Thermalito Afterbay Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 35779 [2010-15143]

Download as PDF Federal Register / Vol. 75, No. 120 / Wednesday, June 23, 2010 / Notices Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12745) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–15139 Filed 6–22–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13794–000] Thermalito Afterbay Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications mstockstill on DSKH9S0YB1PROD with NOTICES June 16, 2010. On May 21, 2010, Thermalito Afterbay Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Thermalito Afterbay Small Hydroelectric Project, located at the California Department of Resources’ Thermalito afterbay dam on the Feather River, in Butte County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A total of 5 to 6 generation sets installed at Thermalito afterbay dam and Thermalito afterbay outlet, with a total capacity of about 10 megawatts; (2) a switchyard and about 5 miles of 69 kilovolt (kV) transmission line to connect to PG&E’s existing 69-kV transmission line at Thermalito pumping–generating plant; (3) a maintenance crane installed on top of each dam; and (4) a control station within 300 feet of the Thermalito VerDate Mar<15>2010 16:17 Jun 22, 2010 Jkt 220001 afterbay dam. The proposed project would have a total average annual generation of 57 gigawatt-hours. ´ Applicant Contact: Magnus ´ Johannesson, Thermalito Afterbay Hydro, LLC, 28605 Quailhill Drive, Ranch Palos Verdes, CA 90275; phone: (310) 699–6400. FERC Contact: Jim Fargo, 202–502– 6095. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13794) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–15143 Filed 6–22–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–449–000] Northern Natural Gas Company; Notice of Application June 16, 2010. Take notice that on June 2, 2010, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed with the PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 35779 Federal Energy Regulatory Commission an application under section 7 of the Natural Gas Act, for a certificate of public convenience and necessity authorizing the increase in certificated capacity at its Redfield storage field, located in Dallas County, Iowa, and to provide 2.0 Bcf of firm natural gas storage service at market-based rates, all as more fully set forth in the request which is on file with the Commission and open to public inspection. Any questions regarding this application should be directed to Michael T. Loeffler, Senior Director, Certificates and External Affairs for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, at (402) 398– 7103 or Bret Fritch, Senior Regulatory Analyst, at (402) 398–7140. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the E:\FR\FM\23JNN1.SGM 23JNN1

Agencies

[Federal Register Volume 75, Number 120 (Wednesday, June 23, 2010)]
[Notices]
[Page 35779]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-15143]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13794-000]


Thermalito Afterbay Hydro, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions to 
Intervene, and Competing Applications

June 16, 2010.
    On May 21, 2010, Thermalito Afterbay Hydro, LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act, proposing to study the feasibility of the Thermalito 
Afterbay Small Hydroelectric Project, located at the California 
Department of Resources' Thermalito afterbay dam on the Feather River, 
in Butte County, California. The sole purpose of a preliminary permit, 
if issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following:
    (1) A total of 5 to 6 generation sets installed at Thermalito 
afterbay dam and Thermalito afterbay outlet, with a total capacity of 
about 10 megawatts; (2) a switchyard and about 5 miles of 69 kilovolt 
(kV) transmission line to connect to PG&E's existing 69-kV transmission 
line at Thermalito pumping-generating plant; (3) a maintenance crane 
installed on top of each dam; and (4) a control station within 300 feet 
of the Thermalito afterbay dam. The proposed project would have a total 
average annual generation of 57 gigawatt-hours.
    Applicant Contact: Magn[uacute]s J[oacute]hannesson, Thermalito 
Afterbay Hydro, LLC, 28605 Quailhill Drive, Ranch Palos Verdes, CA 
90275; phone: (310) 699-6400.
    FERC Contact: Jim Fargo, 202-502-6095.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13794) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-15143 Filed 6-22-10; 8:45 am]
BILLING CODE 6717-01-P