McGinnis, Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 40805 [2010-17095]
Download as PDF
Federal Register / Vol. 75, No. 134 / Wednesday, July 14, 2010 / Notices
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments or
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13591) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–17096 Filed 7–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
McGinnis, Inc. Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
emcdonald on DSK2BSOYB1PROD with NOTICES
July 6, 2010.
On September 29, 2009, McGinnis,
Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Pickwick
Hydrokinetic Project, to be located on
the Tennessee River downstream of the
Tennessee Valley Authority (TVA) and
the Corps of Engineers’ (COE) existing
Pickwick Lock & Dam in Harden
County, Tennessee. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
otherwise enter upon lands or waters
VerDate Mar<15>2010
16:07 Jul 13, 2010
Jkt 220001
owned by others without the owners’
express permission.
The proposed Pickwick Hydrokinetic
Project consists of: (1) 10 proposed 35
kilowatt axial flow turbine generating
units having a total installed capacity of
350 kilowatts; (2) a 1,300-foot-long, 13.2
kilovolt transmission line; and (3)
appurtenant facilities. The proposed
Pickwick Hydrokinetic Project would
have an average annual generation of
1.533 gigawatt-hours.
Applicant Contact: Bruce McGinnis,
Sr., CEO, McGinnis, Inc., 502 Second
Street Ext., South Point, OH 45680;
phone: (740) 377–4391.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments or
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13594) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–17095 Filed 7–13–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
July 2, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1649–000.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
40805
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc
submits proposed revisions to the
Coordination Agreement with
Independent Electricity System
Operator.
Filed Date: 06/30/2010.
Accession Number: 20100630–0234.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 21, 2010.
Docket Numbers: ER10–1650–000.
Applicants: New England Power Pool
Participants Committee.
Description: The New England Power
Pool Participants Committee submits
transmittal letter along with counterpart
signature pages of the Agreement dated
9/1/71 etc.
Filed Date: 06/30/2010.
Accession Number: 20100630–0233.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 21, 2010.
Docket Numbers: ER10–1653–000.
Applicants: ISO New England and
NEPOOL.
Description: ISO New England Inc et
al submits transmittal letter and Fourth
Revised Sheet 7319B et al to FERC
Electric Tariff 3- Section III- Market
Rule 1- Standard Market Design etc.
Filed Date: 06/30/2010.
Accession Number: 20100630–0221.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 21, 2010.
Docket Numbers: ER10–1654–000.
Applicants: Connecticut Light &
Power Company.
Description: The Connecticut Light
and Power Company submits
Interconnection Agreement with
Covanta Projects of Wallingford, LP etc.
Filed Date: 06/30/2010.
Accession Number: 20100630–0219.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 21, 2010.
Docket Numbers: ER10–1655–000.
Applicants: MATEP, Inc.
Description: MATEP Limited
Partnership submits Notice of
Succession to New MATEP, Inc’s
market- based rate tariff.
Filed Date: 06/30/2010.
Accession Number: 20100630–0220.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 21, 2010.
Docket Numbers: ER10–1659–000.
Applicants: PSEG Nuclear LLC.
Description: PSEG Nuclear LLC
submits tariff filing per 35.12: Baseline
Filing of Market-Based Rates Tariff
Under Order No. 714 to be effective 7/
1/2010.
Filed Date: 07/01/2010.
Accession Number: 20100701–5008.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 22, 2010.
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 75, Number 134 (Wednesday, July 14, 2010)]
[Notices]
[Page 40805]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-17095]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
McGinnis, Inc. Notice of Preliminary Permit Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
July 6, 2010.
On September 29, 2009, McGinnis, Inc. filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Pickwick Hydrokinetic
Project, to be located on the Tennessee River downstream of the
Tennessee Valley Authority (TVA) and the Corps of Engineers' (COE)
existing Pickwick Lock & Dam in Harden County, Tennessee. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed Pickwick Hydrokinetic Project consists of: (1) 10
proposed 35 kilowatt axial flow turbine generating units having a total
installed capacity of 350 kilowatts; (2) a 1,300-foot-long, 13.2
kilovolt transmission line; and (3) appurtenant facilities. The
proposed Pickwick Hydrokinetic Project would have an average annual
generation of 1.533 gigawatt-hours.
Applicant Contact: Bruce McGinnis, Sr., CEO, McGinnis, Inc., 502
Second Street Ext., South Point, OH 45680; phone: (740) 377-4391.
FERC Contact: Kim Carter, 202-502-6486.
Deadline for filing comments or motions to intervene: 60 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' link. For a simpler
method of submitting text only comments, click on ``Quick Comment.''
For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, for
TTY, contact (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and eight copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13594) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-17095 Filed 7-13-10; 8:45 am]