Revocation of Market-
Based Rate Tariff

July 23, 2010.
    On June 25, 2010, the Commission issued an order announcing its 
intent to revoke the market-based rate authority of the above captioned 
public utilities, which had failed to file their required Electric 
Quarterly Reports.\1\ The Commission provided the utilities fifteen 
days in which to file their overdue Electric Quarterly Reports or face 
revocation of their market-based rate tariffs.
---------------------------------------------------------------------------

    \1\ Electric Quarterly Reports, 131 FERC ] 61,272 (2010) (June 
25 Order).
---------------------------------------------------------------------------

    In Order No. 2001, the Commission revised its public utility filing 
requirements and established a requirement for public utilities, 
including power marketers, to file Electric Quarterly Reports 
summarizing the contractual terms and conditions in their agreements 
for all jurisdictional services (including market-based power sales, 
cost-based power sales, and transmission service) and providing 
transaction information (including rates) for short-term and long-term 
power sales during the most recent calendar quarter.\2\
---------------------------------------------------------------------------

    \2\ Revised Public Utility Filing Requirements, Order No. 2001, 
67 Fed. Reg. 31,043, FERC Stats. & Regs. ] 31,127, reh'g denied, 
Order No. 2001-A, 100 FERC ] 61,074, reconsideration and 
clarification denied, Order No. 2001-B, 100 FERC ] 61,342, order 
directing filings, Order No. 2001-C, 101 FERC ] 61,314 (2002), order 
directing filing, Order No. 2001-D, 102 FERC ] 61,334 (2003).
---------------------------------------------------------------------------

    In the June 25 Order, the Commission directed Strategic Energy 
Management Corp. and Solaro Energy Marketing Corporation to file the 
required Electric Quarterly Reports within 15 days of the date of 
issuance of the order or face revocation of their authority to sell 
power at market-based rates and termination of their electric market-
based rate tariffs.\3\
---------------------------------------------------------------------------

    \3\ June 25 Order at Ordering Paragraph A.

---------------------------------------------------------------------------

[[Page 45112]]

    The time period for compliance with the June 25 Order has elapsed. 
The two companies identified in the June 25 Order (Strategic Energy 
Management Corp. and Solaro Energy Marketing Corporation) have failed 
to file their delinquent Electric Quarterly Reports.
    The Commission hereby revokes the market-based rate authority and 
terminates the electric market-based rate tariffs of the above-
captioned public utilities.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-18840 Filed 7-30-10; 8:45 am]