KC Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41856 [2010-17560]

Download as PDF 41856 Federal Register / Vol. 75, No. 137 / Monday, July 19, 2010 / Notices (OFS) filed a petition for rate approval pursuant to section 284.123(b)(2) of the Commission’s regulations. OFS states it is filing for approval for a new maximum rate for interruptible transportation service provided pursuant to Section 311 of the NGPA. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERC OnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Monday, July 26, 2010. jlentini on DSKJ8SOYB1PROD with NOTICES Kimberly D. Bose, Secretary. [FR Doc. 2010–17548 Filed 7–16–10; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:24 Jul 16, 2010 Jkt 220001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13686–000] KC Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2010. On March 23, 2010, KC Hydro LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Cline Falls Hydro Project located on the Deschutes River in Deschutes County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following existing features: (1) A 5foot-high, 300-foot-long diversion structure; (2) a pond with a storage capacity of 1 to 2 acre-feet; (3) a canal and box flume, connected to a 96-inchdiameter, 45-foot-long steel penstock; (4) a powerhouse containing a 750-kW Francis turbine/generator; (5) a tailrace leading from a rock chamber located under the turbine to the River; and (6) appurtenant facilities. Applicant Contact: Kelly W. Sackheim, Managing Member, 5096 Cocoa Palm Way, Fair Oaks, CA 95628; phone: (916) 962–2271. FERC Contact: Kelly Wolcott, (202) 502–6480. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov; call toll-free at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/elibrary. asp. Enter the docket number (P–13686) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–17560 Filed 7–16–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12632–001–Texas] East Texas Electric Cooperative, Inc.: Lake Livingston Hydroelectric Project; Notice of Proposed Restricted Service List for a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the National Register of Historic Places July 9, 2010. Rule 2010 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR section 385.2010, provides that, to eliminate unnecessary expense or improve administrative efficiency, the Secretary may establish a restricted service list for a particular phase or issue in a proceeding. The restricted service list should contain the names of persons on the service list who, in the judgment of the decisional authority establishing the list, are active participants with respect to the phase or issue in the proceeding for which the list is established. The Commission staff is consulting with the Texas State Historic Preservation Officer (hereinafter, SHPO) and the Advisory Council on Historic Preservation (hereinafter, Advisory Council) pursuant to the Advisory Council’s regulations, 36 CFR Part 800, implementing section 106 of the National Historic Preservation Act, as amended, (16 U.S.C. 470f), to prepare a Programmatic Agreement for managing properties included in, or eligible for inclusion in, the National Register of Historic Places at the proposed Lake Livingston Hydroelectric Project. E:\FR\FM\19JYN1.SGM 19JYN1

Agencies

[Federal Register Volume 75, Number 137 (Monday, July 19, 2010)]
[Notices]
[Page 41856]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-17560]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13686-000]


KC Hydro LLC; Notice of Preliminary Permit Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Competing 
Applications

July 9, 2010.
    On March 23, 2010, KC Hydro LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Cline Falls Hydro Project 
located on the Deschutes River in Deschutes County, Oregon. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following existing 
features: (1) A 5-foot-high, 300-foot-long diversion structure; (2) a 
pond with a storage capacity of 1 to 2 acre-feet; (3) a canal and box 
flume, connected to a 96-inch-diameter, 45-foot-long steel penstock; 
(4) a powerhouse containing a 750-kW Francis turbine/generator; (5) a 
tailrace leading from a rock chamber located under the turbine to the 
River; and (6) appurtenant facilities.
    Applicant Contact: Kelly W. Sackheim, Managing Member, 5096 Cocoa 
Palm Way, Fair Oaks, CA 95628; phone: (916) 962-2271.
    FERC Contact: Kelly Wolcott, (202) 502-6480.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at  https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13686) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-17560 Filed 7-16-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.