Criterion Power Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 36380-36381 [2010-15386]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
36380
Federal Register / Vol. 75, No. 122 / Friday, June 25, 2010 / Notices
Docket Numbers: RR10–11–000.
Applicants: North American Electric
Reliability Corporation.
Description: Supplement to North
American Electric Reliability
Corporation Petition for Approval of
Revised Pro Forma Delegation
Agreement, Revised Delegation
Agreements with the Eight Regional
Entities, and Amendments to the NERC
Rules of Procedure.
Filed Date: 06/17/2010.
Accession Number: 20100617–5091.
Comment Date: 5 p.m. Eastern Time
on Friday, July 09, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
VerDate Mar<15>2010
16:23 Jun 24, 2010
Jkt 220001
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–15374 Filed 6–24–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EG10–12–000; EG10–24–000]
Green County Operating Services,
LLC; El Cajon Energy, LLC; Notice of
Effectiveness of Exempt Wholesale
Generator Status
June 18, 2010.
Take notice that during the month of
April/May 2010, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–15392 Filed 6–24–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–1443–000]
Criterion Power Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
June 17, 2010.
This is a supplemental notice in the
above-referenced proceeding of
Criterion Power partners, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 6, 2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
E:\FR\FM\25JNN1.SGM
25JNN1
Federal Register / Vol. 75, No. 122 / Friday, June 25, 2010 / Notices
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–15386 Filed 6–24–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[Docket No. ER10–1452–000]
Kimberly D. Bose,
Secretary.
Vitol Inc.; Supplemental Notice That
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
[FR Doc. 2010–15391 Filed 6–24–10; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on DSKH9S0YB1PROD with NOTICES
June 18, 2010.
DEPARTMENT OF ENERGY
This is a supplemental notice in the
above-referenced proceeding of Vitol
Inc.’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 7, 2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
Federal Energy Regulatory
Commission
VerDate Mar<15>2010
16:23 Jun 24, 2010
Jkt 220001
[Docket No. AD10–13–000]
Office of Energy Policy and Innovation;
Request for Comments Regarding
Rates, Accounting and Financial
Reporting for New Electric Storage
Technologies
June 11, 2010.
Dear Reader:
Pursuant to authority delegated to the
Director, Office of Energy Policy and
Innovation, under 18 CFR 375.315,
comments are requested in the abovereferenced docket regarding rates,
accounting and financial reporting
associated with services provided by
electric storage technologies.1
Commission staff has been
considering the growing interest in the
use of non-traditional technologies to
help meet the Nation’s electricity needs.
In particular, newer storage technologies
like flywheels and chemical batteries
have recently achieved technological
maturity and are well into successful
pilot stages and, in some cases,
commercial operation. The roles of
traditional generation, transmission, and
distribution assets within the electric
system are well understood and each
has set method(s) of rate recovery,
accounting and financial reporting.
However, the same is not necessarily
true of electric storage.
Under appropriate circumstances,
storage can act like any of the traditional
asset categories, and also like load. The
only electricity storage technology that
has been widely adopted to date,
pumped storage hydropower, was
generally built at a time when the
majority of utility assets were
constructed by vertically integrated
load-serving utilities at retail ratepayer
expense. In many parts of the country
today, entities other than vertically
integrated load-serving utilities have
expressed interest in building and
owning electric storage assets of varying
sizes. Suggested business models range
from traditional cost-of-service rates to
competing in wholesale commodity
trading; some are considering the
possibility of multiple revenue streams
which may blend both cost-of-service
recovery for some costs with other costs
being at risk in competitive wholesale
market transactions. For all of these
reasons, there is little case precedent to
guide industry and a divergence in
practice concerning how to develop
rates and categorize electric storage
costs for rate purposes.
Further, the Commission’s
accounting 2 and financial reporting
requirements 3 currently do not contain
specific accounting, functional
classification, and related FERC Form
No. 1 reporting requirements for new
storage technologies. Under a cost-ofservice ratemaking methodology, it is
critical for companies to accurately and
uniformly account and report financial
information and data to facilitate the
development and monitoring of rates.
Without this information, it would be
difficult for the Commission and others
to determine the costs related to new
storage technologies for cost-of-service
rate purposes.
In order to better understand the
various ways electric storage can be
used, where each of those uses would
fall within established jurisdictional
boundaries, and the appropriate rate
treatment, accounting classification, and
reporting requirements for those uses,
Commission staff seeks comment on the
attached document regarding
alternatives for categorizing and
compensating storage services, and in
particular ideas on how best to develop
rate policies that accommodate the
flexibility of storage, consistent with the
Federal Power Act.4 In addition, staff
welcomes comments about any other
aspects of these storage issues not
specifically raised in the attachment.
Persons wishing to comment on the
matters discussed herein should submit
comments to the Commission no later
than 45 days after the publication of this
notice in the Federal Register.
2 18
1 The
statements herein do not necessarily reflect
the views of the Commission.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
36381
CFR Part 101 (2009).
CFR Part 141 (2009).
4 16 U.S.C. 791a–825r (2006).
3 18
E:\FR\FM\25JNN1.SGM
25JNN1
Agencies
[Federal Register Volume 75, Number 122 (Friday, June 25, 2010)]
[Notices]
[Pages 36380-36381]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-15386]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER10-1443-000]
Criterion Power Partners, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
June 17, 2010.
This is a supplemental notice in the above-referenced proceeding of
Criterion Power partners, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to intervene or protest must serve a
copy of that document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is July 6, 2010.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed
[[Page 36381]]
docket(s). For assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-15386 Filed 6-24-10; 8:45 am]
BILLING CODE 6717-01-P