Download as PDF 35510 Federal Register / Vol. 75, No. 119 / Tuesday, June 22, 2010 / Notices srobinson on DSKHWCL6B1PROD with NOTICES 0001, or by fax to RDB at (301) 492– 3446. You can access publicly available documents related to this notice using the following methods: NRC’s Public Document Room (PDR): The public may examine and have copied for a fee publicly available documents at the NRC’s PDR, Room O1 F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. NRC’s Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available electronically at the NRC’s Electronic Reading Room at https://www.nrc.gov/ reading-rm/adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of NRC’s public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC’s PDR reference staff at 1–800–397–4209, 301–415–4737, or by e-mail to pdr.resource@nrc.gov. DG–1249 is available electronically under ADAMS Accession Number ML100490539. The regulatory analysis may be found in ADAMS under Accession No. ML101320317. In addition, electronic copies of DG–1249 are available through the NRC’s public Web site under Draft Regulatory Guides in the ‘‘Regulatory Guides’’ collection of the NRC’s Electronic Reading Room at https:// www.nrc.gov/reading-rm/doccollections/ Federal Rulemaking Web site: Public comments and supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID: NRC–2010–0216. Comments would be most helpful if received by August 20, 2010. Comments received after that date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time. Regulatory guides are not copyrighted, and Commission approval is not required to reproduce them. Dated at Rockville, Maryland, this 14th day of June, 2010. For the Nuclear Regulatory Commission. Andrea D. Valentin, Chief, Regulatory Guide Development Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2010–15022 Filed 6–21–10; 8:45 am] BILLING CODE 7590–01–P VerDate Mar<15>2010 16:17 Jun 21, 2010 Jkt 220001 SUPPLEMENTARY INFORMATION: NUCLEAR REGULATORY COMMISSION [NRC–2010–0219] License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Notice of availability. SUMMARY: The NRC is issuing a revision to its license renewal interim staff guidance (LR–ISG) process. This revision is entitled, ‘‘License Renewal Interim Staff Guidance Process, Revision 2’’ (revised LR–ISG process). The LR–ISG process describes the basic framework for developing and implementing interim changes to certain NRC license renewal guidance documents. These guidance documents facilitate the implementation of and NRC staff review of license renewal applications submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 54, ‘‘Requirements for Renewal of Operating Licenses for Nuclear Power Plants,’’ and Part 51, ‘‘Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions.’’ An electronic copy of the revised LR–ISG process is available in the NRC’s Agencywide Documents Access and Management System (ADAMS) under Accession No. ML100920158. The revised LR–ISG process supersedes the document entitled, ‘‘License Renewal Interim Staff Guidance Process, Revision 1’’ (ML091950069) (the previous LR–ISG process). FOR FURTHER INFORMATION CONTACT: Mr. Matthew Homiack, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone 301–415–1683; or email Matthew.Homiack@nrc.gov. ADDRESSES: Documents created or received after November 1, 1999, are available electronically at the NRC’s Public Electronic Reading Room on the Internet at https://www.nrc.gov/readingrm/adams.html. From this site, the public can gain entry into ADAMS. If you do not have access to the Internet or if there are any problems in accessing the documents located in ADAMS, contact the NRC Public Document Room reference staff at 1–800–397–4209, 301– 415–4737, or by e-mail at PDR.Resource@nrc.gov. The NRC posts LR–ISGs and the LR– ISG process on its public Web page under the ‘‘License Renewal’’ heading at https://www.nrc.gov/reading-rm/doccollections/isg. PO 00000 Frm 00074 Fmt 4703 Sfmt 9990 Background The NRC issued the previous LR–ISG process on August 7, 2009, and a notice of availability was published in the Federal Register on August 17, 2009 (74 FR 41461). In this previous process, the NRC staff addressed a recommendation from the NRC’s Office of the Inspector General (OIG) report, OIG–07–A–15, ‘‘Audit of the NRC’s License Renewal Program,’’ dated September 6, 2007 (ML072490486). Accordingly, enhancements were made to the LR–ISG process for the NRC staff to evaluate and document its determinations as to whether LR–ISGs meet the provisions of 10 CFR 54.37(b) and 10 CFR 50.109. As part of this evaluation, the previous LR– ISG process references a draft version of NRC Regulatory Issue Summary (RIS) 2007–16, Revision 1, ‘‘Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses.’’ At the time the previous process was issued, the NRC staff had not issued the final RIS 2007–16, Revision 1. After issuance of the previous LR–ISG process, the NRC staff identified the need to make some additional clarifications and administrative changes to the process. The clarifications concern the staff’s evaluation of LR–ISGs under 10 CFR 54.37(b) and 10 CFR 50.109 and the applicability of LR–ISGs to renewed license holders. The administrative changes include reference to the final RIS 2007–16, Revision 1, which the NRC issued on April 28, 2010 (ML100250279), and minor changes to the format and content of LR–ISG documents. The NRC staff incorporated these changes into the revised LR–ISG process, which was issued on June 14, 2010. The NRC did not publish a request for public comment in the Federal Register because of the administrative scope of the changes and clarifications. Final Action By this action, the NRC is notifying the public of issuance of the revised LR– ISG process. As of June 14, 2010, the NRC staff will use this process to guide the development and implementation of LR–ISGs. Dated at Rockville, Maryland, this 14th day of June 2010. For the Nuclear Regulatory Commission. Brian E. Holian, Director, Division of License Renewal, Office of Nuclear Reactor Regulation. [FR Doc. 2010–15023 Filed 6–21–10; 8:45 am] BILLING CODE 7590–01–P E:\FR\FM\22JNN1.SGM 22JNN1

Agencies

[Federal Register Volume 75, Number 119 (Tuesday, June 22, 2010)]
[Notices]
[Page 35510]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-15023]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2010-0219]


License Renewal Interim Staff Guidance Process, Revision 2 Notice 
of Availability

AGENCY: Nuclear Regulatory Commission (NRC).

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The NRC is issuing a revision to its license renewal interim 
staff guidance (LR-ISG) process. This revision is entitled, ``License 
Renewal Interim Staff Guidance Process, Revision 2'' (revised LR-ISG 
process). The LR-ISG process describes the basic framework for 
developing and implementing interim changes to certain NRC license 
renewal guidance documents. These guidance documents facilitate the 
implementation of and NRC staff review of license renewal applications 
submitted in accordance with Title 10 of the Code of Federal 
Regulations (10 CFR) Part 54, ``Requirements for Renewal of Operating 
Licenses for Nuclear Power Plants,'' and Part 51, ``Environmental 
Protection Regulations for Domestic Licensing and Related Regulatory 
Functions.'' An electronic copy of the revised LR-ISG process is 
available in the NRC's Agencywide Documents Access and Management 
System (ADAMS) under Accession No. ML100920158. The revised LR-ISG 
process supersedes the document entitled, ``License Renewal Interim 
Staff Guidance Process, Revision 1'' (ML091950069) (the previous LR-ISG 
process).

FOR FURTHER INFORMATION CONTACT: Mr. Matthew Homiack, Division of 
License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001; telephone 301-415-
1683; or e-mail Matthew.Homiack@nrc.gov.

ADDRESSES: Documents created or received after November 1, 1999, are 
available electronically at the NRC's Public Electronic Reading Room on 
the Internet at https://www.nrc.gov/reading-rm/adams.html. From this 
site, the public can gain entry into ADAMS. If you do not have access 
to the Internet or if there are any problems in accessing the documents 
located in ADAMS, contact the NRC Public Document Room reference staff 
at 1-800-397-4209, 301-415-4737, or by e-mail at PDR.Resource@nrc.gov.
    The NRC posts LR-ISGs and the LR-ISG process on its public Web page 
under the ``License Renewal'' heading at https://www.nrc.gov/reading-rm/doc-collections/isg.

SUPPLEMENTARY INFORMATION:

Background

    The NRC issued the previous LR-ISG process on August 7, 2009, and a 
notice of availability was published in the Federal Register on August 
17, 2009 (74 FR 41461). In this previous process, the NRC staff 
addressed a recommendation from the NRC's Office of the Inspector 
General (OIG) report, OIG-07-A-15, ``Audit of the NRC's License Renewal 
Program,'' dated September 6, 2007 (ML072490486). Accordingly, 
enhancements were made to the LR-ISG process for the NRC staff to 
evaluate and document its determinations as to whether LR-ISGs meet the 
provisions of 10 CFR 54.37(b) and 10 CFR 50.109. As part of this 
evaluation, the previous LR-ISG process references a draft version of 
NRC Regulatory Issue Summary (RIS) 2007-16, Revision 1, 
``Implementation of the Requirements of 10 CFR 54.37(b) for Holders of 
Renewed Licenses.'' At the time the previous process was issued, the 
NRC staff had not issued the final RIS 2007-16, Revision 1.
    After issuance of the previous LR-ISG process, the NRC staff 
identified the need to make some additional clarifications and 
administrative changes to the process. The clarifications concern the 
staff's evaluation of LR-ISGs under 10 CFR 54.37(b) and 10 CFR 50.109 
and the applicability of LR-ISGs to renewed license holders. The 
administrative changes include reference to the final RIS 2007-16, 
Revision 1, which the NRC issued on April 28, 2010 (ML100250279), and 
minor changes to the format and content of LR-ISG documents.
    The NRC staff incorporated these changes into the revised LR-ISG 
process, which was issued on June 14, 2010. The NRC did not publish a 
request for public comment in the Federal Register because of the 
administrative scope of the changes and clarifications.

Final Action

    By this action, the NRC is notifying the public of issuance of the 
revised LR-ISG process. As of June 14, 2010, the NRC staff will use 
this process to guide the development and implementation of LR-ISGs.

    Dated at Rockville, Maryland, this 14th day of June 2010.

    For the Nuclear Regulatory Commission.
Brian E. Holian,
Director, Division of License Renewal, Office of Nuclear Reactor 
Regulation.
[FR Doc. 2010-15023 Filed 6-21-10; 8:45 am]