Notice of Availability of Draft Environmental Impact Statement for the Proposed Folsom South of U.S. Highway 50 Specific Plan Project, in Sacramento County, CA, Corps Permit Application Number SPK-2007-02159, 38500-38501 [2010-16135]
Download as PDF
38500
Federal Register / Vol. 75, No. 127 / Friday, July 2, 2010 / Notices
emcdonald on DSK2BSOYB1PROD with NOTICES
questions on risk factors for poor
civilian readjustment, and other
biographical and psychological content.
DoD regulations stipulate that all
military personnel must receive preseparation counseling no less than 90
days before leaving active duty.
NHRC proposes tracking over time the
mental well-being of eligible baseline
respondents for the longitudinal portion
of the study through a follow-on survey
3 to 6 months after separation from
military service, after they have
completed the transition from military
to civilian life. Data from extant
historical personnel and medical files
will also be combined with survey data
to develop models that demonstrate the
influence of combat, and a variety of
covariates, on mental health symptoms,
resilience, and substance abuse. We
estimate that approximately 1,850 of the
2,700 baseline participants will be
eligible for and consent to participate in
the follow-up survey. In order to
facilitate locating these respondents, the
baseline questionnaire requested
participants provide name, relocation
plans, names and contact information
for two friends or relatives who always
know where the respondent is living,
and the respondent’s date of birth and
social security number. The follow-up
survey will be sent to respondents
through the mail. Respondents will also
have the option of completing this
survey via the Web, which will closely
simulate the hardcopy version of the
instrument.
Affected Public: Marine Corps
personnel who have separated from the
Military in the six-month period
following the baseline survey.
Annual Burden Hours: 1,850.
Number of Respondents: 1,850.
Responses per Respondent: 1.
Average Burden per Response: 1 hour.
Frequency: One time.
SUPPLEMENTARY INFORMATION:
Summary of Information Collection
This study population is unique
because there is a need for longitudinal
mental health research in the Military
that spans both Active Duty and the
period of reintegration into civilian life
after combat exposure. Given that
disability and poor physical health were
significant predictors of mental health
problems in the pilot study, that stigma
continues to be an issue for military
personnel seeking mental health care,
and that significant difficulties remain
in transitioning mental health care, this
type of program would appear
especially appropriate and suited for
implementation in the U.S. military.
The follow-up survey will consist of
a mailed paper-and-pencil questionnaire
VerDate Mar<15>2010
18:27 Jul 01, 2010
Jkt 220001
with the option of completing the
questionnaire via the Web. All
participants from the baseline survey
who have separated from military
service since completion of the baseline
survey will be eligible for the second
phase of study and their participation in
the follow-up survey will be requested.
Respondents were informed during the
Introductory Briefing to the baseline
survey that they may be contacted for a
follow-up interview.
Approximately 15 percent of Military
personnel are women. Therefore, it is
estimated that 15 percent will be the
proportion of women completing the
survey; the remaining 85 percent will be
male respondents.
Dated: June 28, 2010.
Mitchell S. Bryman,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2010–16089 Filed 7–1–10; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Department of the Army
Corps of Engineers
Notice of Availability of Draft
Environmental Impact Statement for
the Proposed Folsom South of U.S.
Highway 50 Specific Plan Project, in
Sacramento County, CA, Corps Permit
Application Number SPK–2007–02159
AGENCY: Department of the Army, U.S.
Army Corps of Engineers, DOD.
ACTION: Notice of availability.
SUMMARY: Pursuant to the National
Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers (USACE),
Sacramento District has prepared a Draft
Environmental Impact Statement (DEIS)
that analyzes the potential effects of
implementing each of six on-site landuse and eleven off-site water supply/
alignment alternative scenarios for a
large-scale, mixed-use, mixed-density
master planned community on the
approximately 3,502-acre Folsom South
of U.S. Highway 50 Specific Plan area
(SPA), located within the Sphere of
Influence of the City of Folsom,
Sacramento County, California. The
DEIS has been prepared as a joint
document with the City of Folsom
(City). The City is the local agency
responsible for preparing an
Environmental Impact Report in
compliance with the California
Environmental Quality Act (CEQA).
The DEIS documents the existing
condition of environmental resources in
and around areas considered for
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
development, and potential impacts on
those resources as a result of
implementing the alternatives. The onsite land use alternatives considered in
detail are: (1) No Project Alternative (No
development for both land use and
water supply/alignment); (2) No USACE
Permit Alternative (no discharge of
dredged and/or fill material into waters
of the U.S.); (3) Proposed Project
Alternative, the Applicants’ Preferred
Alternative; (4) Resource Impact
Minimization Alternative; (5)
Centralized Development Alternative;
and (6) Reduced Hillside Development
Alternative. The off-site water supply/
alignment alternatives considered in
detail are: (1) No USACE Permit
Alternative (no discharge of dredged
and/or fill material into waters of the
U.S.); (2) Proposed Off-site Water
Facility Alternative—Raw Water
Conveyance—Grant Line Road
Alignment and On-site WTP; (3) Off-site
Water Facility Alternative 1—Raw
Water Conveyance—Grant Line Road
Alignment and White Rock WTP; (4)
Off-site Water Facility Alternative 1A—
Raw Water Conveyance—Grant Line
Road Route Variation Alignment and
White Rock WTP; (5) Off-site Water
Facility Alternative 2—Treated Water
Conveyance—Douglas Road Alignment
and Vineyard SWTP; (6) Off-site Water
Facility Alternative 2A—Treated Water
Conveyance—Douglas Road Route
Variation Alignment and Vineyard
SWTP; (7) Off-site Water Facility
Alternative 2B—Treated Water
Conveyance—North Douglas Tanks
Variation Alignment and Vineyard
SWTP; (8) Off-site Water Facility
Alternative 3—Raw Water
Conveyance—Douglas Road Alignment
and White Rock WTP; (9) Off-site Water
Facility Alternative 3A—Raw Water
Conveyance—Douglas Road Route
Variation Alignment and White Rock
WTP; (10) Off-site Water Facility
Alternative 4—Raw Water Conveyance
to Folsom Boulevard Alignment and
Folsom Boulevard WTP; and (11) Offsite Water Facility Alternative 4A—Raw
Water Conveyance to Folsom
Boulevard—Route Variation Alignment
and Folsom Boulevard WTP.
DATES: All written comments must be
postmarked on or before September 7,
2010. The USACE and the City will
jointly conduct a public meeting that
will be held on August 2, 2010 from 5
p.m. to 7 p.m. The public meeting will
be held at the Folsom Community
Center, 52 Natoma Street, Folsom,
California 95630.
ADDRESSES: Comments may be
submitted in writing to: Lisa M. Gibson,
U.S. Army Corps of Engineers,
E:\FR\FM\02JYN1.SGM
02JYN1
emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 75, No. 127 / Friday, July 2, 2010 / Notices
Sacramento District, Regulatory
Division; 1325 J Street, Room 1480,
Sacramento, California 95814–2922, or
via e-mail to
Lisa.M.Gibson2@usace.army.mil. Oral
and written comments may also be
submitted at the public meeting
described in the DATES section.
FOR FURTHER INFORMATION CONTACT: Lisa
M. Gibson, (916) 557–5288, or via e-mail
at Lisa.M.Gibson2@usace.army.mil.
SUPPLEMENTARY INFORMATION: The South
Folsom Property Owners Group, the
project applicants, are seeking adoption
by the City of the proposed SPA project
and associated entitlements. The City
and the South Folsom Property Owners
Group are also seeking authorization
from USACE for the placement of
dredged or fill material into waters of
the United States pursuant to Section
404 of the Clean Water Act. The
Proposed Project includes 10,210
residential units at various densities on
a total of 1,477.2 acres; 362.8 acres
designated for commercial and
industrial use, including a regional
shopping center; public/quasi-public
uses; elementary, middle, and high
schools on 179.3 acres; 121.7 acres of
community and neighborhood parks;
stormwater detention basins; 1,053.1
acres of open-space areas and openspace preserves; and major roads with
landscaping. In addition, the proposed
project includes the construction of
several off-site infrastructure facilities,
including intersection expansions to
allow access to and from U.S. 50 and the
SPA, an overpass of U.S. 50, two
roadway connections and sewer
pipelines from the SPA into El Dorado
Hills, a sewer force main connection to
the existing City system, a detention
basin and water pipelines and facilities.
The SPA contains approximately 84.94
acres of waters of the U.S. The proposed
land-use plan would involve the
discharge of fill material into
approximately 39.50 acres of waters of
the U.S., and indirect impacts to 0.29
acres of waters of the U.S. resulting from
fragmentation of existing waters. In
addition, the proposed land-use plan
involves the preservation of
approximately 44.19 acres of waters of
the U.S., concentrated primarily on the
Alder Creek corridor and adjacent
tributaries and wetlands.
For the proposed off-site water
supply/alignment for the SPA, the City
is proposing off-site water facilities that
would involve the permanent
assignment to the City of the contractual
entitlements to Central Valley Project
(CVP) contract entitlement water,
totaling not more than 8,000 acre-feet
per year (AFY) from the Natomas
VerDate Mar<15>2010
18:27 Jul 01, 2010
Jkt 220001
Central Mutual Water Company
(NCMWC), diverting the water supply
from the Sacramento River and
conveying the water to the SPA. The
proposed water supply would also
involve the City purchasing dedicated
capacity within the Freeport Regional
Water Project (Freeport Project) from
Sacramento County Water Agency
(SCWA), which would serve as the
point of diversion (POD) on the
Sacramento River and partial
conveyance pathway for not more than
6,000 AFY purchased from NCMWC.
The City proposes to add the Freeport
POD to the assigned CVP water to
facilitate the diversion of these supplies
at the existing Freeport Project
diversion. The City proposes to pump
and convey the assigned NCMWC CVP
water supply through the Freeport
Project diversion facility and
conveyance pipeline to the point where
SCWA and East Bay Municipal Utility
District pipelines split. The City would
then construct new water supply
conveyance infrastructure from the
bifurcation point to the SPA within an
approximately 200-foot corridor. The
corridor for the proposed construction
of the water line and the proposed
location for water treatment plants
contains approximately 50.7 acres of
waters of the U.S. The estimate of
waters of the U.S. within the proposed
water supply corridor was determined
based on aerial photographs and
National Wetland Inventory maps, and
has not been field delineated or verified
by USACE. Because the City has not yet
completed project specific engineering
details for the proposed off-site water
supply/alignment, the exact impacts to
waters of the U.S. cannot be determined.
However, construction of the water
supply infrastructure is expected to
occur within an area of less than 100feet in width, and, depending on which
side of the corridor construction would
occur, would impact an estimated 5.7
acres or 6.8 acres of waters of the U.S.
USACE invites full public
participation to promote open
communication and better decisionmaking. All persons and organizations
that have an interest in the SPA are
urged to participate in the NEPA
process.
An electronic version of the DEIS may
be viewed at the USACE, Sacramento
District Web site: https://www.spk.usace.
army.mil/organizations/cespk-co/
regulatory/EISs/EIS-index.html: In
addition, a hardcopy of the DEIS may
also be reviewed at the following
locations:
(1) City of Folsom City Hall,
Community Development Department,
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
38501
50 Natoma Street, Folsom, California
95630.
(2) Folsom Public Library, Georgia
Murray Building, 411 Stafford Street,
Folsom, California 95630.
June 23, 2010.
Thomas C. Chapman,
Colonel, U.S. Army, District Engineer.
[FR Doc. 2010–16135 Filed 7–1–10; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army
Corps of Engineers
The Release of the Final Environmental
Impact Statement (FEIS) for the Town
of Nags Head Proposed Beach
Nourishment Project in Dare County,
NC
AGENCY: Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice.
SUMMARY: The U.S. Army Corps of
Engineers (COE), Wilmington District,
Regulatory Division, has been reviewing
a request for Department of the Army
authorization, pursuant to Section 404
of the Clean Water Act and Section 10
of the Rivers and Harbors Act of 1899,
from the Town of Nags Head to dredge
up to 4.6 million cubic yards of beachquality sediment from an offshore
borrow source, and deposit the material
along approximately 10 miles of ocean
shoreline in the Town of Nags Head.
The applicant proposes to utilize a
self-contained hopper dredge during a
proposed construction window from
April through September to undertake
the dredging operations and discharge
the sand on the beach via submerged
pipeline. The applicant’s proposed
borrow areas include sites identified as
having beach quality material in the
U.S. Army Corps of Engineers,
Wilmington District’s EIS, entitled Final
Feasibility Report and Environmental
Impact Statement on Hurricane
Protection and Beach Erosion Control,
dated September 2000 (USACE 2000).
DATES: Written comments on the Final
EIS will be received until July 26, 2010.
ADDRESSES: Copies of comments and
questions regarding the Final EIS may
be addressed to: U.S. Army Corps of
Engineers, Wilmington District,
Washington Regulatory Field Office.
ATTN: File Number 200640282, 2407
W. Fifth Street, Washington, NC 27889.
Copies of the Draft EIS can be reviewed
on the Wilmington District Regulatory
homepage at, https://
www.saw.usace.army.mil/wetlands/
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 75, Number 127 (Friday, July 2, 2010)]
[Notices]
[Pages 38500-38501]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-16135]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Corps of Engineers
Notice of Availability of Draft Environmental Impact Statement
for the Proposed Folsom South of U.S. Highway 50 Specific Plan Project,
in Sacramento County, CA, Corps Permit Application Number SPK-2007-
02159
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers (USACE), Sacramento District has prepared
a Draft Environmental Impact Statement (DEIS) that analyzes the
potential effects of implementing each of six on-site land-use and
eleven off-site water supply/alignment alternative scenarios for a
large-scale, mixed-use, mixed-density master planned community on the
approximately 3,502-acre Folsom South of U.S. Highway 50 Specific Plan
area (SPA), located within the Sphere of Influence of the City of
Folsom, Sacramento County, California. The DEIS has been prepared as a
joint document with the City of Folsom (City). The City is the local
agency responsible for preparing an Environmental Impact Report in
compliance with the California Environmental Quality Act (CEQA).
The DEIS documents the existing condition of environmental
resources in and around areas considered for development, and potential
impacts on those resources as a result of implementing the
alternatives. The on-site land use alternatives considered in detail
are: (1) No Project Alternative (No development for both land use and
water supply/alignment); (2) No USACE Permit Alternative (no discharge
of dredged and/or fill material into waters of the U.S.); (3) Proposed
Project Alternative, the Applicants' Preferred Alternative; (4)
Resource Impact Minimization Alternative; (5) Centralized Development
Alternative; and (6) Reduced Hillside Development Alternative. The off-
site water supply/alignment alternatives considered in detail are: (1)
No USACE Permit Alternative (no discharge of dredged and/or fill
material into waters of the U.S.); (2) Proposed Off-site Water Facility
Alternative--Raw Water Conveyance--Grant Line Road Alignment and On-
site WTP; (3) Off-site Water Facility Alternative 1--Raw Water
Conveyance--Grant Line Road Alignment and White Rock WTP; (4) Off-site
Water Facility Alternative 1A--Raw Water Conveyance--Grant Line Road
Route Variation Alignment and White Rock WTP; (5) Off-site Water
Facility Alternative 2--Treated Water Conveyance--Douglas Road
Alignment and Vineyard SWTP; (6) Off-site Water Facility Alternative
2A--Treated Water Conveyance--Douglas Road Route Variation Alignment
and Vineyard SWTP; (7) Off-site Water Facility Alternative 2B--Treated
Water Conveyance--North Douglas Tanks Variation Alignment and Vineyard
SWTP; (8) Off-site Water Facility Alternative 3--Raw Water Conveyance--
Douglas Road Alignment and White Rock WTP; (9) Off-site Water Facility
Alternative 3A--Raw Water Conveyance--Douglas Road Route Variation
Alignment and White Rock WTP; (10) Off-site Water Facility Alternative
4--Raw Water Conveyance to Folsom Boulevard Alignment and Folsom
Boulevard WTP; and (11) Off-site Water Facility Alternative 4A--Raw
Water Conveyance to Folsom Boulevard--Route Variation Alignment and
Folsom Boulevard WTP.
DATES: All written comments must be postmarked on or before September
7, 2010. The USACE and the City will jointly conduct a public meeting
that will be held on August 2, 2010 from 5 p.m. to 7 p.m. The public
meeting will be held at the Folsom Community Center, 52 Natoma Street,
Folsom, California 95630.
ADDRESSES: Comments may be submitted in writing to: Lisa M. Gibson,
U.S. Army Corps of Engineers,
[[Page 38501]]
Sacramento District, Regulatory Division; 1325 J Street, Room 1480,
Sacramento, California 95814-2922, or via e-mail to
Lisa.M.Gibson2@usace.army.mil. Oral and written comments may also be
submitted at the public meeting described in the DATES section.
FOR FURTHER INFORMATION CONTACT: Lisa M. Gibson, (916) 557-5288, or via
e-mail at Lisa.M.Gibson2@usace.army.mil.
SUPPLEMENTARY INFORMATION: The South Folsom Property Owners Group, the
project applicants, are seeking adoption by the City of the proposed
SPA project and associated entitlements. The City and the South Folsom
Property Owners Group are also seeking authorization from USACE for the
placement of dredged or fill material into waters of the United States
pursuant to Section 404 of the Clean Water Act. The Proposed Project
includes 10,210 residential units at various densities on a total of
1,477.2 acres; 362.8 acres designated for commercial and industrial
use, including a regional shopping center; public/quasi-public uses;
elementary, middle, and high schools on 179.3 acres; 121.7 acres of
community and neighborhood parks; stormwater detention basins; 1,053.1
acres of open-space areas and open-space preserves; and major roads
with landscaping. In addition, the proposed project includes the
construction of several off-site infrastructure facilities, including
intersection expansions to allow access to and from U.S. 50 and the
SPA, an overpass of U.S. 50, two roadway connections and sewer
pipelines from the SPA into El Dorado Hills, a sewer force main
connection to the existing City system, a detention basin and water
pipelines and facilities. The SPA contains approximately 84.94 acres of
waters of the U.S. The proposed land-use plan would involve the
discharge of fill material into approximately 39.50 acres of waters of
the U.S., and indirect impacts to 0.29 acres of waters of the U.S.
resulting from fragmentation of existing waters. In addition, the
proposed land-use plan involves the preservation of approximately 44.19
acres of waters of the U.S., concentrated primarily on the Alder Creek
corridor and adjacent tributaries and wetlands.
For the proposed off-site water supply/alignment for the SPA, the
City is proposing off-site water facilities that would involve the
permanent assignment to the City of the contractual entitlements to
Central Valley Project (CVP) contract entitlement water, totaling not
more than 8,000 acre-feet per year (AFY) from the Natomas Central
Mutual Water Company (NCMWC), diverting the water supply from the
Sacramento River and conveying the water to the SPA. The proposed water
supply would also involve the City purchasing dedicated capacity within
the Freeport Regional Water Project (Freeport Project) from Sacramento
County Water Agency (SCWA), which would serve as the point of diversion
(POD) on the Sacramento River and partial conveyance pathway for not
more than 6,000 AFY purchased from NCMWC. The City proposes to add the
Freeport POD to the assigned CVP water to facilitate the diversion of
these supplies at the existing Freeport Project diversion. The City
proposes to pump and convey the assigned NCMWC CVP water supply through
the Freeport Project diversion facility and conveyance pipeline to the
point where SCWA and East Bay Municipal Utility District pipelines
split. The City would then construct new water supply conveyance
infrastructure from the bifurcation point to the SPA within an
approximately 200-foot corridor. The corridor for the proposed
construction of the water line and the proposed location for water
treatment plants contains approximately 50.7 acres of waters of the
U.S. The estimate of waters of the U.S. within the proposed water
supply corridor was determined based on aerial photographs and National
Wetland Inventory maps, and has not been field delineated or verified
by USACE. Because the City has not yet completed project specific
engineering details for the proposed off-site water supply/alignment,
the exact impacts to waters of the U.S. cannot be determined. However,
construction of the water supply infrastructure is expected to occur
within an area of less than 100-feet in width, and, depending on which
side of the corridor construction would occur, would impact an
estimated 5.7 acres or 6.8 acres of waters of the U.S.
USACE invites full public participation to promote open
communication and better decision-making. All persons and organizations
that have an interest in the SPA are urged to participate in the NEPA
process.
An electronic version of the DEIS may be viewed at the USACE,
Sacramento District Web site: https://www.spk.usace.army.mil/organizations/cespk-co/regulatory/EISs/EIS-index.html: In addition, a
hardcopy of the DEIS may also be reviewed at the following locations:
(1) City of Folsom City Hall, Community Development Department, 50
Natoma Street, Folsom, California 95630.
(2) Folsom Public Library, Georgia Murray Building, 411 Stafford
Street, Folsom, California 95630.
June 23, 2010.
Thomas C. Chapman,
Colonel, U.S. Army, District Engineer.
[FR Doc. 2010-16135 Filed 7-1-10; 8:45 am]