Hydrodynamics, Inc.; Notice of Application for Surrender of License and Soliciting Comments, Motions To Intervene, and Protests, 43958 [2010-18284]
Download as PDF
43958
Federal Register / Vol. 75, No. 143 / Tuesday, July 27, 2010 / Notices
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–18286 Filed 7–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12548–006]
Hydrodynamics, Inc.; Notice of
Application for Surrender of License
and Soliciting Comments, Motions To
Intervene, and Protests
sroberts on DSKD5P82C1PROD with NOTICES
July 20, 2010.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application: Type: Surrender of
License.
b. Project No.: 12548–006.
c. Date Filed: June 25, 2010.
d. Applicant: Hydrodynamics, Inc.
e. Name of Project: Greenfield
Hydroelectric Project.
f. Location: The unconstructed project
was to be located on the Greenfields
Main Canal, which is a feature of the
U.S. Bureau of Reclamation’s Sun River
Project, in Teton County, Montana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Roger Kirk,
Hydrodynamics, Inc., P.O. Box 1136,
Bozeman, MT 59771, (406) 587–5086.
i. FERC Contact: Patricia W. Gillis,
Telephone (202) 502–8735.
j. Deadline for filing comments,
motions to intervene, and protests:
August 19, 2010. Comments, motions to
intervene, and protests may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. If unable to
be filed electronically, documents may
VerDate Mar<15>2010
16:30 Jul 26, 2010
Jkt 220001
be paper-filed. To paper-file, an original
and eight copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
For more information on how to submit
these types of filings, please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
k. Description of Request: The
licensee filed an application to
surrender its license for the
unconstructed Greenfield Hydroelectric
Project. The Licensee has not
commenced construction of the project.
No ground disturbing activities have
occurred.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number (P–12548)
excluding the last three digits in the
docket number field to access the
document. You may also register Online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must: (1) Bear in
all capital letters the title
‘‘COMMENTS,’’ ‘‘PROTEST,’’ OR
‘‘MOTION TO INTERVENE,’’ as
applicable, and the Project Number of
the particular application to which the
filing refers.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–18284 Filed 7–26–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2299–074]
Turlock Irrigation District and Modesto
Irrigation District; Notice of Application
for Amendment of License and
Soliciting Comments, Motions To
Intervene, and Protests
July 19, 2010.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
License.
b. Project No.: 2299–074.
c. Date Filed: May 24, 2010.
d. Applicant: Turlock Irrigation
District and Modesto Irrigation District.
e. Name of Project: Don Pedro
Hydroelectric Project.
f. Location: On the Tuolumne River,
Tuolumne County, California.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791a–825r.
h. Applicant Contact: Turlock
Irrigation District, Robert M. Nees,
Director of Water Resources and
Regulatory Affairs, P.O. Box 949,
Turlock, CA 95381, telephone: (209)
883–8300; and Modesto Irrigation
District, Greg Salyer, Resource Planning
and Development Manager, P.O. Box
4060, Modesto, CA 95352, telephone:
(209) 526–7373.
i. FERC Contact: Mrs. Anumzziatta
Purchiaroni, telephone (202) 502–6191,
and e-mail address:
anumzziatta.purchiaroni@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protest:
August 20, 2010.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
E:\FR\FM\27JYN1.SGM
27JYN1
Agencies
[Federal Register Volume 75, Number 143 (Tuesday, July 27, 2010)]
[Notices]
[Page 43958]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-18284]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12548-006]
Hydrodynamics, Inc.; Notice of Application for Surrender of
License and Soliciting Comments, Motions To Intervene, and Protests
July 20, 2010.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application: Type: Surrender of License.
b. Project No.: 12548-006.
c. Date Filed: June 25, 2010.
d. Applicant: Hydrodynamics, Inc.
e. Name of Project: Greenfield Hydroelectric Project.
f. Location: The unconstructed project was to be located on the
Greenfields Main Canal, which is a feature of the U.S. Bureau of
Reclamation's Sun River Project, in Teton County, Montana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Roger Kirk, Hydrodynamics, Inc., P.O. Box
1136, Bozeman, MT 59771, (406) 587-5086.
i. FERC Contact: Patricia W. Gillis, Telephone (202) 502-8735.
j. Deadline for filing comments, motions to intervene, and
protests: August 19, 2010. Comments, motions to intervene, and protests
may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``eFiling'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings, please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp.
k. Description of Request: The licensee filed an application to
surrender its license for the unconstructed Greenfield Hydroelectric
Project. The Licensee has not commenced construction of the project. No
ground disturbing activities have occurred.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number (P-12548) excluding the last
three digits in the docket number field to access the document. You may
also register Online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--All filings must:
(1) Bear in all capital letters the title ``COMMENTS,'' ``PROTEST,'' OR
``MOTION TO INTERVENE,'' as applicable, and the Project Number of the
particular application to which the filing refers.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-18284 Filed 7-26-10; 8:45 am]
BILLING CODE 6717-01-P