Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 38800-38801 [2010-16280]
Download as PDF
wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1
38800
Federal Register / Vol. 75, No. 128 / Tuesday, July 6, 2010 / Notices
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
VerDate Mar<15>2010
14:52 Jul 02, 2010
Jkt 220001
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: July 16, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–16282 Filed 7–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12740–003]
Jordan Hydroelectric Limited
Partnership; Notice of Application
Ready for Environmental Analysis and
Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
June 28, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major Original
License.
b. Project No.: P–12740–003.
c. Date filed: July 13, 2009.
d. Applicant: Jordan Hydroelectric
Limited Partnership.
e. Name of Project: Flannagan
Hydroelectric Project.
f. Location: On the Pound River, in
the Town of Clintwood, in Dickenson
County, Virginia. The project would
occupy Federal land managed by the
U.S. Army Corps of Engineers.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. James B.
Price, W.V. Hydro, Inc., P.O. Box 903,
Gatlinburg, TN 37738 (865) 436–0402.
i. FERC Contact: Gaylord Hoisington,
(202) 502–6032 or
gaylord.hoisington@FERC.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance date of this notice;
reply comments are due 105 days from
issuance date of this notice.
All documents may be filed
electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Commission strongly encourages
electronic filings, documents may also
be paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ (Corps) Flannagan dam,
intake tower, outlet works, and reservoir
and would consist of: (1) Three new
turbine generating units located within
the existing intake tower having a total
installed capacity of 3 megawatts; (2) a
new control booth on the intake tower;
(3) a new substation near the Corps’
existing service bridge; (4) new
transmission leads connecting the
generating units to Appalachian Power
Company’s existing transmission line;
and (5) appurtenant facilities. The
average annual generation is estimated
to be 9.5 gigawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item (h) above.
All filings must (1) Bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
E:\FR\FM\06JYN1.SGM
06JYN1
Federal Register / Vol. 75, No. 128 / Tuesday, July 6, 2010 / Notices
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notices of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of wavier of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–16280 Filed 7–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–455–000]
Tennessee Gas Pipeline Company;
Notice of Application
wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1
June 24, 2010.
Take notice that on June 11, 2010,
Tennessee Gas Pipeline Company
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002, filed in the
above referenced docket an application
pursuant to section 7(b) of the Natural
Gas Act (NGA) and Part 157 of the
Commission’s regulations, requesting
authorization to abandon in place and
by removal an inactive supply lateral,
designated as Line No. 524C–600. The
Supply Lateral consists of
approximately 16.2 miles of 12-inch
diameter pipeline and associated
appurtenances located in the Bay
VerDate Mar<15>2010
14:52 Jul 02, 2010
Jkt 220001
Marchand area of State waters,
Lafourche Parish, Louisiana, and in the
South Timbalier area in Federal offshore
waters of the Outer Continental Shelf.
Tennessee states that the subject
facilities have been out of service due to
damages received by Hurricane Ike in
September 2008, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing is available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application may be directed to Thomas
G. Joyce, Manager, Certificates,
Tennessee Gas Pipeline Company, 1001
Louisiana Street, Houston, Texas 77002,
by telephone at (713) 420–3299, by
facsimile at (713) 420–1473, or by e-mail
at tom.joyce@elpaso.com; Susan T.
Halbach, Senior Counsel, Tennessee Gas
Pipeline Company, 1001 Louisiana
Street, Houston, Texas 77002, by
telephone at (713) 420–5751, by
facsimile at (713) 420–1601, or by e-mail
at susan.halbach@elpaso.com; or Debbie
Kalisek, Regulatory Analyst, Tennessee
Gas Pipeline Company, 1001 Louisiana
Street, Houston, Texas 77002, by
telephone at (713) 420–3292, by
facsimile at (713) 420–1473, or by e-mail
at debbie.kalisek@elpaso.com.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
38801
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: July 15, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–16278 Filed 7–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR10–41–000]
PELICO Pipeline, LLC; Notice of
Baseline Filing
June 28, 2010.
Take notice that on June 22, 2010,
PELICO Pipeline, LLC submitted a
baseline filing of its Statement of
Operating Conditions for services
provided under section 311 of the
Natural Gas Policy Act of 1978 (NGPA).
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
E:\FR\FM\06JYN1.SGM
06JYN1
Agencies
[Federal Register Volume 75, Number 128 (Tuesday, July 6, 2010)]
[Notices]
[Pages 38800-38801]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-16280]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12740-003]
Jordan Hydroelectric Limited Partnership; Notice of Application
Ready for Environmental Analysis and Soliciting Comments,
Recommendations, Terms and Conditions, and Prescriptions
June 28, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major Original License.
b. Project No.: P-12740-003.
c. Date filed: July 13, 2009.
d. Applicant: Jordan Hydroelectric Limited Partnership.
e. Name of Project: Flannagan Hydroelectric Project.
f. Location: On the Pound River, in the Town of Clintwood, in
Dickenson County, Virginia. The project would occupy Federal land
managed by the U.S. Army Corps of Engineers.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. James B. Price, W.V. Hydro, Inc., P.O.
Box 903, Gatlinburg, TN 37738 (865) 436-0402.
i. FERC Contact: Gaylord Hoisington, (202) 502-6032 or
gaylord.hoisington@FERC.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions is 60 days from the issuance date of this
notice; reply comments are due 105 days from issuance date of this
notice.
All documents may be filed electronically via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site (https://www.ferc.gov/docs-filing/ferconline.asp)
under the ``eFiling'' link. For a simpler method of submitting text
only comments click on ``Quick Comment.'' For assistance, please
contact FERC Online support at FERCOnlineSupport@ferc.gov; call toll-
free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although
the Commission strongly encourages electronic filings, documents may
also be paper-filed. To paper-file, mail an original and eight copies
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
l. The proposed project would utilize the existing U.S. Army Corps
of Engineers' (Corps) Flannagan dam, intake tower, outlet works, and
reservoir and would consist of: (1) Three new turbine generating units
located within the existing intake tower having a total installed
capacity of 3 megawatts; (2) a new control booth on the intake tower;
(3) a new substation near the Corps' existing service bridge; (4) new
transmission leads connecting the generating units to Appalachian Power
Company's existing transmission line; and (5) appurtenant facilities.
The average annual generation is estimated to be 9.5 gigawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item (h) above.
All filings must (1) Bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain
[[Page 38801]]
copies of the application directly from the applicant. Each filing must
be accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notices of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of wavier of water quality certification.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-16280 Filed 7-2-10; 8:45 am]