Combined Notice of Filings #1, 35015-35016 [2010-14855]
Download as PDF
sroberts on DSKD5P82C1PROD with NOTICES
Federal Register / Vol. 75, No. 118 / Monday, June 21, 2010 / Notices
Docket Numbers: ER10–1400–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits revisions to Section 2 of the
Generator Interconnection Procedures in
the Attachment X of their Open Access
Transmission, etc.
Filed Date: 06/04/2010.
Accession Number: 20100607–0202.
Comment Date: 5 p.m. Eastern Time
on Friday, June 25, 2010.
Docket Numbers: ER10–1401–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
proposed amendments to its approved
tariff to implement a revised
transmission planning process.
Filed Date: 06/04/2010.
Accession Number: 20100607–0203.
Comment Date: 5 p.m. Eastern Time
on Friday, June 25, 2010.
Docket Numbers: ER10–1402–000.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection,
LLC submits an executed Wholesale
Market Participation Agreement with
Charleston Clean Energy, LLC et al.
Filed Date: 06/07/2010.
Accession Number: 20100607–0206.
Comment Date: 5 p.m. Eastern Time
on Monday, June 28, 2010.
Docket Numbers: ER10–1403–000.
Applicants: Stephentown Regulation
Services LLC.
Description: Application of
Stephentown Regulation Services LLC
for acceptance of a market-based rate
tariff and granting of waivers and
blanket authorization.
Filed Date: 06/07/2010.
Accession Number: 20100607–0207.
Comment Date: 5 p.m. Eastern Time
on Monday, June 28, 2010.
Docket Numbers: ER10–1404–000.
Applicants: Delmarva Power & Light
Company.
Description: Delmarva Power & Light
Company submits an executed
Interconnection and Mutual Operating
Agreement with Town of Smyma,
Delaware.
Filed Date: 06/07/2010.
Accession Number: 20100607–0208.
Comment Date: 5 p.m. Eastern Time
on Monday, June 28, 2010.
Docket Numbers: ER10–1405–000.
Applicants: Tampa Electric Company.
Description: Tampa Electric Company
submits the Interconnection and
Operating Agreement with Florida
Power Corporation for the Dade City
Substation Interconnection.
Filed Date: 06/07/2010.
VerDate Mar<15>2010
15:46 Jun 18, 2010
Jkt 220001
Accession Number: 20100607–0209.
Comment Date: 5 p.m. Eastern Time
on Monday, June 28, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
35015
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–14857 Filed 6–18–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
June 09, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER09–1142–007.
Applicants: New York Independent
System Operator Inc.
Description: Explanation of how the
New York Independent System
Operator, Inc’s proposed Tariff revisions
that are pending in address the
requirements of the Commission’s May
6, 2010 Order.
Filed Date: 06/02/2010.
Accession Number: 20100602–5096.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 23, 2010.
Docket Numbers: ER10–1222–001.
Applicants: DTE East China, LLC.
Description: DTE East China, LLC
submits tariff filing per 35: DTE East
China—Baseline Tariff Withdraw to be
effective 5/14/2010.
Filed Date: 06/08/2010.
Accession Number: 20100608–5068.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 29, 2010.
Docket Numbers: ER10–1299–001.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits an Amendment to the
Interconnection and Balancing Area
Services Agreement with Midwest
Energy, Inc, Rate Schedule FERC No
340.
Filed Date: 06/08/2010.
Accession Number: 20100609–0203.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 29, 2010.
Docket Numbers: ER10–1406–000.
Applicants: Lake Cogen, Ltd.
E:\FR\FM\21JNN1.SGM
21JNN1
sroberts on DSKD5P82C1PROD with NOTICES
35016
Federal Register / Vol. 75, No. 118 / Monday, June 21, 2010 / Notices
Description: Lake Cogen, Ltd. submits
its baseline tariff filing, FERC Electric
Tariff, Original Volume No 1, to be
effective 6/9/2010.
Filed Date: 06/09/2010.
Accession Number: 20100609–5000.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 30, 2010.
Docket Numbers: ER10–1407–000.
Applicants: Florida Power
Corporation.
Description: Florida Power
Corporation submits their
Interconnection and Operating
Agreement with Tampa Electric
Company for the Dade City Substation
Interconnection, dated June 1, 2010.
Filed Date: 06/08/2010.
Accession Number: 20100609–0202.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 29, 2010.
Docket Numbers: ER10–1408–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits a
Notice of Termination relation to a
Large Generator Interconnection
Agreement.
Filed Date: 06/08/2010.
Accession Number: 20100609–0201.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 29, 2010.
Docket Numbers: ER10–1409–000.
Applicants: Central Hudson Gas &
Electric Corporation.
Description: Central Hudson Gas &
Electric Corp submits an executed Small
Generator Interconnection Agreement
with West Delaware Hydro Associates
LP dated 5/27/10 etc.
Filed Date: 06/09/2010.
Accession Number: 20100609–0204.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 30, 2010.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES10–48–000.
Applicants: Trans-Allegheny
Interstate Line Company.
Description: Application of TransAllegheny Interstate Line Company for
authorization under Section 204 of the
Federal Power Act to issue or borrow up
to $300 Million in Short-Term Debt or
Long-Term Debt to fund capital
expenditures etc.
Filed Date: 06/08/2010.
Accession Number: 20100608–5094.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 29, 2010.
Docket Numbers: ES10–49–000.
Applicants: Entergy Power, LLC.
Description: Application of Entergy
Power, LLC, for Authorizations under
FPA Section 204.
VerDate Mar<15>2010
15:46 Jun 18, 2010
Jkt 220001
Filed Date: 06/08/2010.
Accession Number: 20100608–5110.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 29, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–14855 Filed 6–18–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–1425–000]
EDF Industrial Power Services (NY),
LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
June 15, 2010.
This is a supplemental notice in the
above-referenced proceeding of EDF
Industrial Power Services (NY), LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 6, 2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
E:\FR\FM\21JNN1.SGM
21JNN1
Agencies
[Federal Register Volume 75, Number 118 (Monday, June 21, 2010)]
[Notices]
[Pages 35015-35016]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-14855]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
June 09, 2010.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER09-1142-007.
Applicants: New York Independent System Operator Inc.
Description: Explanation of how the New York Independent System
Operator, Inc's proposed Tariff revisions that are pending in address
the requirements of the Commission's May 6, 2010 Order.
Filed Date: 06/02/2010.
Accession Number: 20100602-5096.
Comment Date: 5 p.m. Eastern Time on Wednesday, June 23, 2010.
Docket Numbers: ER10-1222-001.
Applicants: DTE East China, LLC.
Description: DTE East China, LLC submits tariff filing per 35: DTE
East China--Baseline Tariff Withdraw to be effective 5/14/2010.
Filed Date: 06/08/2010.
Accession Number: 20100608-5068.
Comment Date: 5 p.m. Eastern Time on Tuesday, June 29, 2010.
Docket Numbers: ER10-1299-001.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc submits an Amendment to the
Interconnection and Balancing Area Services Agreement with Midwest
Energy, Inc, Rate Schedule FERC No 340.
Filed Date: 06/08/2010.
Accession Number: 20100609-0203.
Comment Date: 5 p.m. Eastern Time on Tuesday, June 29, 2010.
Docket Numbers: ER10-1406-000.
Applicants: Lake Cogen, Ltd.
[[Page 35016]]
Description: Lake Cogen, Ltd. submits its baseline tariff filing,
FERC Electric Tariff, Original Volume No 1, to be effective 6/9/2010.
Filed Date: 06/09/2010.
Accession Number: 20100609-5000.
Comment Date: 5 p.m. Eastern Time on Wednesday, June 30, 2010.
Docket Numbers: ER10-1407-000.
Applicants: Florida Power Corporation.
Description: Florida Power Corporation submits their
Interconnection and Operating Agreement with Tampa Electric Company for
the Dade City Substation Interconnection, dated June 1, 2010.
Filed Date: 06/08/2010.
Accession Number: 20100609-0202.
Comment Date: 5 p.m. Eastern Time on Tuesday, June 29, 2010.
Docket Numbers: ER10-1408-000.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corporation
submits a Notice of Termination relation to a Large Generator
Interconnection Agreement.
Filed Date: 06/08/2010.
Accession Number: 20100609-0201.
Comment Date: 5 p.m. Eastern Time on Tuesday, June 29, 2010.
Docket Numbers: ER10-1409-000.
Applicants: Central Hudson Gas & Electric Corporation.
Description: Central Hudson Gas & Electric Corp submits an executed
Small Generator Interconnection Agreement with West Delaware Hydro
Associates LP dated 5/27/10 etc.
Filed Date: 06/09/2010.
Accession Number: 20100609-0204.
Comment Date: 5 p.m. Eastern Time on Wednesday, June 30, 2010.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES10-48-000.
Applicants: Trans-Allegheny Interstate Line Company.
Description: Application of Trans-Allegheny Interstate Line Company
for authorization under Section 204 of the Federal Power Act to issue
or borrow up to $300 Million in Short-Term Debt or Long-Term Debt to
fund capital expenditures etc.
Filed Date: 06/08/2010.
Accession Number: 20100608-5094.
Comment Date: 5 p.m. Eastern Time on Tuesday, June 29, 2010.
Docket Numbers: ES10-49-000.
Applicants: Entergy Power, LLC.
Description: Application of Entergy Power, LLC, for Authorizations
under FPA Section 204.
Filed Date: 06/08/2010.
Accession Number: 20100608-5110.
Comment Date: 5 p.m. Eastern Time on Tuesday, June 29, 2010.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
As it relates to any qualifying facility filings, the notices of
self-certification [or self-recertification] listed above, do not
institute a proceeding regarding qualifying facility status. A notice
of self-certification [or self-recertification] simply provides
notification that the entity making the filing has determined the
facility named in the notice meets the applicable criteria to be a
qualifying facility. Intervention and/or protest do not lie in dockets
that are qualifying facility self-certifications or self-
recertifications. Any person seeking to challenge such qualifying
facility status may do so by filing a motion pursuant to 18 CFR
292.207(d)(iii). Intervention and protests may be filed in response to
notices of qualifying facility dockets other than self-certifications
and self-recertifications.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010-14855 Filed 6-18-10; 8:45 am]
BILLING CODE 6717-01-P