Electric Quarterly Reports; Strategic Energy Management Corp.; Solaro Energy Marketing Corporation; Notice of Revocation of Market-Based Rate Tariff, 45111-45112 [2010-18840]
Download as PDF
Federal Register / Vol. 75, No. 147 / Monday, August 2, 2010 / Notices
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Monday, August 9, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–18848 Filed 7–30–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–472–000]
Kinder Morgan Interstate Gas
Transmission LLC; Notice of Request
Under Blanket Authorization
erowe on DSK5CLS3C1PROD with NOTICES
July 26, 2010.
Take notice that on July 20, 2010,
Kinder Morgan Interstate Gas
Transmission LLC (KMIGT), PO Box
281304, Lakewood, Colorado 80228–
8304, filed a prior notice request
pursuant to sections 157.205, 157.208,
and 157.210 of the Commission’s
regulations under the Natural Gas Act
(NGA) for authorization to replace,
construct and operate certain mainline
pipeline and ancillary facilities
primarily to serve a new ethanol plant
in Adams County, Nebraska, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
KMIGT states that as a result of
wrinkle bends, which have caused the
VerDate Mar<15>2010
15:04 Jul 30, 2010
Jkt 220001
pipeline to become physically
deteriorated, approximately 11.4 miles
of its 16-inch Franklin to Hastings
Pipeline needs to be replaced. KMIGT
asserts that, in response to the
developing market for natural gas and to
develop firm transportation to serve
ethanol production facilities in the
Midwest, KMIGT held an open season
from July 2, 2010 through July 9, 2010
seeking support to expand its firm
transportation capacity. As a result of
the open season, KMIGT states that it
has entered into a binding precedent
agreement with Aventine Renewable
Energy—Aurora West, LLC to provide
up to 10,000 dekatherms per day of
natural gas to serve its new ethanol
plant located near Aurora, Nebraska.
Accordingly, KMIGT proposes to
replace 11.4 miles of the Franklin to
Hastings Pipeline with 20-inch pipe to
serve the increase in firm load. In
addition, KMIGT proposes to construct
and operate certain ancillary facilities.
KMIGT estimates cost of constructing
the proposed facilities is $23,511,100.
Any questions regarding the
application should be directed to Robert
F. Harrington, Vice President,
Regulatory, Kinder Morgan Interstate
Gas Transmission LLC, 370 Van Gordon
Street, Lakewood, Colorado 80228–
8304, by telephone (303) 763–3258, or
by facsimile at (303) 984–3272, or by email at
Robert_Harrington@kindermorgan.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
45111
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–18845 Filed 7–30–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–2001–015; Docket No.
ER00–167–000; Docket No. ER03–752–000]
Electric Quarterly Reports; Strategic
Energy Management Corp.; Solaro
Energy Marketing Corporation; Notice
of Revocation of Market-Based Rate
Tariff
July 23, 2010.
On June 25, 2010, the Commission
issued an order announcing its intent to
revoke the market-based rate authority
of the above captioned public utilities,
which had failed to file their required
Electric Quarterly Reports.1 The
Commission provided the utilities
fifteen days in which to file their
overdue Electric Quarterly Reports or
face revocation of their market-based
rate tariffs.
In Order No. 2001, the Commission
revised its public utility filing
requirements and established a
requirement for public utilities,
including power marketers, to file
Electric Quarterly Reports summarizing
the contractual terms and conditions in
their agreements for all jurisdictional
services (including market-based power
sales, cost-based power sales, and
transmission service) and providing
transaction information (including rates)
for short-term and long-term power
sales during the most recent calendar
quarter.2
In the June 25 Order, the Commission
directed Strategic Energy Management
Corp. and Solaro Energy Marketing
Corporation to file the required Electric
Quarterly Reports within 15 days of the
date of issuance of the order or face
revocation of their authority to sell
power at market-based rates and
termination of their electric marketbased rate tariffs.3
1 Electric Quarterly Reports, 131 FERC ¶ 61,272
(2010) (June 25 Order).
2 Revised Public Utility Filing Requirements,
Order No. 2001, 67 Fed. Reg. 31,043, FERC Stats.
& Regs. ¶ 31,127, reh’g denied, Order No. 2001–A,
100 FERC ¶ 61,074, reconsideration and
clarification denied, Order No. 2001–B, 100 FERC
¶ 61,342, order directing filings, Order No. 2001–C,
101 FERC ¶ 61,314 (2002), order directing filing,
Order No. 2001–D, 102 FERC ¶ 61,334 (2003).
3 June 25 Order at Ordering Paragraph A.
E:\FR\FM\02AUN1.SGM
02AUN1
45112
Federal Register / Vol. 75, No. 147 / Monday, August 2, 2010 / Notices
The time period for compliance with
the June 25 Order has elapsed. The two
companies identified in the June 25
Order (Strategic Energy Management
Corp. and Solaro Energy Marketing
Corporation) have failed to file their
delinquent Electric Quarterly Reports.
The Commission hereby revokes the
market-based rate authority and
terminates the electric market-based rate
tariffs of the above-captioned public
utilities.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–18840 Filed 7–30–10; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2010–0560; FRL–9184–4]
Call for Information: Information on
Greenhouse Gas Emissions
Associated With Bioenergy and Other
Biogenic Sources
Environmental Protection
Agency (EPA).
ACTION: Call for Information; correction.
AGENCY:
The Environmental Protection
Agency published in the Federal
Register on July 15, 2010 a Call for
Information to solicit information and
viewpoints from interested parties on
approaches to accounting for
greenhouse gas emissions from
bioenergy and other biogenic sources.
Inadvertently, incorrect text was
published for one of the items on which
EPA seeks comment in Section I.D. This
document corrects both that text and a
typographical error in a separate
reference to the Clean Air Act in Section
I.D.
FOR FURTHER INFORMATION CONTACT:
Jennifer Jenkins, Climate Change
Division, Office of Atmospheric
Programs (MC–6207J), Environmental
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460;
telephone number: (202) 343–9361; fax
number: (202) 343–2359; e-mail
address: jenkins.jennifer@epa.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
erowe on DSK5CLS3C1PROD with NOTICES
Corrections
EPA published a Call for Information
in the Federal Register (75 FR 41173) on
July 15, 2010. In the published
document, the text of the first bulleted
item in Section I.D (beginning on page
41175, third column) was incorrect. The
correct text for that item is as follows:
• Biomass under PSD/BACT. What criteria
might be used to consider biomass fuels and
VerDate Mar<15>2010
15:04 Jul 30, 2010
Jkt 220001
the emissions resulting from their
combustion differently with regard to
applicability under PSD and with regard to
the Best Available Control Technology
(BACT) review process under PSD?
comments at the workshop regarding
the draft assessment under review.
Space is limited, and reservations will
be accepted on a first-come, first-served
basis. In preparing a final report, EPA
In addition, the first full sentence of
will consider Versar, Inc.’s report of the
the third bulleted item in Section I.D
comments and recommendations from
(first column, page 41176) contained a
the external peer review workshop and
typographical error. The correct text for
any written public comments that EPA
that sentence is: ‘‘The Clean Air Act
receives in accordance with this notice.
(CAA) provisions typically apply at the
DATES: The peer review panel workshop
unit, process, or facility scale, whereas
on the draft assessment for
the IPCC Guidance on accounting for
hexachloroethane will be held on
GHG emissions from bioenergy sources
September 21, 2010, beginning at 9 a.m.
was written to be applicable at the
and ending at 4 p.m., Eastern Daylight
national scale.’’
Time. Registration will begin at 8:30
a.m.
Dated: July 27, 2010.
Brian McLean,
ADDRESSES: The draft ‘‘Toxicological
Review of Hexachloroethane: In Support
Director, Office of Atmospheric Programs.
of Summary Information on the
[FR Doc. 2010–19031 Filed 7–30–10; 8:45 am]
Integrated Risk Information System
BILLING CODE 6560–50–P
(IRIS)’’ is available primarily via the
Internet on the NCEA home page under
the Recent Additions and Publications
ENVIRONMENTAL PROTECTION
menus at https://www.epa.gov/ncea. A
AGENCY
limited number of paper copies are
[FRL–9184–1; Docket ID No. EPA–HQ–ORD– available from the Information
2010–0403]
Management Team (Address:
Information Management Team,
Draft Toxicological Review of
National Center for Environmental
Hexachloroethane: In Support of
Assessment [Mail Code: 8601P], U.S.
Summary Information on the
Environmental Protection Agency, 1200
Integrated Risk Information System
Pennsylvania Avenue, NW.,
(IRIS)
Washington, DC 20460; telephone: 703–
AGENCY: Environmental Protection
347–8561; facsimile: 703–347–8691). If
Agency (EPA).
you request a paper copy, please
ACTION: Notice of peer review workshop. provide your name, mailing address,
and the draft assessment title.
SUMMARY: EPA is announcing that
The peer review workshop on the
Versar, Inc., an EPA contractor for
draft hexachloroethane assessment will
external scientific peer review, will
be held at the Radisson Hotel Reagan
convene an independent panel of
National Airport, 2020 Jefferson Davis
experts and organize and conduct an
Highway, Arlington, VA 22202. To
external peer review workshop to
attend the workshop, register no later
review the draft human health
than September 15, 2010, via e-mail at
assessment titled, ‘‘Toxicological Review saundkat@versar.com (subject line:
of Hexachloroethane: In Support of
Hexachloroethane Peer Review
Summary Information on the Integrated Workshop), by phone: 703–750–3000,
Risk Information System (IRIS)’’ (EPA/
ext. 545, or toll free at 1–800–2–
635/R–09/007). The draft assessment
VERSAR (1–800–283–7727), ask for
was prepared by the National Center for Kathy Coon, the Hexachloroethane Peer
Environmental Assessment (NCEA)
Review Workshop Coordinator, or by
within the EPA Office of Research and
faxing a registration request to 703–642–
Development.
6809 (please reference the
EPA is releasing this draft assessment ‘‘Hexachloroethane Workshop’’ and
solely for the purpose of preinclude your name, title, affiliation, full
dissemination peer review under
address and contact information). Space
applicable information quality
is limited, and reservations will be
guidelines. This draft assessment has
accepted on a first-come, first-served
not been formally disseminated by EPA. basis. There will be a limited time at the
It does not represent and should not be
peer review workshop for comments
construed to represent any Agency
from the public. Please inform Versar,
policy or determination.
Inc., if you wish to make comments
Versar, Inc., invites the public to
during the workshop.
Information on Services for
register to attend this workshop as
Individuals with Disabilities: EPA
observers. In addition, Versar, Inc.,
welcomes public attendance at the
invites the public to give brief oral
‘‘Hexachloroethane Peer Review
comments and/or provide written
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\02AUN1.SGM
02AUN1
Agencies
[Federal Register Volume 75, Number 147 (Monday, August 2, 2010)]
[Notices]
[Pages 45111-45112]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-18840]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER02-2001-015; Docket No. ER00-167-000; Docket No. ER03-
752-000]
Electric Quarterly Reports; Strategic Energy Management Corp.;
Solaro Energy Marketing Corporation; Notice of Revocation of Market-
Based Rate Tariff
July 23, 2010.
On June 25, 2010, the Commission issued an order announcing its
intent to revoke the market-based rate authority of the above captioned
public utilities, which had failed to file their required Electric
Quarterly Reports.\1\ The Commission provided the utilities fifteen
days in which to file their overdue Electric Quarterly Reports or face
revocation of their market-based rate tariffs.
---------------------------------------------------------------------------
\1\ Electric Quarterly Reports, 131 FERC ] 61,272 (2010) (June
25 Order).
---------------------------------------------------------------------------
In Order No. 2001, the Commission revised its public utility filing
requirements and established a requirement for public utilities,
including power marketers, to file Electric Quarterly Reports
summarizing the contractual terms and conditions in their agreements
for all jurisdictional services (including market-based power sales,
cost-based power sales, and transmission service) and providing
transaction information (including rates) for short-term and long-term
power sales during the most recent calendar quarter.\2\
---------------------------------------------------------------------------
\2\ Revised Public Utility Filing Requirements, Order No. 2001,
67 Fed. Reg. 31,043, FERC Stats. & Regs. ] 31,127, reh'g denied,
Order No. 2001-A, 100 FERC ] 61,074, reconsideration and
clarification denied, Order No. 2001-B, 100 FERC ] 61,342, order
directing filings, Order No. 2001-C, 101 FERC ] 61,314 (2002), order
directing filing, Order No. 2001-D, 102 FERC ] 61,334 (2003).
---------------------------------------------------------------------------
In the June 25 Order, the Commission directed Strategic Energy
Management Corp. and Solaro Energy Marketing Corporation to file the
required Electric Quarterly Reports within 15 days of the date of
issuance of the order or face revocation of their authority to sell
power at market-based rates and termination of their electric market-
based rate tariffs.\3\
---------------------------------------------------------------------------
\3\ June 25 Order at Ordering Paragraph A.
---------------------------------------------------------------------------
[[Page 45112]]
The time period for compliance with the June 25 Order has elapsed.
The two companies identified in the June 25 Order (Strategic Energy
Management Corp. and Solaro Energy Marketing Corporation) have failed
to file their delinquent Electric Quarterly Reports.
The Commission hereby revokes the market-based rate authority and
terminates the electric market-based rate tariffs of the above-
captioned public utilities.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-18840 Filed 7-30-10; 8:45 am]
BILLING CODE 6717-01-P