ETC Tiger Pipeline, LLC; Notice of Application, 38799-38800 [2010-16282]
Download as PDF
Federal Register / Vol. 75, No. 128 / Tuesday, July 6, 2010 / Notices
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13722) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–16276 Filed 7–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13666–000]
Reedsport OPT Wave Park, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1
June 24, 2010.
Reedsport OPT Wave Park, LLC filed
on February 2, 2010 and amended on
May 27, 2010, an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Reedsport
OPT Wave Park Phase III Project located
in the Pacific Ocean about 2.5 miles
west of Reedsport, Oregon. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) 100 PowerBuoys having a total
installed capacity of 50 megawatts; (2)
an approximately 2.5-mile-long, subsea
transmission cable; (3) an approximately
3-mile-long transmission line
connecting to an existing substation;
and (4) appurtenant facilities. The
project would have an estimated average
annual generation of 138,000 megawatthours.
Applicant Contact: Mr. Phillip J.
Pellegrino, Oregon Wave Energy
Partners I, LLC, 1590 Reed Road,
Pennington, NJ 08534.
VerDate Mar<15>2010
14:52 Jul 02, 2010
Jkt 220001
FERC Contact: Jim Hastreiter, (503)
552–2760, or via e-mail at
james.hastreiter@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13666) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–16277 Filed 7–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–459–000]
ETC Tiger Pipeline, LLC; Notice of
Application
June 25, 2010.
Take notice that on June 15, 2010,
ETC Tiger Pipeline, LLC (ETC Tiger),
711 Louisiana Street, Suite 900,
Houston, Texas 77002, filed an
application in Docket No. CP10–459–
000 pursuant to section 7(c) of the
Natural Gas Act (NGA), and Part 157,
Subpart A of the Commission’s
regulations requesting: (1) Authorization
to construct, own, operate and maintain
approximately 20.5 miles of 42-inch
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
38799
diameter natural gas pipeline and
30,565 horsepower of compression
located in Louisiana capable of
transporting up to 400,000 Mcf/day
(Expansion Project); (2) a predetermination of rolled-in rate treatment
for the costs associated with the
Expansion Project; and (3) approval of
incremental fuel charges for
transportation service provided by the
proposed facilities, all as more fully set
forth in the application which is on file
with the Commission and open for
public inspection.
Any questions regarding the
applications should be directed to Joey
Mahmoud, Vice President, Energy
Transfer Partners, L.P., 711 Louisiana
Street, Suite 900, Houston, Texas 77002,
832–668–1242, Joey.Mahmoud@energy
transferpartners.com or Lisa M. Tonery,
Fulbright & Jaworski L.L.P., 666 Fifth
Avenue, New York, New York 10103,
212–318–3009, ltonery@fulbright.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
E:\FR\FM\06JYN1.SGM
06JYN1
wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1
38800
Federal Register / Vol. 75, No. 128 / Tuesday, July 6, 2010 / Notices
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
VerDate Mar<15>2010
14:52 Jul 02, 2010
Jkt 220001
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: July 16, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–16282 Filed 7–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12740–003]
Jordan Hydroelectric Limited
Partnership; Notice of Application
Ready for Environmental Analysis and
Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
June 28, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major Original
License.
b. Project No.: P–12740–003.
c. Date filed: July 13, 2009.
d. Applicant: Jordan Hydroelectric
Limited Partnership.
e. Name of Project: Flannagan
Hydroelectric Project.
f. Location: On the Pound River, in
the Town of Clintwood, in Dickenson
County, Virginia. The project would
occupy Federal land managed by the
U.S. Army Corps of Engineers.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. James B.
Price, W.V. Hydro, Inc., P.O. Box 903,
Gatlinburg, TN 37738 (865) 436–0402.
i. FERC Contact: Gaylord Hoisington,
(202) 502–6032 or
gaylord.hoisington@FERC.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance date of this notice;
reply comments are due 105 days from
issuance date of this notice.
All documents may be filed
electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Commission strongly encourages
electronic filings, documents may also
be paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ (Corps) Flannagan dam,
intake tower, outlet works, and reservoir
and would consist of: (1) Three new
turbine generating units located within
the existing intake tower having a total
installed capacity of 3 megawatts; (2) a
new control booth on the intake tower;
(3) a new substation near the Corps’
existing service bridge; (4) new
transmission leads connecting the
generating units to Appalachian Power
Company’s existing transmission line;
and (5) appurtenant facilities. The
average annual generation is estimated
to be 9.5 gigawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item (h) above.
All filings must (1) Bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
E:\FR\FM\06JYN1.SGM
06JYN1
Agencies
[Federal Register Volume 75, Number 128 (Tuesday, July 6, 2010)]
[Notices]
[Pages 38799-38800]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-16282]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-459-000]
ETC Tiger Pipeline, LLC; Notice of Application
June 25, 2010.
Take notice that on June 15, 2010, ETC Tiger Pipeline, LLC (ETC
Tiger), 711 Louisiana Street, Suite 900, Houston, Texas 77002, filed an
application in Docket No. CP10-459-000 pursuant to section 7(c) of the
Natural Gas Act (NGA), and Part 157, Subpart A of the Commission's
regulations requesting: (1) Authorization to construct, own, operate
and maintain approximately 20.5 miles of 42-inch diameter natural gas
pipeline and 30,565 horsepower of compression located in Louisiana
capable of transporting up to 400,000 Mcf/day (Expansion Project); (2)
a pre-determination of rolled-in rate treatment for the costs
associated with the Expansion Project; and (3) approval of incremental
fuel charges for transportation service provided by the proposed
facilities, all as more fully set forth in the application which is on
file with the Commission and open for public inspection.
Any questions regarding the applications should be directed to Joey
Mahmoud, Vice President, Energy Transfer Partners, L.P., 711 Louisiana
Street, Suite 900, Houston, Texas 77002, 832-668-1242,
Joey.Mahmoud@energytransferpartners.com or Lisa M. Tonery, Fulbright &
Jaworski L.L.P., 666 Fifth Avenue, New York, New York 10103, 212-318-
3009, ltonery@fulbright.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit
[[Page 38800]]
14 copies of filings made with the Commission and must mail a copy to
the applicant and to every other party in the proceeding. Only parties
to the proceeding can ask for court review of Commission orders in the
proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: July 16, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-16282 Filed 7-2-10; 8:45 am]
BILLING CODE 6717-01-P