City of Gloversville; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 43957-43958 [2010-18286]

Download as PDF Federal Register / Vol. 75, No. 143 / Tuesday, July 27, 2010 / Notices contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13806) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–18281 Filed 7–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13635–000] City of Gloversville; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions sroberts on DSKD5P82C1PROD with NOTICES July 20, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit Exemption. b. Project No.: 13635–000. c. Date filed: November 30, 2009 and supplemented March 18 and July 6, 2010. d. Applicant: City of Gloversville. e. Name of Project: Rice Reservoir Project. f. Location: The project is located near the town of Gloversville in Fulton County, New York. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Steven Doret, Mill Road Engineering, 23 Mill Road, Westborough, MA 01581–2901, (508) 366–5833. i. FERC Contact: Anthony DeLuca, (202) 502–663262, Anthony.deluca@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and VerDate Mar<15>2010 16:30 Jul 26, 2010 Jkt 220001 the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size and location of the proposed project in a closed system, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments filed in response to comments submitted by any resource agency, Indian tribe, or person, must be filed with the Commission within 45 days from the issuance date of this notice. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Project: The City of Gloversville (Gloversville) requests Commission approval for exemption for small conduit hydroelectric facility. This proposal consists of adding a Turgo style 25 kilowatt hydraulic turbine/ generator at the discharge end of the Rice Reservoir discharge block. The primary purpose of the conduit is supply of processed water to the Gloversville Potable Water Treatment Plant. The hydraulic capacity of the generator will be 2.79 cubic feet per second and the generator will have an estimated average annual generation of 192,000 kWh. m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street, NE., Washington, DC 20426. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, here P–13635, in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 43957 call (202) 502–8659. A copy is also available for review and reproduction at the address in item h. above. n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a competing development application. A notice of intent must be served on the applicant(s) named in this public notice. p. Protests or Motions To Intervene— Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. q. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST,’’ ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and eight copies to: The Secretary, E:\FR\FM\27JYN1.SGM 27JYN1 43958 Federal Register / Vol. 75, No. 143 / Tuesday, July 27, 2010 / Notices Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–18286 Filed 7–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12548–006] Hydrodynamics, Inc.; Notice of Application for Surrender of License and Soliciting Comments, Motions To Intervene, and Protests sroberts on DSKD5P82C1PROD with NOTICES July 20, 2010. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application: Type: Surrender of License. b. Project No.: 12548–006. c. Date Filed: June 25, 2010. d. Applicant: Hydrodynamics, Inc. e. Name of Project: Greenfield Hydroelectric Project. f. Location: The unconstructed project was to be located on the Greenfields Main Canal, which is a feature of the U.S. Bureau of Reclamation’s Sun River Project, in Teton County, Montana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Roger Kirk, Hydrodynamics, Inc., P.O. Box 1136, Bozeman, MT 59771, (406) 587–5086. i. FERC Contact: Patricia W. Gillis, Telephone (202) 502–8735. j. Deadline for filing comments, motions to intervene, and protests: August 19, 2010. Comments, motions to intervene, and protests may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may VerDate Mar<15>2010 16:30 Jul 26, 2010 Jkt 220001 be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. k. Description of Request: The licensee filed an application to surrender its license for the unconstructed Greenfield Hydroelectric Project. The Licensee has not commenced construction of the project. No ground disturbing activities have occurred. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number (P–12548) excluding the last three digits in the docket number field to access the document. You may also register Online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—All filings must: (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘PROTEST,’’ OR ‘‘MOTION TO INTERVENE,’’ as applicable, and the Project Number of the particular application to which the filing refers. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. 2010–18284 Filed 7–26–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2299–074] Turlock Irrigation District and Modesto Irrigation District; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests July 19, 2010. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No.: 2299–074. c. Date Filed: May 24, 2010. d. Applicant: Turlock Irrigation District and Modesto Irrigation District. e. Name of Project: Don Pedro Hydroelectric Project. f. Location: On the Tuolumne River, Tuolumne County, California. g. Filed Pursuant to: Federal Power Act, 16 USC 791a–825r. h. Applicant Contact: Turlock Irrigation District, Robert M. Nees, Director of Water Resources and Regulatory Affairs, P.O. Box 949, Turlock, CA 95381, telephone: (209) 883–8300; and Modesto Irrigation District, Greg Salyer, Resource Planning and Development Manager, P.O. Box 4060, Modesto, CA 95352, telephone: (209) 526–7373. i. FERC Contact: Mrs. Anumzziatta Purchiaroni, telephone (202) 502–6191, and e-mail address: anumzziatta.purchiaroni@ferc.gov. j. Deadline for filing comments, motions to intervene, and protest: August 20, 2010. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\27JYN1.SGM 27JYN1

Agencies

[Federal Register Volume 75, Number 143 (Tuesday, July 27, 2010)]
[Notices]
[Pages 43957-43958]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-18286]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13635-000]


City of Gloversville; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, Protests, 
Recommendations, and Terms and Conditions

July 20, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Conduit Exemption.
    b. Project No.: 13635-000.
    c. Date filed: November 30, 2009 and supplemented March 18 and July 
6, 2010.
    d. Applicant: City of Gloversville.
    e. Name of Project: Rice Reservoir Project.
    f. Location: The project is located near the town of Gloversville 
in Fulton County, New York.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Steven Doret, Mill Road Engineering, 23 
Mill Road, Westborough, MA 01581-2901, (508) 366-5833.
    i. FERC Contact: Anthony DeLuca, (202) 502-663262, 
Anthony.deluca@ferc.gov.
    j. Status of Environmental Analysis: This application is ready for 
environmental analysis at this time, and the Commission is requesting 
comments, reply comments, recommendations, terms and conditions, and 
prescriptions.
    k. Deadline for filing responsive documents: Due to the small size 
and location of the proposed project in a closed system, as well as the 
resource agency consultation letters filed with the application, the 
60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, 
motions to intervene, protests, recommendations, terms and conditions, 
and prescriptions is shortened to 30 days from the issuance date of 
this notice. All reply comments filed in response to comments submitted 
by any resource agency, Indian tribe, or person, must be filed with the 
Commission within 45 days from the issuance date of this notice.
    Comments, protests, and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link. The Commission strongly encourages electronic filings.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    l. Description of Project: The City of Gloversville (Gloversville) 
requests Commission approval for exemption for small conduit 
hydroelectric facility. This proposal consists of adding a Turgo style 
25 kilowatt hydraulic turbine/generator at the discharge end of the 
Rice Reservoir discharge block. The primary purpose of the conduit is 
supply of processed water to the Gloversville Potable Water Treatment 
Plant. The hydraulic capacity of the generator will be 2.79 cubic feet 
per second and the generator will have an estimated average annual 
generation of 192,000 kWh.
    m. This filing is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street, 
NE., Washington, DC 20426. The filing may also be viewed on the Web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number, here P-13635, in the docket number field to access the 
document. For assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for review and reproduction at the address in item h. 
above.
    n. Development Application--Any qualified applicant desiring to 
file a competing application must submit to the Commission, on or 
before the specified deadline date for the particular application, a 
competing development application, or a notice of intent to file such 
an application. Submission of a timely notice of intent allows an 
interested person to file the competing development application no 
later than 120 days after the specified deadline date for the 
particular application. Applications for preliminary permits will not 
be accepted in response to this notice.
    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit a competing development application. A notice of intent must be 
served on the applicant(s) named in this public notice.
    p. Protests or Motions To Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    q. All filings must: (1) Bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS''; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. Any of these documents must be filed by providing 
the original and eight copies to: The Secretary,

[[Page 43958]]

Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. An additional copy must be sent to Director, 
Division of Hydropower Administration and Compliance, Office of Energy 
Projects, Federal Energy Regulatory Commission, at the above address. A 
copy of any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-18286 Filed 7-26-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.