Environmental Impacts Statements; Notice of Availability, 34737-34738 [2010-14767]

Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 75, No. 117 / Friday, June 18, 2010 / Notices Strategic Plan will be submitted to Congress by September 30, 2010. The Strategic Plan provides the Agency’s long-term direction and strategies to improve environmental and human health over the next five years. For this notice, the EPA is seeking comment from individual citizens, states, tribes, local government, industry, the academic community, nongovernmental organizations, and all other interested parties. The Agency is particularly interested in feedback addressing the goal narratives, crosscutting fundamental strategies, and strategic measures, with a focus on new directions and strategies. DATES: Comments must be received on or before July 30, 2010. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– OA–2010–0486, by one of the following methods (electronic submission preferred): Electronic: Federal eRulemaking Portal: https://www.regulations.gov. Follow the on-line instructions for submitting comments. Fax: ATTN: Vivian Daub, Director, Planning Staff, Fax number: (202) 564– 1808. Mail: ATTN: Vivian Daub, Director, Planning Staff. Office of Planning, Analysis, and Accountability (Mail Code 2723A), Office of the Chief Financial Officer, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave, NW., Washington, DC 20460. Important: Please allow a minimum of two weeks from date postmarked to allow ample time for receipt. FOR FURTHER INFORMATION CONTACT: Vivian Daub, Director, Planning Staff, Office of Planning, Analysis, and Accountability, Office of the Chief Financial Officer Strategic_Plan@epa.gov. Instructions: EPA’s policy is that all comments received will be included in the public docket without change and may be made available online at https://www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through https:// www.regulations.gov or e-mail. The https://www.regulations.gov Web site is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly VerDate Mar<15>2010 16:17 Jun 17, 2010 Jkt 220001 to EPA without going through https:// www.regulations.gov your e-mail address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. For additional information about EPA’s public docket visit the EPA Docket Center homepage at https:// www.epa.gov/dockets/. 34737 measures by which the Agency will hold itself accountable. Dated: June 3, 2010. Maryann Froehlich, Deputy Chief Financial Officer, Office of the Chief Financial Officer. [FR Doc. 2010–14649 Filed 6–17–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8990–9] Environmental Impacts Statements; Notice of Availability Background Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements. Filed 06/07/2010 Through 06/11/2010. Pursuant to 40 CFR 1506.9. The GPRA holds federal agencies accountable for using resources wisely and achieving program results. Specifically, GPRA requires agencies to develop: Strategic Plans, which include a mission statement and set out longterm goals, objectives, and strategic measures over a five-year time horizon; Annual Performance Plans, which provide annual performance measures toward achieving the goals and objectives set forth in the Strategic Plan; and, Performance and Accountability Reports, which evaluate an agency’s success in achieving the annual performance measures. The Draft FY 2011–2015 EPA Strategic Plan reflects the Administrator’s priorities for advancing environmental protection. The Plan presents five strategic goals to accelerate protection of the environment and human health and five cross-cutting fundamental strategies for changing the way the Agency works. The five strategic goals are: Taking Action on Climate Change and Improving Air Quality, Protecting America’s Waters, Cleaning Up Our Communities, Ensuring the Safety of Chemicals and Preventing Pollution, and Enforcing Environmental Laws. The five crosscutting fundamental strategies are: Expanding the conversation on environmentalism; working for environmental justice and children’s health; advancing science, research, and technological innovation; strengthening state, tribal, and international partnerships; and strengthening EPA’s workforce and capabilities. The Plan also identifies a suite of strategic Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100217, Draft Supplement, USFS, MT, Young Dodge Project, Proposed Timber Harvest and Associate Activities, Updated Information on the First 3 Alternatives, Prescribed Burning, Road and Recreation Management, Kootenai National Forest, Rexford Ranger District, Lincoln County, MT, Comment Period Ends: 08/02/2010, Contact: Ron Komac 406–296–2536. EIS No. 20100218, Final EIS, BR, CA, North Bay Water Recycling Program (NBWRP), (Formerly North San Pablo Bay Restoration and Reuse Project), Proposed to Promote the Expanded Beneficial Use of Recycled Water, North Marin Water District, Napa County, CA, Wait Period Ends: 07/19/ SUPPLEMENTARY INFORMATION: PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\18JNN1.SGM 18JNN1 34738 Federal Register / Vol. 75, No. 117 / Friday, June 18, 2010 / Notices 2010, Contact: David White 916–978– 5074. EIS No. 20100219, Draft Supplement, USFS, WY, Upper Green River Area Rangeland Project, Updated Information to the Analyze the Effects of Domestic Livestock Grazing in the Upper Green River Area, BridgerTeton Forest, Sublette, Teton and Fremont Counties, WY, Comment Period Ends: 08/02/2010, Contact: Dave Booth 307–367–4326. EIS No. 20100220, Final Supplement, FSA, 00, PROGRAMMATIC— Conservation Reserve Program (CRP), Implement Certain Changes to the CRP as Enacted by Congress in the 2008 Farm Bill, in the United States, Wait Period Ends: 07/19/2010, Contact: Matthew T. Ponish 202–720– 6853. EIS No. 20100221, Draft EIS, NPS, IL, Lincoln Home National Historic Site, General Management Plan, Implementation, Sangamon County, Springfield, IL, Comment Period Ends: 08/16/2010, Contact: Nick Chevance 402–661–1844. EIS No. 20100222, Draft EIS, USFS, OR, Mill Creek Allotment Management Plans Project, Reauthorization of Grazing Permit on Five Grazing Allotments, Lookout Mountain Ranger District, Ochoco National Forest, Crook County, OR, Comment Period Ends: 08/02/2010, Contact: Marcy Anderson 541–416–6463. EIS No. 20100223, Draft EIS, GSA, CA, Calexico West Land Port of Entry in Calexico, Expansion of the Reconfiguration, Implementation, CA, Comment Period Ends: 08/16/2010, Contact: Greg Smith 619–557–6169. EIS No. 20100224, Final EIS, USACE, CA, Newhall Ranch Resource Management and Development Plan (RMDP) and the Spineflower Conservation Plan (SCP), Implementation, Portion of Santa Clara River Valley, Los Angeles County, CA, Wait Period Ends: 07/19/ 2010, Contact: Dr. Aaron O. Allen 805–585–2148. srobinson on DSKHWCL6B1PROD with NOTICES Amended Notices EIS No. 20100208, Final EIS, USA, VA, Fort Monroe US Army Garrison Base Realignment and Closure (BRAC) 2005 Disposal and Reuse of Surplus Nonreverting Property, Fort Monroe, VA, Wait Period Ends: 07/12/2010, Contact: Bob Ross 703–602–2878. Revision to FR Notice Published 06/11/ 2010: Correction to document status from draft to final. VerDate Mar<15>2010 16:17 Jun 17, 2010 Jkt 220001 Dated: June 15, 2010. Ken Mittelholtz, Deputy Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–14767 Filed 6–17–10; 8:45 am] BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION Notice of Public Information Collection(s) Being Reviewed by the Federal Communications Commission, Comments Requested June 14, 2010. SUMMARY: The Federal Communications Commission, as part of its continuing effort to reduce paperwork burden invites the general public and other Federal agencies to take this opportunity to comment on the following information collection(s), as required by the Paperwork Reduction Act (PRA) of 1995, 44 U.S.C. 3501 – 3520. Comments are requested concerning: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; (b) the accuracy of the Commission’s burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; (d) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology, and (e) ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a currently valid OMB control number. DATES: Written Paperwork Reduction Act (PRA) comments should be submitted on or before August 17, 2010. If you anticipate that you will be submitting PRA comments, but find it difficult to do so within the period of time allowed by this notice, you should advise the FCC contact listed below as soon as possible. ADDRESSES: Direct all PRA comments to Nicholas A. Fraser, Office of Management and Budget, via fax at 202– 395–5167 or via the Internet at Nicholas_A._Fraser@omb.eop.gov and PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 to the Federal Communications Commission via email to PRA@fcc.gov. FOR FURTHER INFORMATION CONTACT: Judith B. Herman, Office of Managing Director, (202) 418–0214. For additional information, contact Judith B. Herman, OMD, 202–418–0214 or email judith– b.herman@fcc.gov. SUPPLEMENTARY INFORMATION: OMB Control Number: 3060–0853. Title: Certification by Administrative Authority to Billed Entity Compliance with the Children’s Internet Protection Act/ Receipt of Service Confirmation; and Adjustment to Funding Commitment and Modification to Receipt of Service Confirmation Form. Form Nos.: FCC Forms 479, 486 and 500. Type of Review: Extension of a currently approved collection. Respondents: Business or other for– profit, not–for–profit institutions, and state, local or tribal government. Number of Respondents and Responses: 45,000 respondents; 45,000 responses. Estimated Time Per Response: 1 – 1.5 hours. Frequency of Response: On occasion and annual reporting requirements, recordkeeping requirement and third party disclosure requirement. Obligation to Respond: Required to obtain or retain benefits. Statutory authority for this information collection is contained in 47 U.S.C. sections 151 – 154, 201 – 205, 218 – 220, 254, 303(r), 403 and 405. Total Annual Burden: 62,500 hours. Total Annual Cost: N/A. Privacy Act Impact Assessment: N/A. Nature and Extent of Confidentiality: The Commission is not requesting that respondents submit confidential information to the Commission. If the Commission requests applicants to submit information that the respondents believe is confidential, respondents may request confidential treatment of such information under 47 CFR 0.459 of the Commission’s rules. Needs and Uses: The Commission will submit this expiring information collection after this comment period in order to obtain the full three year clearance from the Office of Management and Budget (OMB). The Commission is requesting an extension (no change in the reporting, recordkeeping and/or third party disclosure requirements). There is no change in the Commission’s burden estimates since this was submitted to the OMB in 2006. The purpose of this collection is to ensure that schools and libraries that are eligible to receive discounted Internet E:\FR\FM\18JNN1.SGM 18JNN1

Agencies

[Federal Register Volume 75, Number 117 (Friday, June 18, 2010)]
[Notices]
[Pages 34737-34738]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-14767]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8990-9]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 06/07/2010 Through 06/11/2010.
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100217, Draft Supplement, USFS, MT, Young Dodge Project, 
Proposed Timber Harvest and Associate Activities, Updated Information 
on the First 3 Alternatives, Prescribed Burning, Road and Recreation 
Management, Kootenai National Forest, Rexford Ranger District, Lincoln 
County, MT, Comment Period Ends: 08/02/2010, Contact: Ron Komac 406-
296-2536.

EIS No. 20100218, Final EIS, BR, CA, North Bay Water Recycling Program 
(NBWRP), (Formerly North San Pablo Bay Restoration and Reuse Project), 
Proposed to Promote the Expanded Beneficial Use of Recycled Water, 
North Marin Water District, Napa County, CA, Wait Period Ends: 07/19/

[[Page 34738]]

2010, Contact: David White 916-978-5074.

EIS No. 20100219, Draft Supplement, USFS, WY, Upper Green River Area 
Rangeland Project, Updated Information to the Analyze the Effects of 
Domestic Livestock Grazing in the Upper Green River Area, Bridger-Teton 
Forest, Sublette, Teton and Fremont Counties, WY, Comment Period Ends: 
08/02/2010, Contact: Dave Booth 307-367-4326.

EIS No. 20100220, Final Supplement, FSA, 00, PROGRAMMATIC--Conservation 
Reserve Program (CRP), Implement Certain Changes to the CRP as Enacted 
by Congress in the 2008 Farm Bill, in the United States, Wait Period 
Ends: 07/19/2010, Contact: Matthew T. Ponish 202-720-6853.

EIS No. 20100221, Draft EIS, NPS, IL, Lincoln Home National Historic 
Site, General Management Plan, Implementation, Sangamon County, 
Springfield, IL, Comment Period Ends: 08/16/2010, Contact: Nick 
Chevance 402-661-1844.

EIS No. 20100222, Draft EIS, USFS, OR, Mill Creek Allotment Management 
Plans Project, Reauthorization of Grazing Permit on Five Grazing 
Allotments, Lookout Mountain Ranger District, Ochoco National Forest, 
Crook County, OR, Comment Period Ends: 08/02/2010, Contact: Marcy 
Anderson 541-416-6463.

EIS No. 20100223, Draft EIS, GSA, CA, Calexico West Land Port of Entry 
in Calexico, Expansion of the Reconfiguration, Implementation, CA, 
Comment Period Ends: 08/16/2010, Contact: Greg Smith 619-557-6169.

EIS No. 20100224, Final EIS, USACE, CA, Newhall Ranch Resource 
Management and Development Plan (RMDP) and the Spineflower Conservation 
Plan (SCP), Implementation, Portion of Santa Clara River Valley, Los 
Angeles County, CA, Wait Period Ends: 07/19/2010, Contact: Dr. Aaron O. 
Allen 805-585-2148.

Amended Notices

EIS No. 20100208, Final EIS, USA, VA, Fort Monroe US Army Garrison Base 
Realignment and Closure (BRAC) 2005 Disposal and Reuse of Surplus 
Nonreverting Property, Fort Monroe, VA, Wait Period Ends: 07/12/2010, 
Contact: Bob Ross 703-602-2878.

Revision to FR Notice Published 06/11/2010: Correction to document 
status from draft to final.

    Dated: June 15, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2010-14767 Filed 6-17-10; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.