Tallulah Gas Storage LLC; Notice of Application, 36376-36377 [2010-15387]

Download as PDF 36376 Federal Register / Vol. 75, No. 122 / Friday, June 25, 2010 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–452–000] Natural Gas Pipeline Company of America LLC; Notice of Application mstockstill on DSKH9S0YB1PROD with NOTICES June 17, 2010. Take notice that on June 8, 2010, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, 7th Floor, Downers Grove, Illinois 60515–7918, filed in Docket Number CP10–452–000, pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA), an application to abandon two injection/withdrawal wells and appurtenant facilities in the Columbus City storage field, located in Louisa County, Iowa, and a certificate of public convenience and necessity to construct, and operate two replacement wells, increase the cumulative peak day deliverability in the Columbus City St. Peter reservoir from 45 MMcf/d to 55 MMcf/d, and provide an additional 0.5 Bcf of storage service from the Columbus City St. Peter reservoir. The total cost for the proposed facilities is $2,914,853 plus $300,000 for the proposed abandonment. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Any questions regarding this Application should be directed to Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of America, LLC, 3250 Lacey Road, 7th Floor, Downers Grove, Illinois 60515–7918, phone (630) 725–3070 or bruce_newsome@kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record VerDate Mar<15>2010 16:23 Jun 24, 2010 Jkt 220001 for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: July 8, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–15384 Filed 6–24–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–456–000] Tallulah Gas Storage LLC; Notice of Application June 17, 2010. Take notice that on June 11, 2010, Tallulah Gas Storage LLC (Petitioner), 10370 Richmond Avenue, Suite 510, Houston, TX 77042, filed in Docket No. CP10–456–000, a petition for Exemption of Temporary Acts and Operations from Certificate Requirements, pursuant to Rule 207(a)(5) of the Commission’s Rules of Practice and Procedure, and section 7(c)(1)(B) of the Natural Gas Act (NGA), to perform specific temporary activity related to drill site preparation and the drilling of two stratigraphic test wells located in Madison Parish, Louisiana to determine the salt characteristics and the feasibility of developing the South Tallulah salt dome for natural gas storage and the feasibility of brine disposal, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, call (202) 502–8659 or TTY, (202) 208–3676. Any questions regarding this application should be directed to Mark Fullerton, Tallulah Gas Storage LLC, 10370 Richmond Avenue, Suite 510, Houston, TX 77042, or by calling (713) 403–6454 (telephone) or (713) 403–6461 (fax), mfullerton@icon-ngs.com, or to E:\FR\FM\25JNN1.SGM 25JNN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 75, No. 122 / Friday, June 25, 2010 / Notices Anita R.Wilson, John S. Decker, or Damien R. Lyster, Vinson & Elkins L.L.P., 1455 Pennsylvania Avenue, NW., Suite 600, Washington, DC 20004–1008, or by calling (202) 639–6599 (telephone) or (202) 879–8899 (fax), jdecker@velaw.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone VerDate Mar<15>2010 16:23 Jun 24, 2010 Jkt 220001 will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: July 1, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–15387 Filed 6–24–10; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 36377 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12721–004] Pepperell Hydro Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene June 17, 2010. On March 9, 2010, the Pepperell Hydro Company, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the East Pepperell Project, located on the Nashua River in Middlesex County, Massachusetts. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) The existing 27-foot-high, 275foot-long East Pepperell Dam; (2) an existing intake; (3) an existing 1,465acre impoundment at a normal maximum water surface elevation of 199.8 feet above mean sea level (with 3foot-high flashboards in place); (4) an existing 13-foot-diameter, 666-foot-long wood stave penstock; (5) a powerhouse containing three existing generating units and a new low-flow turbine generator located adjacent to the intake gates with a total installed capacity of 2,070 kilowatts; (6) an existing tailrace; (7) an existing switchyard; (8) an existing 7.5-mile-long, 69-kilovolt transmission line owned by National Grid; and (9) appurtenant facilities. The project would have an estimated average annual generation of approximately 8,123 megawatt-hours. Applicant Contact: Peter B. Clark, Pepperell Hydro Company LLC, P.O. Box 149, 823 Bay Road, Hamilton, MA 01936, (978) 468–3999. FERC Contact: Brandon Cherry, (202) 502–8328. Deadline for filing comments or motions to intervene: 60 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please E:\FR\FM\25JNN1.SGM 25JNN1

Agencies

[Federal Register Volume 75, Number 122 (Friday, June 25, 2010)]
[Notices]
[Pages 36376-36377]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-15387]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP10-456-000]


Tallulah Gas Storage LLC; Notice of Application

June 17, 2010.
    Take notice that on June 11, 2010, Tallulah Gas Storage LLC 
(Petitioner), 10370 Richmond Avenue, Suite 510, Houston, TX 77042, 
filed in Docket No. CP10-456-000, a petition for Exemption of Temporary 
Acts and Operations from Certificate Requirements, pursuant to Rule 
207(a)(5) of the Commission's Rules of Practice and Procedure, and 
section 7(c)(1)(B) of the Natural Gas Act (NGA), to perform specific 
temporary activity related to drill site preparation and the drilling 
of two stratigraphic test wells located in Madison Parish, Louisiana to 
determine the salt characteristics and the feasibility of developing 
the South Tallulah salt dome for natural gas storage and the 
feasibility of brine disposal, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. This filing may also be viewed on the Commission's Web site 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits, in the docket number field to 
access the document. For assistance, call (202) 502-8659 or TTY, (202) 
208-3676.
    Any questions regarding this application should be directed to Mark 
Fullerton, Tallulah Gas Storage LLC, 10370 Richmond Avenue, Suite 510, 
Houston, TX 77042, or by calling (713) 403-6454 (telephone) or (713) 
403-6461 (fax), ngs.com">mfullerton@icon-ngs.com, or to

[[Page 36377]]

Anita R.Wilson, John S. Decker, or Damien R. Lyster, Vinson & Elkins 
L.L.P., 1455 Pennsylvania Avenue, NW., Suite 600, Washington, DC 20004-
1008, or by calling (202) 639-6599 (telephone) or (202) 879-8899 (fax), 
jdecker@velaw.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify Federal and State agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all Federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: July 1, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-15387 Filed 6-24-10; 8:45 am]
BILLING CODE 6717-01-P